Thermal modernisation of the building at ul. Hubalki 2 in Bartoszyce (Q132331): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
(‎Changed label, description and/or aliases in fr: translated_label)
label / frlabel / fr
 
Thermomodernisation du bâtiment à ul. Hubalczyk 2 à Bartoszyce

Revision as of 12:21, 2 December 2021

Project Q132331 in Poland
Language Label Description Also known as
English
Thermal modernisation of the building at ul. Hubalki 2 in Bartoszyce
Project Q132331 in Poland

    Statements

    0 references
    412,563.96 zloty
    0 references
    99,015.35 Euro
    13 January 2020
    0 references
    497,124.91 zloty
    0 references
    119,309.98 Euro
    13 January 2020
    0 references
    82.99 percent
    0 references
    17 August 2015
    0 references
    30 November 2018
    0 references
    GMINA MIEJSKA BARTOSZYCE
    0 references
    0 references

    54°15'20.9"N, 20°48'24.5"E
    0 references
    Przedmiotem projektu jest termomodernizacja zabytkowego budynku administracyjnego przy ul. Hubalczyków 2 w Bartoszycach. W ramach przedsięwzięcia termomodernizacyjnego zaplanowano do wykonania następujące prace stanowiące koszt kwalifikowany projektu: 1. Modernizacja przegród: - strop zewnętrzny (strop pod poddaszem) - ściana na gruncie - ściany zewnętrze parteru, I piętra. - ściany zewnętrzne: wnęki okienne - ściana zewnętrzna piwnic powyżej poziomu parteru - podłoga na gruncie - ściana zewnętrzna znajdująca się przy wejściu głównym do budynku - wymiana na okna drewniane skrzynkowe wyposażone w nawiewniki automatyczne, nawiązujące do okien historycznych - wymiana drzwi wejściowych na nawiązujące do historycznych 2. Wymiana całej instalacji c.o., wymiana grzejników na grzejniki płytowe wyposażone w zawory termostatyczne. 3. Wymiana opraw oświetleniowych na oprawy energooszczędne typu LED wraz z instalacją elektryczną. Zakres projektu obejmuje także wykonanie towarzyszących prac stanowiących koszty niekwalifikowane: 1. Izolacja ścian fundamentowych 2. Remont dachu 3. Wentylacja 4. Remont konserwacji elewacji 5. Roboty wykończeniowe wewnętrzne 6. Instalacja odgromowa 7. Instalacja uziemień wyrównawczych Projekt będzie wdrażany przez Urząd Miasta Bartoszyce w zakresie kompetencji Wydziału Techniczno-Inwestycyjnego. Do najważniejszych etapów realizacji projektu należy zaliczyć: - wyłonienie wykonawcy w procedurze Prawa zamówień publicznych do ww. zadań kwalifikowanych i niekwalifikowanych – założono podpisanie umowy z wykonawcą w IV kw. 2017 r. - właściwą realizację rzeczową i finansową do ww. zadań kwalifikowanych i niekwalifikowanych w terminie od IV kw. 2017 do IV kw. 2018 Projekt wpisuje się w założenia określone SzOOP RPO WiM realizując cel Poddziałania 4.3.1 określony jako Zwiększona efektywność energetyczna budynków użyteczności publicznej. Zgodność z typem projektu określono w pkt. 3.7 wniosku. (Polish)
    0 references
    The subject of the project is the thermal modernisation of the historic administrative building at ul. Hubalians 2 in Bartoszyce. Within the framework of the thermomodernisation project, the following works are planned to be carried out, which constitute the eligible cost of the project: 1. Modernisation of bulkheads: — the outer ceiling (the ceiling under the attic) – the wall on the ground – the outer walls of the ground floor, the first floor. — outer walls: window recesses – the outer wall of the cellars above the ground level – floor on the ground – external wall located at the main entrance to the building – replacement for wooden box windows equipped with automatic vents, referring to historical windows – replacement of entrance doors for historical 2. Replacing the entire central heating system, replacing the radiators with plate radiators equipped with thermostatic valves. 3. Replacement of luminaires for energy-saving LED luminaires with electrical installation. The scope of the project shall also include the execution of accompanying works constituting ineligible costs: 1. Insulation of the foundation walls 2. Roof renovation 3. Ventilation’s 4. Renovation of facade maintenance 5. Interior finishing robots 6. Lightning installation 7. Installation of compensatory earthings The project will be implemented by the City of Bartoszyce in the field of competence of the Technical and Investment Faculty. The most important stages of project implementation include: — the selection of an economic operator in the procedure of the Public Procurement Law for the above-mentioned qualified and ineligible tasks – the signing of the contract with the contractor in the fourth quarter was assumed. 2017 – proper physical and financial implementation for the above-mentioned qualified and ineligible tasks from the fourth quarter. 2017 to IV quarter 2018 The project fits into the assumptions set out by the ROP WiM RPO by fulfilling the objective of sub-measure 4.3.1 defined as the Increased Energy Efficiency of Public Buildings. Conformity with the type of project is specified in point. 3.7 of the proposal. (English)
    21 October 2020
    0 references

    Identifiers

    RPWM.04.03.01-28-0100/17
    0 references