Reconstruction of station complexes Stara Zagora and Nova Zagora (Q3856401): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in en: translated_label) |
(Created claim: summary (P836): As a result of the long-standing operation, the reception buildings of the railway stations in Bulgaria are in very poor condition. This requires their modernisation, refurbishment and repair, including their installation systems. The appearance of the reception facilities at the stations is of great importance for the image of rail transport. They are in many cases the face of the railroad. It is no accident in Europe that large railway station...) |
||||||||||||||
Property / summary | |||||||||||||||
As a result of the long-standing operation, the reception buildings of the railway stations in Bulgaria are in very poor condition. This requires their modernisation, refurbishment and repair, including their installation systems. The appearance of the reception facilities at the stations is of great importance for the image of rail transport. They are in many cases the face of the railroad. It is no accident in Europe that large railway stations have been turned into shopping centers with shops, restaurants and car parks. Therefore, for the renovation and reconstruction of the old and for the construction of new stations it is necessary to develop different concepts tailored to the location of each of them. Of particular importance is the organisation of the service in the stations in order to create the necessary amenities and comfort for the passengers. The project provides for a complete reconstruction of the reception facilities (for Nova Zagora a new reception building), in accordance with the high requirements of the European standards in the field, which will guarantee the safety of passengers and the quality of service provision, a comfortable working environment for the employees, as well as the alignment of the surrounding space in accordance with the requirements for accessibility of disabled and disadvantaged people. Measures will be implemented to increase the energy efficiency of public spaces, introduction of intelligent, modern systems for management of heating, air conditioning, lighting, information, etc. Renovation and structural reinforcement of individual elements of the supporting structures, replacement of roof structures, partial functional refurbishment of the premises, replacement of electrical installations, water supply and sewerage systems, parking and public works of the surrounding area, etc. The project and its management is planned to be implemented in from 01.02.2016 to 19.04.2022-75 months.Detailed information is set out in point B.3.1 of the FC and Annex 1 to the FC. (English) | |||||||||||||||
Property / summary: As a result of the long-standing operation, the reception buildings of the railway stations in Bulgaria are in very poor condition. This requires their modernisation, refurbishment and repair, including their installation systems. The appearance of the reception facilities at the stations is of great importance for the image of rail transport. They are in many cases the face of the railroad. It is no accident in Europe that large railway stations have been turned into shopping centers with shops, restaurants and car parks. Therefore, for the renovation and reconstruction of the old and for the construction of new stations it is necessary to develop different concepts tailored to the location of each of them. Of particular importance is the organisation of the service in the stations in order to create the necessary amenities and comfort for the passengers. The project provides for a complete reconstruction of the reception facilities (for Nova Zagora a new reception building), in accordance with the high requirements of the European standards in the field, which will guarantee the safety of passengers and the quality of service provision, a comfortable working environment for the employees, as well as the alignment of the surrounding space in accordance with the requirements for accessibility of disabled and disadvantaged people. Measures will be implemented to increase the energy efficiency of public spaces, introduction of intelligent, modern systems for management of heating, air conditioning, lighting, information, etc. Renovation and structural reinforcement of individual elements of the supporting structures, replacement of roof structures, partial functional refurbishment of the premises, replacement of electrical installations, water supply and sewerage systems, parking and public works of the surrounding area, etc. The project and its management is planned to be implemented in from 01.02.2016 to 19.04.2022-75 months.Detailed information is set out in point B.3.1 of the FC and Annex 1 to the FC. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: As a result of the long-standing operation, the reception buildings of the railway stations in Bulgaria are in very poor condition. This requires their modernisation, refurbishment and repair, including their installation systems. The appearance of the reception facilities at the stations is of great importance for the image of rail transport. They are in many cases the face of the railroad. It is no accident in Europe that large railway stations have been turned into shopping centers with shops, restaurants and car parks. Therefore, for the renovation and reconstruction of the old and for the construction of new stations it is necessary to develop different concepts tailored to the location of each of them. Of particular importance is the organisation of the service in the stations in order to create the necessary amenities and comfort for the passengers. The project provides for a complete reconstruction