Design and construction of composting plant and pretreatment plant for household waste in Petrich municipality (Q3886366): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in en: Setting new description) |
(Changed label, description and/or aliases in en, and other parts: Adding en translations) |
||||||||||||||
label / en | label / en | ||||||||||||||
Design and construction of composting plant and pretreatment plant for household waste in Petrich municipality | |||||||||||||||
Property / summary | |||||||||||||||
The overall objective of the project is to reduce the amount of municipal waste for landfilling and to increase the share of recycled and recovered waste in the municipality of Petrich, which constitutes a separate waste management region. An installation for pre-treatment of mixed municipal waste before landfilling with a capacity of 10 841 tonnes/year and a composting plant for the green waste generated on the territory of the municipality will be built with a capacity of 4 150 t/year and site infrastructure. Equipment for the operation of the installations and equipment for separate collection of green waste will be purchased. The two installations will be located close to the Petrich regional landfill. The investment under the project will also contribute to improving resource efficiency in the municipality of Petrich, as as a result of the investments the waste will become a resource — the composting plant will produce quality compost, and the pretreatment plant will separate the useful components from the mixed household waste and will be delivered for recycling. During the period of the project, the municipality will introduce a system for separate collection of green waste, which will include separate collection of garden waste from households in the town of Petrich, Parvomay, Marikostinovo, Mikhnevo village and from public parks and gardens in all settlements in Petrich municipality. The project will purchase 60 vessels with a volume of 1.1 m³ for separate collection of green waste from households and two waste collection trucks for transporting separately collected green waste in the municipality to the composting plant. The socio-economic benefits of implementing the project are to improve the quality of the environment for the residents of the municipality by reducing harmful emissions from the landfilling of waste; the creation of new jobs needed for servicing the system put in place for separate collection of green waste and for the operation of the two installed installations, etc. (English) | |||||||||||||||
Property / summary: The overall objective of the project is to reduce the amount of municipal waste for landfilling and to increase the share of recycled and recovered waste in the municipality of Petrich, which constitutes a separate waste management region. An installation for pre-treatment of mixed municipal waste before landfilling with a capacity of 10 841 tonnes/year and a composting plant for the green waste generated on the territory of the municipality will be built with a capacity of 4 150 t/year and site infrastructure. Equipment for the operation of the installations and equipment for separate collection of green waste will be purchased. The two installations will be located close to the Petrich regional landfill. The investment under the project will also contribute to improving resource efficiency in the municipality of Petrich, as as a result of the investments the waste will become a resource — the composting plant will produce quality compost, and the pretreatment plant will separate the useful components from the mixed household waste and will be delivered for recycling. During the period of the project, the municipality will introduce a system for separate collection of green waste, which will include separate collection of garden waste from households in the town of Petrich, Parvomay, Marikostinovo, Mikhnevo village and from public parks and gardens in all settlements in Petrich municipality. The project will purchase 60 vessels with a volume of 1.1 m³ for separate collection of green waste from households and two waste collection trucks for transporting separately collected green waste in the municipality to the composting plant. The socio-economic benefits of implementing the project are to improve the quality of the environment for the residents of the municipality by reducing harmful emissions from the landfilling of waste; the creation of new jobs needed for servicing the system put in place for separate collection of green waste and for the operation of the two installed installations, etc. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The overall objective of the project is to reduce the amount of municipal waste for landfilling and to increase the share of recycled and recovered waste in the municipality of Petrich, which constitutes a separate waste management region. An installation for pre-treatment of mixed municipal waste before landfilling with a capacity of 10 841 tonnes/year and a composting plant for the green waste generated on the territory of the municipality will be built with a capacity of 4 150 t/year and site infrastructure. Equipment for the operation of the installations and equipment for separate collection of green waste will be purchased. The two installations will be located close to the Petrich regional landfill. The investment under the project will also contribute to improving resource efficiency in the municipality of Petrich, as as a result of the investments the waste will become a resource — the composting plant will produce quality compost, and the pretreatment plant will separate