PROJECT FOR EXTENSION OF LINE 2 OF THE SOFIA METRO, SECTION “JAMES BAUCHER” TO “VITOSHA” MS — PHASE 2 (Q3878211): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in en: translated_label) |
(Created claim: summary (P836): This proposal concerns Phase 2 of the Sofia Metro Line 2 Extension Project, section “James Baucher” to the “Vitosha” Council of Ministers with a length of 1.3 km and 1 metro station, included for funding under OP “Transport and Transport Infrastructure” 2014-2020. as, through the possibilities of the so-called “reverse phase”, Phase 1 is financed under OP “Transport” 2007-2013. The project includes the underground section of Line 2 south of “Jam...) |
||||||||||||||
Property / summary | |||||||||||||||
This proposal concerns Phase 2 of the Sofia Metro Line 2 Extension Project, section “James Baucher” to the “Vitosha” Council of Ministers with a length of 1.3 km and 1 metro station, included for funding under OP “Transport and Transport Infrastructure” 2014-2020. as, through the possibilities of the so-called “reverse phase”, Phase 1 is financed under OP “Transport” 2007-2013. The project includes the underground section of Line 2 south of “James Baucher” in the direction of a ring road to the “Vitosha” MS, located below the junction between Cherni Vrah Blvd and Srebarna Street. With the implementation of the section from “James Baucher” to the Council of Ministers “Vitosha” continues the phased implementation of the metro network, set in the GSP and the short-term programme of the CB as the backbone of the transport and communication system of the city. In order to quickly restore the traffic on the extremely busy Cherni Vrah Blvd, Henrik Ibsen Blvd. and Srebarna Str. and the earlier start of the construction, it was necessary to divide the project implementation into two phases:- Phase 1 — includes the activities related to the preparation of project, the selection of contractors, the reconstruction of the engineering networks, the construction of the road and the construction of them. Phase 1 representing 48.5 % of the whole project (according to Table 19 in point 7.3. of Appendix 4) was completed at the end of 2015 — Phase 2 represents 51.5 % of the entire project and includes the complete completion of the project, after the implementation of Phase 1 — the architectural design of the Vitosha Council, the equipment of the section and the metro station with systems for operation by parts: Track and contact rail; Dispatching systems; A link with the CSR; Radio communication system; Electricity supply system; Traffic automation and train speed control systems; Complex audiovisual systems; Low current systems for metro operation and complex testing and commissioning of the section. (English) | |||||||||||||||
Property / summary: This proposal concerns Phase 2 of the Sofia Metro Line 2 Extension Project, section “James Baucher” to the “Vitosha” Council of Ministers with a length of 1.3 km and 1 metro station, included for funding under OP “Transport and Transport Infrastructure” 2014-2020. as, through the possibilities of the so-called “reverse phase”, Phase 1 is financed under OP “Transport” 2007-2013. The project includes the underground section of Line 2 south of “James Baucher” in the direction of a ring road to the “Vitosha” MS, located below the junction between Cherni Vrah Blvd and Srebarna Street. With the implementation of the section from “James Baucher” to the Council of Ministers “Vitosha” continues the phased implementation of the metro network, set in the GSP and the short-term programme of the CB as the backbone of the transport and communication system of the city. In order to quickly restore the traffic on the extremely busy Cherni Vrah Blvd, Henrik Ibsen Blvd. and Srebarna Str. and the earlier start of the construction, it was necessary to divide the project implementation into two phases:- Phase 1 — includes the activities related to the preparation of project, the selection of contractors, the reconstruction of the engineering networks, the construction of the road and the construction of them. Phase 1 representing 48.5 % of the whole project (according to Table 19 in point 7.3. of Appendix 4) was completed at the end of 2015 — Phase 2 represents 51.5 % of the entire project and includes the complete completion of the project, after the implementation of Phase 1 — the architectural design of the Vitosha Council, the equipment of the section and the metro station with systems for operation by parts: Track and contact rail; Dispatching systems; A link with the CSR; Radio communication system; Electricity supply system; Traffic automation and train speed control systems; Complex audiovisual systems; Low current systems for metro operation and complex testing and commissioning of the section. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: This proposal concerns Phase 2 of the Sofia Metro Line 2 Extension Project, section “James Baucher” to the “Vitosha” Council of Ministers with a length of 1.3 km and 1 metro station, included for funding under OP “Transport and Transport Infrastructure” 2014-2020. as, through the possibilities of the so-called “reverse phase”, Phase 1 is financed under OP “Transport” 2007-2013. The project includes the underground section of Line 2 south of “James Baucher” in the direction of a ring road to the “Vitosha” MS, located below the junction between Cherni Vrah Blvd and Srebarna Street. With the implementation of the section from “James Baucher” to the Council of Ministers “Vitosha” continues the phased implementation of the metro network, set in the GSP and the short-term programme of the CB as the backbone of the transport and communication system of the city. In order to quickly