of the reception facilities (for Nova Zagora a new reception building), in accordance with the high requirements of the European standards in the field, which will guarantee the safety of passengers and the quality of service provision, a comfortable working environment for the employees, as well as the alignment of the surrounding space in accordance with the requirements for accessibility of disabled and disadvantaged people. Measures will be implemented to increase the energy efficiency of public spaces, introduction of intelligent, modern systems for management of heating, air conditioning, lighting, information, etc. Renovation and structural reinforcement of individual elements of the supporting structures, replacement of roof structures, partial functional refurbishment of the premises, replacement of electrical installations, water supply and sewerage systems, parking and public works of the surrounding area, etc. The project and its management is planned to be implemented in from 01.02.2016 to 19.04.2022-75 months.Detailed information is set out in point B.3.1 of the FC and Annex 1 to the FC. (English) / qualifier | |||||||||||||||
point in time: 2 December 2021
|
Revision as of 15:50, 2 December 2021
Project Q3856401 in Bulgaria
Language | Label | Description | Also known as |
---|---|---|---|
English | Reconstruction of station complexes Stara Zagora and Nova Zagora |
Project Q3856401 in Bulgaria |
Statements
14,041,437.86 Bulgarian lev
0 references
16,519,338.66 Bulgarian lev
0 references
0.85 percent
0 references
1 February 2016
0 references
19 October 2022
0 references
Q3856400 (Deleted Item)
0 references
В резултат от дългогодишната експлоатация приемните сгради на жп гарите в България са в много лошо състояние. Това налага тяхната модернизация, преустройство и ремонт, включително и на инсталационните системи в тях. Външният вид на приемните здания на гарите е от голямо значение за имиджа на железопътния транспорт. Те в много случаи са лицето на железницата. Не случайно в Европа, големите железопътни гари са превърнати в търговски центрове с магазини, ресторанти и паркинги. Ето защо, за обновяването и реконструкцията на старите и за строителството на нови гари е необходимо разработването на различни концепции, съобразени с местоположението на всяка една от тях. От особена важност е организацията на обслужването в гарите, за да бъдат създадени необходимите удобства и комфорт за пътницитe.Проектът предвижда цялостна реконструкция на приемните здания (за Нова Загора ново приемно здание), в съответствие с високите изисквания на Европейските стандарти в областта, което да гарантира сигурността на пътниците и качеството на предлагане на услугите, комфортна работна среда за служителите, както и привеждане на околното пространство съгласно изискванията за достъпност на хора с увреждания и хора в неравностойно положение. Ще се изпълнят мерки за повишаване енергийната ефективност на обществените пространства, въвеждане на интелигентни, модерни системи за управление на системи за отопление, климатизация, осветление, информация и др. Ще се извърши саниране и конструктивно усилване на отделни елементи от носещите конструкции, подмяна на покривните конструкции, частично функционално преустройство на помещенията, подмяна на електроинсталациите, водоснабдителните и канализационните системи, ще се извърши паркоустройство и благоустройство на околното пространство и т.н.Проектът и управлението му е предвидено да се осъществи в периода 01.02.2016 г. до 19.04.2022 г. - 75 месеца.Подробна информация е посочена в т. Б.3.1 на ФК и Приложение № 1 към ФК. (Bulgarian)
0 references
As a result of the long-standing operation, the reception buildings of the railway stations in Bulgaria are in very poor condition. This requires their modernisation, refurbishment and repair, including their installation systems. The appearance of the reception facilities at the stations is of great importance for the image of rail transport. They are in many cases the face of the railroad. It is no accident in Europe that large railway stations have been turned into shopping centers with shops, restaurants and car parks. Therefore, for the renovation and reconstruction of the old and for the construction of new stations it is necessary to develop different concepts tailored to the location of each of them. Of particular importance is the organisation of the service in the stations in order to create the necessary amenities and comfort for the passengers. The project provides for a complete reconstruction of the reception facilities (for Nova Zagora a new reception building), in accordance with the high requirements of the European standards in the field, which will guarantee the safety of passengers and the quality of service provision, a comfortable working environment for the employees, as well as the alignment of the surrounding space in accordance with the requirements for accessibility of disabled and disadvantaged people. Measures will be implemented to increase the energy efficiency of public spaces, introduction of intelligent, modern systems for management of heating, air conditioning, lighting, information, etc. Renovation and structural reinforcement of individual elements of the supporting structures, replacement of roof structures, partial functional refurbishment of the premises, replacement of electrical installations, water supply and sewerage systems, parking and public works of the surrounding area, etc. The project and its management is planned to be implemented in from 01.02.2016 to 19.04.2022-75 months.Detailed information is set out in point B.3.1 of the FC and Annex 1 to the FC. (English)
2 December 2021
0 references
Нова ЗагораСтара Загора
0 references
Identifiers
BG16M1OP001-3.001-0009
0 references