Reconstruction and rehabilitation of street network, sidewalks, facilities and accessories to them on the territory of Kirkovo Municipality (Q3885463): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in en: Setting new description) |
(Changed label, description and/or aliases in en, and other parts: Adding en translations) |
||||||||||||||
label / en | label / en | ||||||||||||||
Reconstruction and rehabilitation of street network, sidewalks, facilities and accessories to them on the territory of Kirkovo Municipality | |||||||||||||||
Property / summary | |||||||||||||||
The project proposal of Kirkovo Municipality provides for reconstruction and rehabilitation of the street network in the villages of Chakalarovo and the village of Chorbadzhiyski, including reconstruction and rehabilitation of existing sidewalks. The project includes two streets — Street 2 in the village of Chakalarovo, with a length of 950 m — from O.T. 30 to O.T. 161 and Street 1 in the village of Chorbadzhiyski, 668 m long. The project aims to end the process of demolition of the pavements and pavements and to ensure their bearing capacity, equilibrium and drainage from surface waters. (English) | |||||||||||||||
Property / summary: The project proposal of Kirkovo Municipality provides for reconstruction and rehabilitation of the street network in the villages of Chakalarovo and the village of Chorbadzhiyski, including reconstruction and rehabilitation of existing sidewalks. The project includes two streets — Street 2 in the village of Chakalarovo, with a length of 950 m — from O.T. 30 to O.T. 161 and Street 1 in the village of Chorbadzhiyski, 668 m long. The project aims to end the process of demolition of the pavements and pavements and to ensure their bearing capacity, equilibrium and drainage from surface waters. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The project proposal of Kirkovo Municipality provides for reconstruction and rehabilitation of the street network in the villages of Chakalarovo and the village of Chorbadzhiyski, including reconstruction and rehabilitation of existing sidewalks. The project includes two streets — Street 2 in the village of Chakalarovo, with a length of 950 m — from O.T. 30 to O.T. 161 and Street 1 in the village of Chorbadzhiyski, 668 m long. The project aims to end the process of demolition of the pavements and pavements and to ensure their bearing capacity, equilibrium and drainage from surface waters. (English) / qualifier | |||||||||||||||
point in time: 2 December 2021
|
Revision as of 22:43, 2 December 2021
Project Q3885463 in Bulgaria
Language | Label | Description | Also known as |
---|---|---|---|
English | Reconstruction and rehabilitation of street network, sidewalks, facilities and accessories to them on the territory of Kirkovo Municipality |
Project Q3885463 in Bulgaria |
Statements
984,367.06 Bulgarian lev
0 references
1,158,078.89 Bulgarian lev
0 references
0.85 percent
0 references
19 May 2021
0 references
15 September 2023
0 references
Q3885449 (Deleted Item)
0 references
Проектното предложение на община Кирково предвижда реконструкция и рехабилитация на уличната мрежа в с. Чакаларово и с. Чорбаджийско, включително реконструкция и рехабилитация на съществуващи тротоари. В проекта са включени две улици - Улица 2 в с. Чакаларово, с дължина 950 м - от О.Т. 30 до О.Т. 161 и улица 1 в с. Чорбаджийско, с дължина 668 м. С реализацията на проекта се цели да се преустанови процеса на разрушаване на настилките и тротоарите и да се гарантира носимоспособността, равността и отводняването им от повърхностните води. (Bulgarian)
0 references
The project proposal of Kirkovo Municipality provides for reconstruction and rehabilitation of the street network in the villages of Chakalarovo and the village of Chorbadzhiyski, including reconstruction and rehabilitation of existing sidewalks. The project includes two streets — Street 2 in the village of Chakalarovo, with a length of 950 m — from O.T. 30 to O.T. 161 and Street 1 in the village of Chorbadzhiyski, 668 m long. The project aims to end the process of demolition of the pavements and pavements and to ensure their bearing capacity, equilibrium and drainage from surface waters. (English)
2 December 2021
0 references
с.Чакаларовос.Чорбаджийско
0 references
Identifiers
BG06RDNP001-7.001-0016
0 references