Implementation of an energy management system in Dried Fruit Plant (Q3148127): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Changed label, description and/or aliases in fr: translated_label) |
||
label / fr | label / fr | ||
Mise en œuvre d’un système de gestion de l’énergie dans les plantes fruitières séchées |
Revision as of 16:02, 2 December 2021
Project Q3148127 in Spain
Language | Label | Description | Also known as |
---|---|---|---|
English | Implementation of an energy management system in Dried Fruit Plant |
Project Q3148127 in Spain |
Statements
17,307.78 Euro
0 references
34,615.56 Euro
0 references
50.0 percent
0 references
8 August 2017
0 references
2 March 2020
0 references
GONZALEZ ENCINAS PEDRO
0 references
46007
0 references
Previamente al desarrollo del siguiente proyecto, se realizo una auditoria energética integral de la Planta de Frutas Desecadas en la que se detectó la inexistencia de un SGE implantado. Mediante la implantación de un Sistema de Gestión Energética se pretende dotar a la planta de las herramientas necesarias para el seguimiento y control del consumo de energía eléctrica o térmica._x000D_ Siendo a su vez una herramienta para el análisis de la información, generación de propuestas de ahorro y ayuda a la planificación en su implantación. (Spanish)
0 references
Prior to the development of the next project, a comprehensive energy audit of the dried fruit plant was carried out in which the absence of an implanted GES was detected. Through the implementation of an Energy Management System it is intended to provide the plant with the necessary tools for monitoring and controlling the consumption of electrical or thermal energy._x000D_ It is in turn a tool for the analysis of information, generation of savings proposals and aid to planning in its implementation. (English)
12 October 2021
0 references
Albal
0 references
Identifiers
FN17IND00613
0 references