Development of cogeneration energy sources in IOM IRENEUSZ (Q137830): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement) |
(Changed label, description and/or aliases in fr: translated_label) |
||
label / fr | label / fr | ||
Développement de sources d’énergie de cogénération à l’OIM Ireneusz Muż |
Revision as of 22:05, 2 December 2021
Project Q137830 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Development of cogeneration energy sources in IOM IRENEUSZ |
Project Q137830 in Poland |
Statements
487,696.0 zloty
0 references
573,760.0 zloty
0 references
85.0 percent
0 references
1 March 2019
0 references
30 June 2023
0 references
IOM IRENEUSZ MUŻ
0 references
Projekt ma charakter stacjonarny. Realizacja projektu zostanie zlokalizowana w m. Redlica na dz. 93, 72-002 Dobra, Województwo Zachodniopomorskie. Realizacja projektu będzie polegała na budowie wysokosprawnej kogeneracji w budynku która to będzie produkować energię cieplną o mocy ok. 14,7 kW i energię elektryczną o mocy 6 kW na potrzeby własne Wnioskodawcy wraz z bankiem energii o pojemności ok. 20 kWh. Wnioskodawca posiada dokumenty niezbędne do rozpoczęcia realizacji projektu : dokumentację techniczną inwestycji (koncepcja instalacji). Planowana inwestycja nie wymaga pozwolenia na budowę. stałopalna i zastąpiona wysokosprawną koagulacją. ETAPY REALIZACJI PROJEKTU : 1. „Przygotowanie dokumentacji projektu” w tym : opracowanie studium wykonalności. 2. „Budowa instalacji wysokosprawnej kogeneracji”. 3. „Nadzór inwestorski” 4. „Promocja projektu”. (Polish)
0 references
The project is stationary. The implementation of the project will be located in m. editorial on dz. 93, 72-002 Good, West Pomeranian Voivodeship. The implementation of the project will consist of the construction of high-efficiency cogeneration in the building which will produce thermal energy of approx. 14,7 kW and 6 kW electricity for the applicant’s own needs together with an energy bank with a capacity of approx. It’s 20 kWh. The applicant shall have the necessary documents to start the project: technical documentation of the investment (installation concept). The planned investment does not require a construction permit. Fixed and replaced by high-efficiency coagulation. STAGES OF PROJECT IMPLEMENTATION: 1. “Project documentation preparation” including: development of a feasibility study. 2. Construction of high-efficiency cogeneration installations. 3. “Investor Supervision” 4. “Promotion of the project”. (English)
21 October 2020
0 references
Identifiers
RPZP.02.12.00-32-B001/19
0 references