Construction of sanitary sewage system with two sewage pumping stations in Kamionka – stage IV (Q105647): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement) |
(Changed label, description and/or aliases in fr: translated_label) |
||
label / fr | label / fr | ||
Construction d’un réseau d’assainissement avec deux stations de pompage des eaux usées à Kamionka — étape IV |
Revision as of 09:58, 1 December 2021
Project Q105647 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Construction of sanitary sewage system with two sewage pumping stations in Kamionka – stage IV |
Project Q105647 in Poland |
Statements
1,788,890.67 zloty
0 references
2,104,577.27 zloty
0 references
85.0 percent
0 references
11 April 2017
0 references
31 December 2019
0 references
GMINA KAMIONKA
0 references
Przedmiotem projektu jest budowa kanalizacji sanitarnej w miejscowości Kamionka, na terenie aglomeracji Kamionka. Wybudowana zostanie sieć grawitacyjna i tłoczna o długości 4673,5 m z dwiema przepompowniami ścieków (długość kanalizacji w aglomeracji = 3730 m, długość sieci poza aglomeracją - 943,5m). W projekcie zaplanowano 106 podłączeń, co umożliwi korzystanie z systemu kanalizacji sanitarnej 498 osobom (techniczna możliwość przyłączeni, które obecnie nie są podłączone do sieci. Projekt ma charakter kolejnego etapu prac związanych z rozbudową kanalizacji w aglomeracji Kamionka. Głównym problemem na tym terenie jest wysoki poziom zwodociągowania, a jednocześnie występujące deficyty w dostępie do sieci. Działki objęte niniejszym projektem są już zwodociągowane, a brak jest na nich dostępu do kanalizacji sanitarnej. Celem projektu jest poprawa proporcji pomiędzy siecią wodociągową, a kanalizacyjną, co doprowadzi do zapewnienia właściwej gospodarki wodno-ściekowej na terenie aglomeracji Kamionka. Zadania zaplanowane w projekcie mają charakter prac budowlanych związanych z budową kanalizacji. Zadania podzielone są na prace dotyczące sieci i przepompowni ścieków. Grupą docelową efektów projektu są: - mieszkańcy zainteresowani podłączeniem do sieci kanalizacji - uzyskają oni dostęp do usługi odbioru ścieków - Gmina Kamionka, która jest ustawowo odpowiedzialna za gospodarkę komunalną na swoim terenie, w tym uporządkowanie gospodarki wodno-ściekowej w aglomeracji Kamionka - dzięki projektowi zwiększy się wskaźnik skanalizowania tej aglomeracji. Ponadto Gmina przybliży się do osiągnięcia celu zapewniania na swoim terenie właściwej infrastruktury technicznej, Realizacja projektu doprowadzi do osiągnięcia w okresie trwałości wskaźników: - rezultatu "Przewidywana liczba osób korzystających z ulepszonego oczyszczania ścieków": 498 osób - produktu "Długość wybudowanej kanalizacji sanitarnej": 3,73 km. (Polish)
0 references
The subject of the project is the construction of sanitary sewage system in Kamionka, within the Kamionka agglomeration. A 4673.5 m long gravitational and pressing network with two sewage pumping stations will be built (water drainage in the agglomeration = 3730 m, net length outside the agglomeration – 943.5 m). The project plans 106 connections to allow the use of the sanitary system to 498 persons (technical connections that are currently not connected to the network). The project is the next stage of work related to the extension of the sewage system in the Kamionka agglomeration. The main problem in this area is the high level of drainage and, at the same time, there are deficits in access to the network. The plots covered by this project are already drained and there is no access to sanitary sewerage. The aim of the project is to improve the proportion between water and sewage networks, leading to proper water and sewage management in the Kamionka agglomeration. The tasks planned in the project are the nature of construction works related to the construction of sewage systems. The tasks are divided into works on networks and sewage pumping plants. The target group of the project’s effects are: — residents interested in connecting to the sewage network – they will have access to the sewage collection service – Kamionka Municipality, which is legally responsible for municipal management in its area, including ordering water and sewage management in the Kamionka agglomeration – thanks to the project, the rate of scanning of this agglomeration will increase. In addition, the Municipality will move towards achieving the objective of providing adequate technical infrastructure on its premises, the implementation of the project will lead to the achievement of the indicators over the durability period: — result “Project number of persons benefiting from improved waste water treatment”: 498 people – product “Length of built sanitary sewage system”: It’s 3,73 miles. (English)
17 October 2020
0 references
Identifiers
RPLU.06.04.00-06-0042/17
0 references