Construction of the interchange centre in Załom with bus loop (Q137545): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement) |
(Changed label, description and/or aliases in fr: translated_label) |
||
label / fr | label / fr | ||
Construction d’un centre de transfert à Załom avec une boucle de bus |
Revision as of 21:09, 2 December 2021
Project Q137545 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Construction of the interchange centre in Załom with bus loop |
Project Q137545 in Poland |
Statements
2,700,000.0 zloty
0 references
3,714,134.76 zloty
0 references
72.7 percent
0 references
2 July 2018
0 references
28 June 2019
0 references
GMINA GOLENIÓW
0 references
Inwestycja zakłada budowę Centrum Przesiadkowego (CP) przy ul. Leśnej i Lubczyńskiej w Załomiu z zagospodarowaniem terenu i infrastrukturą techn. Zakres rzeczowy obejmuje m.in. budowę obiektu obsługi podróżnych (z poczekalnią, pokojem kierowców i toaletami) wraz z zadaszonym przejściem na perony i wiatami przystankowymi. W ramach prac w branży drogowej w CP powstanie plac manewrowy dla autobusów, P&R na 60 poj., (w tym 3 miejsca dla os. niepełnosprawnych), B&R na 18 rowerów oraz ścieżka pieszo-rowerowa i dojścia piesze do budynku obsługi. Poza tym powstaną przyłącza: wod-kan. i instalacje zewn.: wodna, kanalizacji san., elektryczna, teletechniczna i telekomunikacyjna oraz kanalizacja deszcz. Teren będzie oświetlony i monitorowany, a jako koszt NKW powstanie plac zabaw. (Polish)
0 references
The investment assumes the construction of the Interchange Centre (CP) at ul. Forest and Lubczyńska in Załomiu with land development and techn infrastructure. The material scope includes, among others, the construction of a passenger service facility (with a waiting room, driver’s room and toilets) with a covered passage to platforms and bus stops. As part of the work in the road industry in CP there will be a manoeuvring area for buses, P&R on 60, (including 3 seats for people with disabilities), B &R for 18 bicycles, and a foot-bike path and access to the service building. In addition, there will be connections: water-channel and outdoor installations: water, sanitary, electrical, telecommunication, and rain drainage. The area will be illuminated and monitored, and as a cost of NKW a playground will be created. (English)
21 October 2020
0 references
Identifiers
RPZP.02.02.00-32-0002/17
0 references