Department of Protected Labour Plant Wiesław Tański Stolarski – construction of photovoltaic micro-installation (Q131992): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement) |
(Changed label, description and/or aliases in fr: translated_label) |
||
label / fr | label / fr | ||
Usine de travail protégée Wiesław Tański — construction de microinstallation photovoltaïque |
Revision as of 09:20, 2 December 2021
Project Q131992 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Department of Protected Labour Plant Wiesław Tański Stolarski – construction of photovoltaic micro-installation |
Project Q131992 in Poland |
Statements
186,985.89 zloty
0 references
219,983.4 zloty
0 references
85.0 percent
0 references
29 June 2018
0 references
30 June 2019
0 references
ZAKŁAD PRACY CHRONIONEJ - ZAKŁAD STOLARSKI WIESŁAW TAŃSKI
0 references
Inwestycja polega na zakupie i montażu mikroinstalacji fotowoltaicznej. Projekt wpisuje się w typ projektu wymieniony w SzOOP RPO WiM 2014-2020 dla działania 4.1 - instalacji wykorzystujących energię słońca (np. kolektory słoneczne, fotowoltaika) - do 2 MWe/MWth. Instalacje będą służyły potrzebom własnym i będą podłączone do sieci, jednakże ze względu na moc instalacji (do 40 kW) zgodnie z art. 5 ustawy o odnawialnych źródłach energii (Dz.U. 2015 poz. 478) oraz art. 7 ust. 8d ze znaczkiem 4-9 ustawy – Prawo energetyczne (Dz.U. Dz.U. 1997 nr 54 poz. 348) będą one dokonywane na podstawie zgłoszenia bez konieczności posiadania przez beneficjenta ważnych technicznych warunków przyłączenia do sieci. Wnioskodawca posiada obecnie przyłącza gdzie moc umowna wynosi 40 kW. Projekt spełnia wszystkie warunki brzegowe określone w SzOOP. Niniejszy projekt zakłada dostawę i montaż instalacji fotowoltaicznej na dach - 153 paneli (polikrystalicznych) o mocy 39,78 kW z 2 falownikami, niezbędnym okablowaniem i osprzętem w m. Rozogi przy ul Juranda 13A, na działce ew. nr 150/1. Panele pv wykorzystują zjawisko fotowoltaiczne do przetwarzania promieniowania na energię elektryczną. Za pomocą połączeń kablowych przekazują one energię do falowników, gdzie następuje zmiana prądu stałego w prąd zmienny. Elektrownia będzie podłączona do sieci, natomiast nie będzie potrzeby instalowania akumulatorów oraz regulatorów ładowania, ponieważ sieć jest w stanie przyjąć całą wyprodukowaną energię. Wyprodukowana energia będzie wykorzystywana na potrzeby własne a ewentualna nadwyżka będzie wprowadzona do sieci. Projekt zostanie zakończony w ciągu 1 roku od podpisania um. o dofinansowanie. Wnioskodawca zawarł z podmiotem społecznym porozumienie w sprawie lokalnej inicjatywy energetycznej, mającej na celu popularyzację działań w zakresie OZE wśród mieszkańców. Po zrealizowaniu inwestycji system fotowoltaiczny wnioskodawcy będzie wykorzystywany w celach promocyjnych. (Polish)
0 references
The investment consists of the purchase and installation of photovoltaic micro-installations. The project fits into the type of project mentioned in the SzOOP RPO WiM 2014-2020 for action 4.1 – solar energy installations (e.g. solar collectors, photovoltaics) – up to 2 MWe/MWth. Installations will serve their own needs and will be connected to the grid, however due to the capacity of the installation (up to 40 kW) in accordance with Article 5 of the Renewable Energy Sources Act (Journal of Laws 2015 item. 478. and Article 7 8d with stamp 4-9 of the Act – Energy Law (Journal of Laws, Journal of Laws 1997 No. 54, item. 348. they will be made on the basis of a notification without the need for the beneficiary to have valid technical conditions for connection to the network. The applicant currently has connections where the contractual power is 40 kW. The project meets all the shore conditions specified in the Shoop. This project assumes delivery and installation of photovoltaic installation for the roof – 153 (polycrystalline) panels with a power of 39.78 kW with 2 inverters, necessary wiring and accessories in Rozogi at 13A Juranda Street, on plot no. 150/1. Pv panels use the photovoltaic phenomenon to convert radiation into electricity. By means of cable connections, they transmit energy to inverters, where the direct current changes to alternating current. The power plant will be connected to the grid, but there will be no need to install batteries and charging regulators, as the network is able to absorb all the energy produced. The energy produced will be used for own use and any surplus will be put into the grid. The project will be completed within 1 from the signing of the grant agreement. The applicant has concluded an agreement with the social body on a local energy initiative aimed at promoting RES activities among residents. After the investment, the applicant’s photovoltaic system will be used for promotional purposes. (English)
21 October 2020
0 references
Identifiers
RPWM.04.01.00-28-0394/16
0 references