Lot 19 “Road III-663 Chirpan — Simeonovgrad from km 0+ 000 to km 15+ 220, with a total length of 15.220 km, St. Zagora district” (Q3835756): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): The main result to be achieved with the implementation of the project is 15.220 km of rehabilitated road section of road III-663. With the improvement of the transport and operational qualities of the existing road section, the road safety and comfort of the travelling residents of the town of Chirpan, Zetjovo and Celina villages will be ensured, improving the state of the environment by reducing harmful greenhouse gas emissions and extending th...)
(‎Changed label, description and/or aliases in fr, and other parts: Adding French translations)
label / frlabel / fr
 
Lot 19 «Route III-663 Chirpan — Simeonovgrad du km 0+ 000 au km 15+ 220, d’une longueur totale de 15,220 km, district de St. Zagora»
Property / summary
 
Le principal résultat à atteindre avec la mise en œuvre du projet est de 15 220 km de tronçon routier réhabilité de la route III-663. Avec l’amélioration du transport et des qualités opérationnelles du tronçon routier existant, la sécurité routière et le confort des résidents itinérants des villages de Chirpan, Zetjovo et Celina seront assurés, améliorer l’état de l’environnement en réduisant les émissions nocives de gaz à effet de serre et prolonger la durée de vie de la route. Améliorer la qualité de vie et l’environnement de travail de la population, attirer les investissements, garantir l’accès à l’éducation et aux soins médicaux, stimuler le développement du tourisme, ainsi que les possibilités d’accroître la compétitivité dans la région, en améliorant l’accessibilité du réseau RTE-T de fret et de passagers dans la région, ce qui permet également d’atteindre l’objectif du régime actuel de subventions. Grâce à la remise en état de la route III-663, les besoins de la population de la région du Sud-Est de la Bulgarie, en particulier les habitants de la région de Stara Zagora, ainsi que le transit par la région, seront satisfaits. Les principales activités prévues pour la mise en œuvre réussie du projet sont les suivantes: La formation d’une équipe de gestion de projet chargée de coordonner toutes les activités et tous les participants à la mise en œuvre du projet; La sélection d’un entrepreneur pour la réalisation des travaux de construction, la signature d’un contrat avec lui et la réhabilitation du chantier; — Sélection d’un contractant pour la supervision de la construction (conseiller) du projet, signature d’un contrat avec celui-ci et prestation de services de conseil; — Assurer la supervision du site par l’auteur; La sélection d’un contractant pour la mise en œuvre des actions d’information et de publicité, la conclusion d’un contrat avec lui et la mise en œuvre de l’information et de la publicité; — Sélection de l’auditeur du projet, signature d’un contrat avec le projet et audit du projet; — Mise en service du site, vérification des coûts et communication des résultats obtenus. (French)
Property / summary: Le principal résultat à atteindre avec la mise en œuvre du projet est de 15 220 km de tronçon routier réhabilité de la route III-663. Avec l’amélioration du transport et des qualités opérationnelles du tronçon routier existant, la sécurité routière et le confort des résidents itinérants des villages de Chirpan, Zetjovo et Celina seront assurés, améliorer l’état de l’environnement en réduisant les émissions nocives de gaz à effet de serre et prolonger la durée de vie de la route. Améliorer la qualité de vie et l’environnement de travail de la population, attirer les investissements, garantir l’accès à l’éducation et aux soins médicaux, stimuler le développement du tourisme, ainsi que les possibilités d’accroître la compétitivité dans la région, en améliorant l’accessibilité du réseau RTE-T de fret et de passagers dans la région, ce qui permet également d’atteindre l’objectif du régime actuel de subventions. Grâce à la remise en état de la route III-663, les besoins de la population de la région du Sud-Est de la Bulgarie, en particulier les habitants de la région de Stara Zagora, ainsi que le transit par la région, seront satisfaits. Les principales activités prévues pour la mise en œuvre réussie du projet sont les suivantes: La formation d’une équipe de gestion de projet chargée de coordonner toutes les activités et tous les participants à la mise en œuvre du projet; La sélection d’un entrepreneur pour la réalisation des travaux de construction, la signature d’un contrat avec lui et la réhabilitation du chantier; — Sélection d’un contractant pour la supervision de la construction (conseiller) du projet, signature d’un contrat avec celui-ci et prestation de services de conseil; — Assurer la supervision du site par l’auteur; La sélection d’un contractant pour la mise en œuvre des actions d’information et de publicité, la conclusion d’un contrat avec lui et la mise en œuvre de l’information et de la publicité; — Sélection de l’auditeur du projet, signature d’un contrat avec le projet et audit du projet; — Mise en service du site, vérification des coûts et communication des résultats obtenus. (French) / rank
 