restore the traffic on the extremely busy Cherni Vrah Blvd, Henrik Ibsen Blvd. and Srebarna Str. and the earlier start of the construction, it was necessary to divide the project implementation into two phases:- Phase 1 — includes the activities related to the preparation of project, the selection of contractors, the reconstruction of the engineering networks, the construction of the road and the construction of them. Phase 1 representing 48.5 % of the whole project (according to Table 19 in point 7.3. of Appendix 4) was completed at the end of 2015 — Phase 2 represents 51.5 % of the entire project and includes the complete completion of the project, after the implementation of Phase 1 — the architectural design of the Vitosha Council, the equipment of the section and the metro station with systems for operation by parts: Track and contact rail; Dispatching systems; A link with the CSR; Radio communication system; Electricity supply system; Traffic automation and train speed control systems; Complex audiovisual systems; Low current systems for metro operation and complex testing and commissioning of the section. (English) / qualifier | |||||||||||||||
point in time: 2 December 2021
|
Revision as of 21:47, 2 December 2021
Project Q3878211 in Bulgaria
Language | Label | Description | Also known as |
---|---|---|---|
English | PROJECT FOR EXTENSION OF LINE 2 OF THE SOFIA METRO, SECTION “JAMES BAUCHER” TO “VITOSHA” MS — PHASE 2 |
Project Q3878211 in Bulgaria |
Statements
18,614,657.13 Bulgarian lev
0 references
21,899,596.62 Bulgarian lev
0 references
0.85 percent
0 references
17 June 2016
0 references
13 September 2019
0 references
0 references
Настоящото предложение се отнася за Фаза 2 на Проекта за разширение на Линия 2 на метрото в София, участък МС "Джеймс Баучер" до МС "Витоша" с дължина 1,3 км и 1 метростанция , включен за финансиране по ОП ”Транспорт и транспортна инфраструктура” 2014-2020г. , като, чрез възможностите на т.н. ”обратно фазиране”, Фаза 1 е финансирана по ОП ”Транспорт” 2007-2013 г. Проекта включва подземния участък от Линия 2 на юг от МС "Джеймс Баучер" в посока околовръстен път до МС "Витоша", разположена под кръстовището между бул. Черни връх и ул. "Сребърна". С изпълнението на участъка от МС „Джеймс Баучер” до МС „ Витоша” продължава поетапната реализация на метромрежата, заложена в ОУП и Краткосрочната програма на СО като гръбнака на транспортно-комуникационната система на града.С цел по-бързото възстановяване на движението по изключително натоварените бул. Черни връх, бул. Хенрик Ибсен и ул. Сребърна и по-ранното стартиране на строителството, беше необходимо изпълнението на проекта да бъде разделено на две фази :- Фаза 1 – включва дейностите по подготовката на проектна, избора на изпълнители, реконструкцията на инженерните мрежи, изграждането на конструкциите на тунелите и метростанцията и пътните работи над тях. Фаза 1 представляваща 48,5% от целият проект (съгласно таблица 19 в т. 7.3. на Допълнение 4) е завършена в края на 2015 г.- Фаза 2 представлява 51,5% от целият проект и включва цялостното довършване на проекта, след изпълнението на Фаза 1- архитектурното оформление на МС „Витоша”, оборудването на участъка и метростанцията със системи за експлоатация по части: Релсов път и контактна релса; Диспечерски системи за управление; Връзка с ЦДП; Система за радиовръзка; Система за електроснабдяване; Системи за автоматика на движението и регулиране на скоростта на влаковете; Комплексни аудиовизуални системи; Слаботокови системи за функциониране на метрото и комплексни изпитания и въвеждане на участъка в експлоатация. (Bulgarian)
0 references
This proposal concerns Phase 2 of the Sofia Metro Line 2 Extension Project, section “James Baucher” to the “Vitosha” Council of Ministers with a length of 1.3 km and 1 metro station, included for funding under OP “Transport and Transport Infrastructure” 2014-2020. as, through the possibilities of the so-called “reverse phase”, Phase 1 is financed under OP “Transport” 2007-2013. The project includes the underground section of Line 2 south of “James Baucher” in the direction of a ring road to the “Vitosha” MS, located below the junction between Cherni Vrah Blvd and Srebarna Street. With the implementation of the section from “James Baucher” to the Council of Ministers “Vitosha” continues the phased implementation of the metro network, set in the GSP and the short-term programme of the CB as the backbone of the transport and communication system of the city. In order to quickly restore the traffic on the extremely busy Cherni Vrah Blvd, Henrik Ibsen Blvd. and Srebarna Str. and the earlier start of the construction, it was necessary to divide the project implementation into two phases:- Phase 1 — includes the activities related to the preparation of project, the selection of contractors, the reconstruction of the engineering networks, the construction of the road and the construction of them. Phase 1 representing 48.5 % of the whole project (according to Table 19 in point 7.3. of Appendix 4) was completed at the end of 2015 — Phase 2 represents 51.5 % of the entire project and includes the complete completion of the project, after the implementation of Phase 1 — the architectural design of the Vitosha Council, the equipment of the section and the metro station with systems for operation by parts: Track and contact rail; Dispatching systems; A link with the CSR; Radio communication system; Electricity supply system; Traffic automation and train speed control systems; Complex audiovisual systems; Low current systems for metro operation and complex testing and commissioning of the section. (English)
2 December 2021
0 references
София
0 references
Identifiers
BG16M1OP001-3.001-0002
0 references