RETROFITTING WITH SPECIALISED RIPOK EQUIPMENT AT CHRISTMAS (Q132473): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
(‎Changed label, description and/or aliases in fr: translated_label)
label / frlabel / fr
 
MISE À NIVEAU AVEC DES ÉQUIPEMENTS SPÉCIALISÉS RIPOK À NOËL

Revision as of 12:29, 2 December 2021

Project Q132473 in Poland
Language Label Description Also known as
English
RETROFITTING WITH SPECIALISED RIPOK EQUIPMENT AT CHRISTMAS
Project Q132473 in Poland

    Statements

    0 references
    616,114.07 zloty
    0 references
    147,867.38 Euro
    13 January 2020
    0 references
    724,840.08 zloty
    0 references
    173,961.62 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    5 February 2018
    0 references
    31 August 2019
    0 references
    DBAJ MARTA PRYCHODKO
    0 references
    0 references

    53°33'55.4"N, 21°13'4.8"E
    0 references
    Planowane przedsięw. dot.odzysku i recyklingu odpad. biodegradowalnych w region.instalacji do przetw.odpadów komunalnych w Świętajnie w Reg.Centr.wg podziału w WPGO. Inwestycja zlokal.jest na działce ewid.oznacz. o nr 77/1, obr.0014 Świętajno. Na jej terenie znajdują się już obiekty związane z działal.Wnioskodawcy. Planowane przedsięw.polegać będzie na zakupie specjalist.sprzętu do prowadzenia efektywnej gospodarki odpadami w zakresie odzysku i recyklingu odpad. biodegradowalnych. Przetwarz.odpad. prowadz.będzie w instalacji do kompost.komunal. osadów ściekow. oraz bioodpadów, w której wytwarzany będzie produkt w postaci granulatu o właściwościach nawozowych, prowadzonej w technologii VAL’ID, wyposażona w zamknięty system odprowadz.odcieków. Projekt zakł.wyłącznie zakup specjalist.urządzeń niezbęd. do prowadz.działal. podstaw. Ma więc charak. nieinfrastrukturalny. W ramach przedsięw.przewiduje się: zakup środk.trw.–maszyn i urządzeń do prowadz. i optymaliz.procesów odzysku i recyklingu odpad.bio, w tym kontenerów, rozrzutnika, przyczepy, zamiatarki oraz wozu asenizacyjnego. Będzie możliwe: efektywniejsze przetwarz.bioodpadów, w tym lepsze rozdrabnianie i mieszanie W efekcie nastąpi poprawa jakości kompostu i zwiększenie możliwości przetwarz.różnych rodzajów bioodpadów w ramach instalacji. Do przetwarz.będą wykorzyst. bioodpady w ilości do 3000Mg/rok. Projekt wpisuje się zatem w cel temat. 6 Zach.i ochr. środow.przyrodn. oraz wspier. efektyw. gospod.zasobami, Prior inwest. 6a – Inwest.w sektor gosp.odpad. celem wypełn. zobowiązań określ.w dorobku praw.Unii w zakresie środ. oraz zaspok. wykraczaj.poza te zobowiąz.potrzeb inwest., określ.przez państ.członk. SzOOP RPO WiM Dz.5.1 Gosp.odpad. Wskaźniki: rezult.: Moc przer.zakł. zagospod.odpadów [Mg/rok]–3000Mg/rok; prod: Licz. wspartych zakł.zagospod. odpadów [szt.]–1szt. (Polish)
    0 references
    Planned for recovery and recycling of waste biodegradable in the region. municipal waste processing installations in St.Centr Reg. by division in WPGO. The investment from the local.is on the plot of the register of the number no. 77/1, r.0014 Swiejno. On its premises there are already facilities related to activities.Applicants. The planned project will depend on the purchase of specialists. equipment for efficient waste management in the field of recovery and recycling of waste. biodegradable. The waste will be in the system for compost. communal sludge and bio-waste, in which the product will be produced in the form of granules with fertilising properties, carried out in VAL’ID technology, equipped with a closed drainage system. The project was made.Only the purchase of specialists.equipments necessary to lead.works. basics. So it has a charak. non-infrastructure. Within the framework of the undertaking, it is foreseen: purchase of middle.tw.- machines and equipment for carrying out. and optimising processes for recovery and recycling of waste.bio, including containers, spreader, trailer, sweeper and tanker. It will be possible: more efficient bio-waste processing, including better shredding and mixing The result will be improved compost quality and increased processing capacity of various types of bio-waste within the installation. Bio-waste up to 3000Mg/year will be used for processing. The project therefore fits into the objective of the subject. 6 Zaspod.and ochr. on Wednesday.Nature and support for the effectiveness of gospod. resources, Priorinvest. 6a – Investing in the in-house sector, in order to cover full commitments in the acquis of the Union, in the field of Wednesday and beyond the obligation to invest, as defined by your Member. SzOOP RPO WiM OJ 5.1 Gosp.waste. Indicators: the result.: Wattage of waste [Mg/year]–3000Mg/year; prod: Number of supported wastes [pcs]-1pcs. (English)
    21 October 2020
    0 references

    Identifiers

    RPWM.05.01.00-28-0004/18
    0 references