the useful components from the mixed household waste and will be delivered for recycling. During the period of the project, the municipality will introduce a system for separate collection of green waste, which will include separate collection of garden waste from households in the town of Petrich, Parvomay, Marikostinovo, Mikhnevo village and from public parks and gardens in all settlements in Petrich municipality. The project will purchase 60 vessels with a volume of 1.1 m³ for separate collection of green waste from households and two waste collection trucks for transporting separately collected green waste in the municipality to the composting plant. The socio-economic benefits of implementing the project are to improve the quality of the environment for the residents of the municipality by reducing harmful emissions from the landfilling of waste; the creation of new jobs needed for servicing the system put in place for separate collection of green waste and for the operation of the two installed installations, etc. (English) / qualifier | |||||||||||||||
point in time: 2 December 2021
|
Revision as of 22:34, 2 December 2021
Project Q3886366 in Bulgaria
Language | Label | Description | Also known as |
---|---|---|---|
English | Design and construction of composting plant and pretreatment plant for household waste in Petrich municipality |
Project Q3886366 in Bulgaria |
Statements
5,375,957.56 Bulgarian lev
0 references
7,095,998.09 Bulgarian lev
0 references
0.76 percent
0 references
29 November 2017
0 references
31 March 2021
0 references
Общата цел на проекта е да се намали количеството битови отпадъци за депониране и да се увеличи дела на рециклираните и оползотворените отпадъци в община Петрич, която съставлява самостоятелен регион за управление на отпадъците. Ще бъдат изградени инсталация за предварително третиране на смесените битови отпадъци преди депониране с капацитет 10 841 т/г. и инсталация за компостиране на зелените отпадъци, генерирани на територията на общината, с капацитет 4150 т/г. и площадкова инфраструктура. Ще бъде закупено оборудване за функциониране на инсталациите и техника за разделно събиране на зелени отпадъци. Двете инсталации ще бъдат разположени в близост до регионалното депо Петрич. Инвестицията по проекта ще допринесе също за подобряване на ресурсната ефективност в община Петрич, тъй като в резултат от направените инвестиции отпадъците ще се превръщат в ресурс - на компостиращата инсталация ще се произвежда качествен компост, а в инсталацията за предварително третиране ще се отделят полезните компоненти от смесените битови отпадъци и ще се предават за рециклиране.В периода на проекта общината ще въведе система за разделно събиране на зелените отпадъци, която ще включва разделно събиране на градински отпадъци от домакинствата в гр. Петрич, с. Първомай, с. Марикостиново, с. Михнево и с. Кърналово и от обществени паркове и градини във всички населени места в община Петрич. По проекта ще бъдат закупени 60 съда с обем по 1,1 m3 за разделно събиране на зелените отпадъци от домакинства и два сметосъбиращи камиона за транспортиране на разделно събраните в общината зелени отпадъци до инсталацията за компостиране. Социално-икономическите ползи от изпълнение на проекта са подобряване на качеството на околната среда за жителите в общината чрез намаляване на вредни емисии от депонирането на отпадъци; разкриване на нови работни места, необходими за обслужване на въведената система за разделно събиране на зелените отпадъци и за експлоатация на двете изградени инсталации и др. (Bulgarian)
0 references
The overall objective of the project is to reduce the amount of municipal waste for landfilling and to increase the share of recycled and recovered waste in the municipality of Petrich, which constitutes a separate waste management region. An installation for pre-treatment of mixed municipal waste before landfilling with a capacity of 10 841 tonnes/year and a composting plant for the green waste generated on the territory of the municipality will be built with a capacity of 4 150 t/year and site infrastructure. Equipment for the operation of the installations and equipment for separate collection of green waste will be purchased. The two installations will be located close to the Petrich regional landfill. The investment under the project will also contribute to improving resource efficiency in the municipality of Petrich, as as a result of the investments the waste will become a resource — the composting plant will produce quality compost, and the pretreatment plant will separate the useful components from the mixed household waste and will be delivered for recycling. During the period of the project, the municipality will introduce a system for separate collection of green waste, which will include separate collection of garden waste from households in the town of Petrich, Parvomay, Marikostinovo, Mikhnevo village and from public parks and gardens in all settlements in Petrich municipality. The project will purchase 60 vessels with a volume of 1.1 m³ for separate collection of green waste from households and two waste collection trucks for transporting separately collected green waste in the municipality to the composting plant. The socio-economic benefits of implementing the project are to improve the quality of the environment for the residents of the municipality by reducing harmful emissions from the landfilling of waste; the creation of new jobs needed for servicing the system put in place for separate collection of green waste and for the operation of the two installed installations, etc. (English)
2 December 2021
0 references
Петрич
0 references