Thermal modernisation of public buildings and increased use of renewable energy sources in the municipality of Chełmiec (Q112225): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
(‎Changed label, description and/or aliases in fr: translated_label)
label / frlabel / fr
 
Thermomodernisation des bâtiments publics et augmentation de l’utilisation des sources d’énergie renouvelables dans la municipalité de Chełmiec

Revision as of 11:14, 1 December 2021

Project Q112225 in Poland
Language Label Description Also known as
English
Thermal modernisation of public buildings and increased use of renewable energy sources in the municipality of Chełmiec
Project Q112225 in Poland

    Statements

    0 references
    1,754,506.87 zloty
    0 references
    421,081.65 Euro
    13 January 2020
    0 references
    4,178,392.39 zloty
    0 references
    1,002,814.17 Euro
    13 January 2020
    0 references
    41.99 percent
    0 references
    30 September 2016
    0 references
    28 December 2018
    0 references
    GMINA CHEŁMIEC
    0 references
    Inwestycja polega na przeprowadzeniu prac termomodernizacyjnych, modernizacji systemów grzewczych, zastosowaniu OZE (fotowoltaika, kolektory słoneczne, biomasa) w 11 budynkach użyteczności publicznej. Optymalny zakres prac określono na podstawie audytów energetycznych opracowanych zgodnie z „Metodyką ...”: Zakres prac wynikający z audytu oraz pozostałe niezbędne elementy obejmują następujące zadania i działania (opisane szczegółowo w punkcie C.2.3): 1.Koszty przygotowawcze: 1.1 audyty energetyczne; 1.2 analiza finansowo-ekonomiczna; 1.3 program funkcjonalno-użytkowy 2.Termomodernizacja - Gminny Ośrodek Pomocy Społecznej - docieplenie przegród zewn. (ściany, stropy), montaż licznika 3.Oddział Przedszkolny w Marcinkowicach - docieplenie przegród zewn. (ściany, strop); wymiana źródeł ciepła, system fotowoltaiczny z licznikiem 4.Szkoła Podstawowa w Januszowej - docieplenie przegród zewn. (ściany), wymiana okien, drzwi, montaż licznika ciepła 5.Szkoła Podstawowa w Klęczanach - docieplenie przegród zewn.(ściany, stropy), wymiana luksferów, wymiana źródła ciepła – biomasa, licznik ciepła, modernizacja inst. c.o. 6.Szkoła Podstawowa w Niskowej - docieplenie przegród zewn. (ściany, stropy), wymiana źródła ciepła - biomasa, licznik ciepła, wymiana inst. c.o. 7.Szkoła Podstawowa w Rdziostowie - docieplenie przegród zewn. (ściany, strop), wymiana okien, drzwi, wymiana źródła ciepła - biomasa, licznik ciepła, modernizacja inst. c.o. z regulacją 8.Zespół Szkół w Chomranicach - docieplenie przegród zewn. (ściany, strop), wymiana źródła ciepła i c.w.u - gaz, liczniki ciepła i ciepłej wody, regulacja inst. c.o. 9.Zespół Szkół w Marcinkowicach - docieplenie przegród zewn. (ściany, strop), wymiana drzwi, wymiana inst. c.o. z regulacją, liczniki ciepła. 10.Zespół Szkół w Paszynie - docieplenie przegród zewn.(ściany, stropy), wymiana drzwi, wymiana inst. c.o., Wymiana źródła ciepła – gaz, licznik ciepła Ciąg dalszy w punkcie Q wniosku o dofinansowanie (Polish)
    0 references
    The investment consists of carrying out thermal modernisation works, modernisation of heating systems, the use of RES (photovoltaics, solar collectors, biomass) in 11 public utility buildings. The optimal scope of work was determined on the basis of energy audits developed in accordance with the “... method”: The scope of audit work and other necessary elements include the following tasks and activities (described in detail in point C.2.3): 1.Preparatory costs: 1.1 energy audits; 1.2 financial and economic analysis; 1.3 functional-use programme 2.Termomodernisation – Municipal Social Assistance Centre – insulation of external compartments. (walls, ceilings), installation of counter 3.Preschool division in Marcinkowice – insulation of external compartments. (walls, ceilings); exchange of heat sources, photovoltaic system with counter 4.Basic School in Januszowa – insulation of external compartments. (walls), replacement of windows, doors, installation of heat meter 5.Basic School in Klęczany – insulation of outer compartments (walls, ceilings), exchange of luxpheres, exchange of heat source – biomass, heat counter, modernisation of the central heating unit 6. (walls, ceilings), exchange of heat source – biomass, heat counter, exchange inst. c.o. 7. Primary school in Rdziostów – warming of outer compartments. (walls, ceiling), replacement of windows, doors, exchange of heat source – biomass, heat counter, modernisation of central heating with regulation 8.School in Chomranice – insulation of outer partitions. (walls, ceiling), replacement of heat source and hot water – gas, heat meters and hot water, regulation of the 9th Central Schools Team in Marcinkowice – insulation of outer partitions. (walls, ceiling), replacement of doors, exchange of central heating with adjustable, heat meters. 10.School team in Paszyn – insulation of outer compartments (walls, ceilings), door replacement, replacement of central heating, heat source exchange – gas, heat counter Continue in point Q of the application for funding (English)
    20 October 2020
    0 references

    Identifiers

    RPMP.04.03.02-12-0197/16
    0 references