Photovoltaic installation for INTOP Tarnobrzeg Sp. z o.o. (Q118558): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
(‎Changed label, description and/or aliases in fr: translated_label)
label / frlabel / fr
 
Installation photovoltaïque pour INTOP Tarnobrzeg Sp. z o.o.

Revision as of 07:17, 2 December 2021

Project Q118558 in Poland
Language Label Description Also known as
English
Photovoltaic installation for INTOP Tarnobrzeg Sp. z o.o.
Project Q118558 in Poland

    Statements

    0 references
    666,416.99 zloty
    0 references
    159,940.08 Euro
    13 January 2020
    0 references
    784,020.0 zloty
    0 references
    188,164.8 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 August 2017
    0 references
    30 June 2020
    0 references
    INTOP TARNOBRZEG SP. Z O.O.
    0 references
    0 references
    Celami projektu są:1. Zwiększenie produkcji energii elektrycznej o 177 531 Kwh/rok w 2019r. z nowo wybudowanej instalacji wykorzystującej OZE w miejscowości Stale poprzez montaż instalacji fotowoltaicznej o mocy 179,2 kWp w 2018r. 2. Zmniejszenie emisji CO2 o 146,46 tony/rok w 2019r.Projekt dotyczy budowy elektrowni fotowoltaicznej na dachach budynków Wnioskodawcy:Moc elektrowni fotowoltaicznej: 179,2 kWpIlość produkowanej energii elektrycznej: 177 531 Kwh/rok.Podstawowe parametry elektrowni fotowoltaicznej:1. Panele polikrystaliczne 640 szt.2. konstrukcja wsporcza 180 kpl.3. Falownik 6 szt.4. okablowanie DC 2300 mb5. Rozdzielnica DC 6 szt.6. Rozdzielnica AC 6 szt.7. Instalacja uziemiająca 6 szt.8. Okablowanie AC 1 kpl.Projekt obejmuje budowę przyłącza nN (wewnętrznej kablowej linii zasilającej na trasie rozdzielnia nN PV – istniejące u Wnioskodawcy złącze kablowe). (Polish)
    0 references
    The objectives of the project are:1. Increase the production of electricity by 177 531 Kwh/year in 2019 from the newly built RES installation in Stale by installing a photovoltaic installation with a capacity of 179.2 kWp in 2018. 2. Reduction of CO2 emissions by 146.46 tonnes/year in 2019 The project concerns the construction of a photovoltaic power plant on roofs of buildings Applicants:Power power: 179,2 kWvolume of electricity produced: 177 531 Kwh/year.Basic parameters of the photovoltaic power plant:1. Polycrystalline panels 640 pcs.2. support structure 180 kpl.3. Inverter 6 pcs4. wiring DC 2300 mb5. Switchboard DC 6 pcs.6. Switchboard AC 6 pcs.7. Grounding installation 6 pcs.8. Wiring AC 1 kpl.The project includes the construction of the nN connection (internal cable supply line on the distribution line nN PV – the cable connector existing in the Applicant). (English)
    20 October 2020
    0 references

    Identifiers

    RPPK.03.01.00-18-0409/17
    0 references