Comprehensive energy modernisation of the SARL office building in Stargard Street. First Brigade 35. (Q137638): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement) |
(Changed label, description and/or aliases in fr: translated_label) |
||
label / fr | label / fr | ||
Modernisation énergétique complète du bâtiment de bureaux SARL à Stargard à ul. Première brigade 35. |
Revision as of 21:30, 2 December 2021
Project Q137638 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Comprehensive energy modernisation of the SARL office building in Stargard Street. First Brigade 35. |
Project Q137638 in Poland |
Statements
643,103.0 zloty
0 references
1,398,050.0 zloty
0 references
46.0 percent
0 references
10 April 2015
0 references
30 March 2018
0 references
STARGARDZKA AGENCJA ROZWOJU LOKALNEGO SPÓŁKA Z O.O.
0 references
Realizacja projektu pn. ”Kompleksowa modernizacja energetyczna budynku biurowego SARL w Stargardzie przy ul. Pierwszej Brygady 35” ma charakter stacjonarny i obejmować będzie następujące prace: 1. Kompleksową modernizację instalacji c.o. obejmującą wymianę grzejników, przewodów, hermetyzację, pełną regulację, montaż zaworów termostatycznych P-1K i zaworów regulacji podpionowej. Kompleksową modernizację węzła cieplnego wyposażonego w pełna automatykę pogodowa i regulację automatyczną wraz z możliwością bieżącego monitorowania zużycia energii i korekty parametrów zasilania. Prowadzenie eksploatacji węzła cieplnego umożliwiające: załączenie i wyłączenie z systemu sezonu grzewczego w budynku, prowadzenie zmiany nastaw parametrów poprzez zmianę krzywej grzania, zdalne wykonywanie uzupełnienia zładu instalacji odbiorczej, prowadzenie odczytów ciepła na obiekcie oraz indywidualnych liczników ciepła i wody. 2. Wymianę istniejących starych okien na nowe o WSP.U=0,9 W/m2K wyposażonych w nawiewniki higrosterowane oraz wymianę starych drzwi zewnętrznych na nowe o WSP. U=1,3 W/m2K. 3. Ocieplenie ścian zewnętrznych materiałem izolacyjnym o WSP. ^ =0,038 mK/W o grubości 16 cm (współczynnik U=0,197W/m2*K dla ścian szczytowych i 0,184 W/m2*Kdla ścian podłużnych). 4. Ocieplenie stropodachów materiałem izolacyjnym o WSP. ^ =0,042 mK/W o grubości 25 cm ( współczynnik U=0,140W/m2K). 5. Ocieplenie uskoku nad parterem materiałem izolacyjnym o WSP. ^ =0,038 mK/W o grubości 22 cm (współczynnik U=0,149W/m2K). Projekt będzie realizowany od 10.04.2015 do 29.12. 2017 roku. Wnioskodawca po zatwierdzeniu projektu do dofinansowania, powoła Zespół do spraw wdrożenia projektu, który będzie odpowiedzialny za nadzór i ogólną koordynację projektu. Celem wyeliminowania ryzyka, błędów czy niedopatrzeń poza własnymi zasobami zamierza zaangażować zewnętrzne podmioty w celu nadzoru prac budowlanych i rozliczenia projektu. (Polish)
0 references
Implementation of the project Mon. “Comprehensive energy modernisation of the SARL office building in Stargard Street. The first 35" Brigade is stationary and will include the following works: 1. Comprehensive modernisation of the central heating system, including the replacement of radiators, wires, hermetisation, full adjustment, installation of P-1K thermostatic valves and upholstery valves. Comprehensive modernisation of the heat node equipped with full weather automation and automatic regulation, with the possibility of current monitoring of energy consumption and correction of power parameters. Operation of a heat node enabling: connecting and disabling from the heating season system in the building, conducting a change of parameters settings by changing the heating curve, remotely completing the balance of the reception system, conducting heat readings on the object and individual heat and water meters. 2. Replacement of existing old windows with new ones with WSP.U=0.9 W/m2K equipped with hygrostered vents and replacement of old external doors with new ones with WSP. U=1.3 W/m2K. 3. Insulation of the outer walls with insulation material with WSP. ^ = 0,038 mK/W with a thickness of 16 cm (coefficient U=0.197W/m²*K for peak walls and 0,184 W/m²**For longitudinal walls). 4. Warming of stropods with insulation material with WSP. ^ = 0,042 mK/W with a thickness of 25 cm (coefficient U=0.140W/m2K). 5. Warming of faults over the ground floor insulation material with WSP. ^ = 0,038 mK/W with a thickness of 22 cm (coefficient U=0.149W/m2K). The project will be implemented from 10.04.2015 to 29.12. It’s 2017. After approval of the project for co-financing, the applicant shall set up a project implementation team, which will be responsible for the supervision and overall coordination of the project. In order to eliminate risks, errors or oversight beyond its own resources, it intends to involve external actors to supervise construction work and to settle the project. (English)
21 October 2020
0 references
Identifiers
RPZP.02.06.00-32-A016/16
0 references