Construction of the S3 expressway Nowa Sól – Legnica, odc. w. Nowa Sól Płd. — w. Kaźmierzów (without no knot) (Q85823): Difference between revisions
Jump to navigation
Jump to search
(Created claim: summary (P836): Le projet prévoit la construction de l’autoroute S3 Nowa Sól — Legnica — depuis Nowa Sól Pold. — C. Kaźmierzów (sans nœud) d’une longueur de 33,3 km. L’investissement passe par les voïvodies de Lubuskie et de Basse-Silésie (à partir de la commune de Nowe Miasteczko, puis la route passe par les municipalités Bytom Odrzański et Niegosławice, traverse les frontières de la province, traverse les communes de Gaworzyce, Radwanice, Jerzmanowa et entre...) |
(Removed claim: contained in NUTS (P1845): Legnicko-głogowski (Q2577105), Removing duplicate contained in NUTS) |
||
Property / contained in NUTS | |||
Property / contained in NUTS: Legnicko-głogowski / rank | |||
Revision as of 11:20, 3 December 2021
Project Q85823 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Construction of the S3 expressway Nowa Sól – Legnica, odc. w. Nowa Sól Płd. — w. Kaźmierzów (without no knot) |
Project Q85823 in Poland |
Statements
570,210,865.53 zloty
0 references
670,836,312.39 zloty
0 references
85.0 percent
0 references
1 January 2014
0 references
31 December 2018
0 references
GENERALNA DYREKCJA DRÓG KRAJOWYCH I AUTOSTRAD
0 references
Przedsięwzięcie przewiduje budowę drogi ekspresowej S3 Nowa Sól - Legnica - odc. w. Nowa Sól Płd. - w. Kaźmierzów (bez węzła) o długości 33,3 km. Inwestycja przebiega przez obszar Województwa Lubuskiego i Dolny Śląsk (rozpoczyna się w gminie Nowe Miasteczko, następnie trasa przechodzi przez gminy Bytom Odrzański i Niegosławice, przecina granice województwa, dalej przekracza gminy Gaworzyce, Radwanice, Jerzmanowa i dochodzi do gminy Polkowice). Na całym odcinku projektowanej trasy przewidziano przekrój dwujezdniowy z dwoma pasami ruchu, pasem dzielącym (w tym rezerwa pod trzeci pas ruchu) oraz pasem awaryjnym. (Polish)
0 references
The project provides for the construction of an expressway S3 Nowa Sól – Legnica – odc. w. Nowa Sól Płd. — w. Kaźmierzów (without a knot) with a length of 33.3 km. The investment runs through the area of Lubuskie Voivodeship and Dolny Śląsk (starting in the commune Nowe Miasteczko, then the route passes through the communes of Bytom Odrzański and Niegosławice, crosses the boundaries of the voivodeship, further crosses the communes of Gaworzyce, Radwanice, Jerzmanowa and reaches the commune of Polkowice). A two-way cross-section with two lanes, a dividing lane (including a reserve for the third lane) and an emergency lane is provided throughout the projected route. (English)
14 October 2020
0 references
Le projet prévoit la construction de l’autoroute S3 Nowa Sól — Legnica — depuis Nowa Sól Pold. — C. Kaźmierzów (sans nœud) d’une longueur de 33,3 km. L’investissement passe par les voïvodies de Lubuskie et de Basse-Silésie (à partir de la commune de Nowe Miasteczko, puis la route passe par les municipalités Bytom Odrzański et Niegosławice, traverse les frontières de la province, traverse les communes de Gaworzyce, Radwanice, Jerzmanowa et entre dans la municipalité de Polkowice). Un tronçon à deux voies avec deux voies, une voie de partage (y compris une réserve pour la troisième voie) et une voie d’urgence sont prévus pour l’ensemble du tronçon de l’itinéraire prévu. (French)
30 November 2021
0 references
Identifiers
POIS.03.01.00-00-0002/15
0 references