“Construction and reconstruction of water supply and sewerage systems in a separate territory, served by WSS EOOD, Plovdiv, Bulgaria” (Q3832247): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in en: translated_label)
(‎Created claim: summary (P836): The project “Construction and reconstruction of water supply and sewerage systems in a separate territory, served by WSS EOOD, Plovdiv, Bulgaria” is prepared on the basis of Regional Pre-Investment Study (RPIP) developed by the Ministry of Regional Development and Public Works (MRDPW) with a grant from OPE 2014-2020 under procedure BG16M1OP002-1.001 “Supporting regional investment planning of the WSS sector”. The main activities envisaged within...)
Property / summary
 
The project “Construction and reconstruction of water supply and sewerage systems in a separate territory, served by WSS EOOD, Plovdiv, Bulgaria” is prepared on the basis of Regional Pre-Investment Study (RPIP) developed by the Ministry of Regional Development and Public Works (MRDPW) with a grant from OPE 2014-2020 under procedure BG16M1OP002-1.001 “Supporting regional investment planning of the WSS sector”. The main activities envisaged within the project are as follows:- ‘Reconstruction and construction of sewerage and water supply networks of Plovdiv’;- ‘Reconstruction and construction of a sewage network of Hisarya’;- ‘Reconstruction of a water supply pipeline from PSU South to Plovdiv’;- ‘Reconstruction of a water supply pipeline from North to Plovdiv’; "reconstruction of a water supply pipeline from PS Katunitsa to a 50 m³ cut-off shaft, town of Asenovgrad";- "Reconstruction of a water supply network in Karlovo";- "Reconstruction of a water supply pipeline from HP 2 500 m³ to PS III lift — Parvomay";- "Reconstruction of a water supply pipeline from Stamboliyski PS to the regulation of the town of Stamboliyski. With the realisation of the project will be increased the collected and treated load of pollution before discharge of the waste water into water bodies, water losses in the water transmission networks will be reduced and the water supply of the population in a separate area served by WSS EOOD, Plovdiv will be improved. The implementation of the project will contribute to the achievement of specific objective 1 “Protection and improvement of the status of water resources” of priority axis 1 “Water” of OPE 2014-2020. (English)
Property / summary: The project “Construction and reconstruction of water supply and sewerage systems in a separate territory, served by WSS EOOD, Plovdiv, Bulgaria” is prepared on the basis of Regional Pre-Investment Study (RPIP) developed by the Ministry of Regional Development and Public Works (MRDPW) with a grant from OPE 2014-2020 under procedure BG16M1OP002-1.001 “Supporting regional investment planning of the WSS sector”. The main activities envisaged within the project are as follows:- ‘Reconstruction and construction of sewerage and water supply networks of Plovdiv’;- ‘Reconstruction and construction of a sewage network of Hisarya’;- ‘Reconstruction of a water supply pipeline from PSU South to Plovdiv’;- ‘Reconstruction of a water supply pipeline from North to Plovdiv’; "reconstruction of a water supply pipeline from PS Katunitsa to a 50 m³ cut-off shaft, town of Asenovgrad";- "Reconstruction of a water supply network in Karlovo";- "Reconstruction of a water supply pipeline from HP 2 500 m³ to PS III lift — Parvomay";- "Reconstruction of a water supply pipeline from Stamboliyski PS to the regulation of the town of Stamboliyski. With the realisation of the project will be increased the collected and treated load of pollution before discharge of the waste water into water bodies, water losses in the water transmission networks will be reduced and the water supply of the population in a separate area served by WSS EOOD, Plovdiv will be improved. The implementation of the project will contribute to the achievement of specific objective 1 “Protection and improvement of the status of water resources” of priority axis 1 “Water” of OPE 2014-2020. (English) / rank
 
Normal rank
Property / summary: The project “Construction and reconstruction of water supply and sewerage systems in a separate territory, served by WSS EOOD, Plovdiv, Bulgaria” is prepared on the basis of Regional Pre-Investment Study (RPIP) developed by the Ministry of Regional Development and Public Works (MRDPW) with a grant from OPE 2014-2020 under procedure BG16M1OP002-1.001 “Supporting regional investment planning of the WSS sector”. The main activities envisaged within the project are as follows:- ‘Reconstruction and construction of sewerage and water supply networks of Plovdiv’;- ‘Reconstruction and construction of a sewage network of Hisarya’;- ‘Reconstruction of a water supply pipeline from PSU South to Plovdiv’;- ‘Reconstruction of a water supply pipeline from North to Plovdiv’; "reconstruction of a water supply pipeline from PS Katunitsa to a 50 m³ cut-off shaft, town of Asenovgrad";- "Reconstruction of a water supply network in Karlovo";- "Reconstruction of a water supply pipeline from HP 2 500 m³ to PS III lift — Parvomay";- "Reconstruction of a water supply pipeline from Stamboliyski PS to the regulation of the town of Stamboliyski. With the realisation of the project will be increased the collected and treated load of pollution before discharge of the waste water into water bodies, water losses in the water transmission networks will be reduced and the water supply of the population in a separate area served by WSS EOOD, Plovdiv will be improved. The implementation of the project will contribute to the achievement of specific objective 1 “Protection and improvement of the status of water resources” of priority axis 1 “Water” of OPE 2014-2020. (English) / qualifier
 
point in time: 2 December 2021
Timestamp+2021-12-02T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 10:20, 2 December 2021

