Photovoltaic installation for the company ELEKTROMONTAGE OF ACTION COMMUNITY COMMUNITY (Q118577): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement) |
(Changed label, description and/or aliases in fr: translated_label) |
||
label / fr | label / fr | ||
Installation photovoltaïque pour la société ELEKTROMONTAGE DES REPRESENTATIVES AKCYJNA SPÓŁKA |
Revision as of 07:17, 2 December 2021
Project Q118577 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Photovoltaic installation for the company ELEKTROMONTAGE OF ACTION COMMUNITY COMMUNITY |
Project Q118577 in Poland |
Statements
807,921.99 zloty
0 references
973,400.0 zloty
0 references
83.0 percent
0 references
10 July 2019
0 references
31 March 2020
0 references
ELEKTROMONTAŻ RZESZÓW SPÓŁKA AKCYJNA
0 references
Celami projektu są: 1. Zwiększenie produkcji energii elektrycznej o 201 346 Kwh/rok w 2020r. z nowo wybudowanej instalacji wykorzystującej OZE w miejscowości Rzeszów poprzez montaż instalacji fotowoltaicznej o mocy 199,04 kWp w 2019r. 2. Zmniejszenie emisji CO2 o 166,10 tony/rok w 2020r. Projekt dotyczy budowy elektrowni fotowoltaicznej na dachu budynku Wnioskodawcy: Moc elektrowni fotowoltaicznej: 199,04 kWp Ilość produkowanej energii elektrycznej: 201 346 Kwh/rok. Podstawowe parametry elektrowni fotowoltaicznej: 1. Panele monokrystaliczne 622 szt. 2. konstrukcja wsporcza 200 kpl. 3. Falownik ok. 11 szt. (+/- 1 szt.) 4. okablowanie DC 3000 mb 5. Rozdzielnica DC ok. 11 szt. (+/- 1 szt.) 6. Rozdzielnica AC ok. 11 szt. (+/- 1 szt.) 7. Instalacja uziemiająca ok. 11 szt. (+/- 1 szt.) 8. Okablowanie AC 1 kpl. 9. Układ pomiarowy 1 kpl. (Polish)
0 references
The objectives of the project shall be: 1. Increase the production of electricity by 201 346 Kwh/year in 2020 from the newly built RES installation in Rzeszów by installing a photovoltaic installation with a capacity of 199.04 kWp in 2019. 2. Reduction of CO2 emissions by 166.10 tonnes/year in 2020 The project concerns the construction of a photovoltaic power plant on the roof of the Applicant’s building: Photovoltaic power plant capacity: 199,04 kWp The amount of electricity produced: 201 Kwh/year. Basic parameters of the photovoltaic power plant: 1. Monocrystalline panels 622 pcs. 2. support structure 200 kpl. 3. Inverter’s ok. 11 pcs (± 1 pcs) 4. DC wiring 3000 mb 5. DC switchboard approx. 11 pcs (± 1 pcs) 6. AC switchboard approx. 11 pcs (± 1 pcs) 7. Grounding installation approx. 11 pcs (± 1 pcs) 8. Wiring AC 1 kpl. 9. Measuring system 1 kpl. (English)
20 October 2020
0 references
Identifiers
RPPK.03.01.00-18-0457/17
0 references