Normal rank
Property / summary: Le principal résultat à atteindre avec la mise en œuvre du projet est de 15 220 km de tronçon routier réhabilité de la route III-663. Avec l’amélioration du transport et des qualités opérationnelles du tronçon routier existant, la sécurité routière et le confort des résidents itinérants des villages de Chirpan, Zetjovo et Celina seront assurés, améliorer l’état de l’environnement en réduisant les émissions nocives de gaz à effet de serre et prolonger la durée de vie de la route. Améliorer la qualité de vie et l’environnement de travail de la population, attirer les investissements, garantir l’accès à l’éducation et aux soins médicaux, stimuler le développement du tourisme, ainsi que les possibilités d’accroître la compétitivité dans la région, en améliorant l’accessibilité du réseau RTE-T de fret et de passagers dans la région, ce qui permet également d’atteindre l’objectif du régime actuel de subventions. Grâce à la remise en état de la route III-663, les besoins de la population de la région du Sud-Est de la Bulgarie, en particulier les habitants de la région de Stara Zagora, ainsi que le transit par la région, seront satisfaits. Les principales activités prévues pour la mise en œuvre réussie du projet sont les suivantes: La formation d’une équipe de gestion de projet chargée de coordonner toutes les activités et tous les participants à la mise en œuvre du projet; La sélection d’un entrepreneur pour la réalisation des travaux de construction, la signature d’un contrat avec lui et la réhabilitation du chantier; — Sélection d’un contractant pour la supervision de la construction (conseiller) du projet, signature d’un contrat avec celui-ci et prestation de services de conseil; — Assurer la supervision du site par l’auteur; La sélection d’un contractant pour la mise en œuvre des actions d’information et de publicité, la conclusion d’un contrat avec lui et la mise en œuvre de l’information et de la publicité; — Sélection de l’auditeur du projet, signature d’un contrat avec le projet et audit du projet; — Mise en service du site, vérification des coûts et communication des résultats obtenus. (French) / qualifier
 
point in time: 3 December 2021
Timestamp+2021-12-03T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 09:35, 3 December 2021

Project Q3835756 in Bulgaria
Language Label Description Also known as
English
Lot 19 “Road III-663 Chirpan — Simeonovgrad from km 0+ 000 to km 15+ 220, with a total length of 15.220 km, St. Zagora district”
Project Q3835756 in Bulgaria