Project Q3832247 in Bulgaria
Language Label Description Also known as
English
“Construction and reconstruction of water supply and sewerage systems in a separate territory, served by WSS EOOD, Plovdiv, Bulgaria”
Project Q3832247 in Bulgaria

    Statements

    0 references
    82,858,723.49 Bulgarian lev
    0 references
    42,257,948.98 Euro
    1 December 2021
    0 references
    114,859,021.11 Bulgarian lev
    0 references
    58,578,100.77 Euro
    1 December 2021
    0 references
    0.72 percent
    0 references
    12 September 2019
    0 references
    12 March 2024
    0 references
    0 references
    0 references
    Проект "Доизграждане и реконструкция на водоснабдителни и канализационни системи в обособена територия, обслужвана от "ВиК" ЕООД, гр. Пловдив, България" е подготвен на база Регионално прединвестиционно проучване /РПИП/, разработено от Министерство на регионалното развитие и благоустройството (МРРБ) с безвъзмездна финансова помощ от ОПОС 2014-2020 г. на процедура BG16M1OP002-1.001 „Подпомагане регионалното инвестиционно планиране на отрасъл ВиК“. Основните дейности, предвидени в рамките на проекта са както следва:- "Реконструкция и изграждане на канализационна и водопроводна мрежи на гр. Пловдив";- „Реконструкция и изграждане на канализационна мрежа на гр. Хисаря“;- „Реконструкция на довеждащ водопровод от ПС „ЮГ“ до гр. Пловдив“;- „Реконструкция на довеждащ водопровод от ПС „Север“ до гр. Пловдив“;- „Реконструкция на довеждащ водопровод от ПС Катуница до Прекъсвателна шахта 50м3, гр. Асеновград“;- „Реконструкция на водопроводна мрежа на гр. Карлово“;- „Реконструкция на довеждащ водопровод от НР 2500м3 до ПС III подем - гр. Първомай“;- „Реконструкция на довеждащ водопровод от ПС Стамболийски до регулацията на гр. Стамболийски.С реализирането на проекта ще бъде увеличен събраният и третиран товар на замърсяване преди заустването на отпадъчните води във водни обекти, ще бъдат намалени загубите на вода във водопреносните мрежи и ще бъде подобрено водоснабдяването на населението в обособена територия, обслужвана от "ВиК" ЕООД, гр. Пловдив. Изпълнението на проекта ще допринесе за постигането на специфична цел 1 „Опазване и подобряване състоянието на водните ресурси” на приоритетна ос 1 „Води” на ОПОС 2014 – 2020 г. (Bulgarian)
    0 references
    The project “Construction and reconstruction of water supply and sewerage systems in a separate territory, served by WSS EOOD, Plovdiv, Bulgaria” is prepared on the basis of Regional Pre-Investment Study (RPIP) developed by the Ministry of Regional Development and Public Works (MRDPW) with a grant from OPE 2014-2020 under procedure BG16M1OP002-1.001 “Supporting regional investment planning of the WSS sector”. The main activities envisaged within the project are as follows:- ‘Reconstruction and construction of sewerage and water supply networks of Plovdiv’;- ‘Reconstruction and construction of a sewage network of Hisarya’;- ‘Reconstruction of a water supply pipeline from PSU South to Plovdiv’;- ‘Reconstruction of a water supply pipeline from North to Plovdiv’; "reconstruction of a water supply pipeline from PS Katunitsa to a 50 m³ cut-off shaft, town of Asenovgrad";- "Reconstruction of a water supply network in Karlovo";- "Reconstruction of a water supply pipeline from HP 2 500 m³ to PS III lift — Parvomay";- "Reconstruction of a water supply pipeline from Stamboliyski PS to the regulation of the town of Stamboliyski. With the realisation of the project will be increased the collected and treated load of pollution before discharge of the waste water into water bodies, water losses in the water transmission networks will be reduced and the water supply of the population in a separate area served by WSS EOOD, Plovdiv will be improved. The implementation of the project will contribute to the achievement of specific objective 1 “Protection and improvement of the status of water resources” of priority axis 1 “Water” of OPE 2014-2020. (English)
    2 December 2021
    0 references
    Пловдив
    0 references

    Identifiers

    BG16M1OP002-1.016-0007
    0 references