Development and increased use of solar energy in urban organizational units in Szczecin – stage II (Q137690): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement) |
(Changed label, description and/or aliases in fr: translated_label) |
||
label / fr | label / fr | ||
Développement et augmentation de l’utilisation de l’énergie solaire dans les unités administratives municipales de Szczecin — phase II |
Revision as of 21:27, 2 December 2021
Project Q137690 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Development and increased use of solar energy in urban organizational units in Szczecin – stage II |
Project Q137690 in Poland |
Statements
5,681,560.59 zloty
0 references
6,684,188.94 zloty
0 references
85.0 percent
0 references
1 June 2016
0 references
31 August 2019
0 references
GMINA MIASTO SZCZECIN
0 references
Przedmiotem projektu jest montaż instalacji fotowoltaicznej na dachach 23 budynków miejskich jednostek organizacyjnych w Szczecinie. Budynki są obiektami użyteczności publicznej: obiekty, w których funkcjonują jednostki oświatowe – (11 obiektów); obiekty, w których funkcjonują jednostki pomocy społecznej - (10 obiektów) i obiekty w których funkcjonują przedszkola – (2 obiekty). Projekt realizuje najbardziej efektywny sposób użytkowania zakładający wariant z włączeniem do sieci i wykorzystaniem maksymalnie dostępnej efektywnej powierzchni w celu uzyskania produkcji maksymalnej ilości energii elektrycznej nie przekraczającej zapotrzebowania na nią danego obiektu. Na dachach zostanie zamontowanych 2446 paneli o mocy 280 kWp. Łączna moc jaka zostanie zainstalowana na dachach budynków wyniesie 684,92kWp. Produkcja energii elektrycznej z nowo wybudowanych/ nowych mocy wytwórczych instalacji wykorzystujących OZE wyniesie 665,46 MWhe/rok. Planowane instalacje PV pokryją średnio ok. 58% zapotrzebowania na energię elektryczną budynków. Efekty jakie zostaną osiągnięte w wyniku realizacji projektu to redukcja emisji CO2 o 548,04 MgCO2/rok. Projektowana instalacja fotowoltaiczna składać się będą z następujących elementów wyposażenia: • modułów fotowoltaicznych, • inwerterów, • systemów montażowych. Moduły fotowoltaiczne: Instalacja składać się będzie z modułów fotowoltaicznych polikrystalicznych o mocy szczytowej 280 Wp. Parametry pojedynczego modułu w warunkach STC (standardowe warunki testu: napromieniowanie 1000 W/m2, temperatura ogniw 25 °C i współczynnik masy powietrza AM 1,5). Inwertery: Urządzeniami odpowiedzialnymi za współpracę z generatorami będą beztransformatorowe falowniki trójfazowe o maksymalnym napięciu wejściowym 1000 V i minimalnym napięciu wejściowym 150 V. System montażowy: Jako konstrukcja wsporczą instalacji PV wykorzystany zostanie aluminiowy system montażowy dobrany do każdego dachu indywidualnie. (Polish)
0 references
The subject of the project is the installation of a photovoltaic installation on the roofs of 23 municipal organizational units in Szczecin. Buildings are public buildings: facilities in which educational units operate – (11 objects); facilities in which social assistance units operate – (10 facilities) and facilities in which kindergartens operate – (2 facilities). The project implements the most efficient way of using the option with grid inclusion and the use of the maximum efficient area available in order to produce a maximum amount of electricity not exceeding the needs of the facility. 2446 panels of 280 kWp will be installed on the roofs. The total power to be installed on the roofs of buildings will be 684.92kWp. The production of electricity from newly built/new RES installations will be 665.46 MWhe/year. The planned PV installations will cover an average of approx. 58 % of the building’s electricity demand. The effects to be achieved as a result of the project are a reduction of CO2 emissions by 548.04 MgCO2/year. The designed photovoltaic installation will consist of the following elements of equipment: • photovoltaic modules, • inverters, • assembly systems. Photovoltaic modules: The installation will consist of polycrystalline photovoltaic modules with a peak power of 280 Wp. Single module parameters under STC conditions (standard test conditions: irradiation of 1000 W/m², cell temperature 25 °C and air mass coefficient AM 1,5). Inverters: Devices responsible for co-operating with generators will be transformless three-phase inverters with a maximum input voltage of 1000 V and a minimum input voltage of 150 V. As the support structure of the PV installation, an aluminum mounting system selected for each roof will be used individually. (English)
21 October 2020
0 references
Identifiers
RPZP.02.10.00-32-A046/16
0 references