    Statements

    0 references
    10,485,041.67 Bulgarian lev
    0 references
    5,347,371.25 Euro
    1 December 2021
    0 references
    12,335,343.14 Bulgarian lev
    0 references
    6,291,025.0 Euro
    1 December 2021
    0 references
    0.85 percent
    0 references
    12 April 2017
    0 references
    7 December 2020
    0 references
    0 references
    Основният резултат, който ще бъде постигнат с реализацията на проекта е 15.220 км рехабилитиран пътен участък от път IIІ–663. С подобряването на транспортно-експлоатационните качества на съществуващия пътен участък, ще се осигурят безопасност на движението и комфорт на пътуващите жители на гр. Чирпан, с. Зетьово и с. Целина, подобряване на състоянието на околната среда чрез намаляване на вредни емисии на парникови газове и удължаване експлоатационния живот на пътя. Ще се подобри качеството на живот и работна среда на населението, ще се привлекат инвестиции, ще се осигури достъп до образование и медицински грижи, ще се стимулира развитието на туризъм, както и възможности за повишаване конкурентноспособността в региона, чрез подобряване достъпността до TEN-T мрежата на товари и пътници в рамките на региона, с което се постига и целта на настоящата схема за предоставяне на безвъзмездна помощ. Чрез реализацията на рехабилитацията на път ІІI-663 ще бъдат удовлетворени потребностите на населението на Югоизточен район на България, най-вече на жителите на област Стара Загора, както и транзитно прминаващите през региона. Основните дейности, които са заложени за успешната реализацията на проекта са: - Сформиране на екип за управление на проекта, който да координира всички дейности и участници в реализацията на проекта ; - Избор на изпълнител за извършване на строително монтажни работи, подписване на договор с него и извършване на рехабилитация на обекта; - Избор на изпълнител на строителен надзор (Консултант) на проекта, подписване на договор с него и извършване на консултантски услуги; - Осъществяване на авторски надзор на обекта; - Избор на изпълнител за осъществяване на мерките по информация и публичност, сключване договор с него и осъществяване на информация и публичност; - Избор на одитор на проекта, подписване на договор с него и извършване одит на проекта; - Въвеждане на обекта в експлоатация, верификация на разходите и отчитане на постигнатите резултати. (Bulgarian)
    0 references
    The main result to be achieved with the implementation of the project is 15.220 km of rehabilitated road section of road III-663. With the improvement of the transport and operational qualities of the existing road section, the road safety and comfort of the travelling residents of the town of Chirpan, Zetjovo and Celina villages will be ensured, improving the state of the environment by reducing harmful greenhouse gas emissions and extending the service life of the road. Improving the quality of life and working environment of the population, attracting investment, ensuring access to education and medical care, stimulating the development of tourism, as well as opportunities to increase competitiveness in the region, by improving the accessibility of the TEN-T network of freight and passengers within the region, thus also achieving the objective of the current grant scheme. Through the implementation of the rehabilitation of road III-663, the needs of the population of the South-East region of Bulgaria, especially the inhabitants of the Stara Zagora region, as well as transit through the region, will be met. The main activities set for the successful implementation of the project are: — Formation of a project management team to coordinate all activities and participants in the implementation of the project; — Selection of a contractor for carrying out construction works, signing a contract with him and carrying out rehabilitation of the site; — Selection of a contractor for construction supervision (Consultant) of the project, signing a contract with it and providing consulting services; — Carrying out author’s supervision of the site; — Selection of a contractor for the implementation of the information and publicity measures, the conclusion of a contract with him and the implementation of information and publicity; — Selecting the project auditor, signing a contract with the project and auditing the project; — Commissioning of the site, verification of costs and reporting of the results achieved. (English)
    2 December 2021
    0 references
    Le principal résultat à atteindre avec la mise en œuvre du projet est de 15 220 km de tronçon routier réhabilité de la route III-663. Avec l’amélioration du transport et des qualités opérationnelles du tronçon routier existant, la sécurité routière et le confort des résidents itinérants des villages de Chirpan, Zetjovo et Celina seront assurés, améliorer l’état de l’environnement en réduisant les émissions nocives de gaz à effet de serre et prolonger la durée de vie de la route. Améliorer la qualité de vie et l’environnement de travail de la population, attirer les investissements, garantir l’accès à l’éducation et aux soins médicaux, stimuler le développement du tourisme, ainsi que les possibilités d’accroître la compétitivité dans la région, en améliorant l’accessibilité du réseau RTE-T de fret et de passagers dans la région, ce qui permet également d’atteindre l’objectif du régime actuel de subventions. Grâce à la remise en état de la route III-663, les besoins de la population de la région du Sud-Est de la Bulgarie, en particulier les habitants de la région de Stara Zagora, ainsi que le transit par la région, seront satisfaits. Les principales activités prévues pour la mise en œuvre réussie du projet sont les suivantes: La formation d’une équipe de gestion de projet chargée de coordonner toutes les activités et tous les participants à la mise en œuvre du projet; La sélection d’un entrepreneur pour la réalisation des travaux de construction, la signature d’un contrat avec lui et la réhabilitation du chantier; — Sélection d’un contractant pour la supervision de la construction (conseiller) du projet, signature d’un contrat avec celui-ci et prestation de services de conseil; — Assurer la supervision du site par l’auteur; La sélection d’un contractant pour la mise en œuvre des actions d’information et de publicité, la conclusion d’un contrat avec lui et la mise en œuvre de l’information et de la publicité; — Sélection de l’auditeur du projet, signature d’un contrat avec le projet et audit du projet; — Mise en service du site, vérification des coûts et communication des résultats obtenus. (French)
    3 December 2021
    0 references
    Стара Загора
    0 references

    Identifiers

    BG16RFOP001-7.001-0019
    0 references