THERMAL MODERNISATION OF THE BUILDING AND THE USE OF RES IN MARPOL (Q105131): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
(‎Changed label, description and/or aliases in fr: translated_label)
label / frlabel / fr
 
THERMOMODERNISATION DU BÂTIMENT ET UTILISATION DES SER À MARPOL

Revision as of 09:27, 1 December 2021

Project Q105131 in Poland
Language Label Description Also known as
English
THERMAL MODERNISATION OF THE BUILDING AND THE USE OF RES IN MARPOL
Project Q105131 in Poland

    Statements

    0 references
    142,576.98 zloty
    0 references
    34,218.48 Euro
    13 January 2020
    0 references
    219,349.26 zloty
    0 references
    52,643.82 Euro
    13 January 2020
    0 references
    65.0 percent
    0 references
    2 May 2019
    0 references
    30 November 2019
    0 references
    KUDŁO JERZY "MARPOL"
    0 references
    0 references
    W ramach wskazanego wariantu przedsięwzięcia termomodernizacyjnego wykonane zostaną następujące prace: - wymiana instalacji c.o. : zastosowanie termozaworów grzejnikowych o czułości 1°K z możliwością zdalnego sterowania nastawami , montaż nowych grzejników , wymiana źródła ciepła z pieca węglowego na kocioł opalany biomasa o mocy ok 25 kW . Instalacja zostanie wyposażona w ciepłomierz a kocioł w programator harmonogramu pracy. - wymiana oświetlenia na oprawy LED - ok 11 szt - wykonanie instalacji fotowoltaicznej o mocy 10 kW i powierzchni absorbera co najmniej 66 m2 - ocieplenie ścian styropianem o współ.?=0,032 i grubości 15 cm . Do wykonania ok 100,92 m2. - docieplenie ścian ocieplonych styropianem EPS 70 40 grubości 10 cm styropianem o współ.?=0,032 i grubości 5 cm . Do wykonania ok 95,93 m2. - ocieplenie stropodachu płytą warstwową z rdzeniem PUR lub PIR o współ.?=0,025 i grubości 16 cm . Do wykonania ok 417,82 m2. - modernizacja instalacji c.w.u. - włączenie nowego zasobnika c.w.u. o poj 100 l do z kotła na biomasę . Zasobnik będzie wyposażony w grzałkę elektryczną zasilaną z instalacji fotowoltaicznej po sezonie grzewczym. Zamontowanie licznika ciepła na wyjściu z zasobnika oraz wodomierza na dopuszczeniu zimnej wody - wymiana bram na bramy segmentowe , podnoszone o współcz. U co najmniej równym 1,3 W/m2K . Do wykonania ok. 45 m2. - Zamontowanie boczkarki o mocy do 4 kW. Realizacja projektu poprzez montaż kotła na biomasę, montaż instalacji fotowolt.oraz oświetlenia energooszczęd. przyczyni się do redukcji emisji C02 do atmosfery. W wyniku osiągnięte zostaną następujące m.in. wskaźniki: - Ilość zaoszczędzonej energii cieplnej - 158,97GJ (41,26 %), - Ilość zaoszczędzonej energii elektrycznej - 108,97 GJ (30,27 MWh; 104,3 %), - Zmniejszenie zużycia energii końcowej - 267,94 GJ (54,7%), - Zmniejszenie emisji CO2 - 69542 kg/rok (100%) - Zmniejszenie emisji PM-10 - 283,85 kg/rok (97,36%) (Polish)
    0 references
    The following works will be carried out within this option of the thermo-modernisation project: — replacement of central heating installations: use of heater valves with a sensitivity of 1°K with the possibility of remote control of settings, installation of new radiators, replacement of heat source from coal furnace to boiler-fired biomass with a power of about 25 kW. The installation will be equipped with a heat meter and a boiler with a timetable programmer. — replacement of lighting for LED luminaires – approx. 11 pcs – production of photovoltaic installation with a power of 10 kW and absorber surface of at least 66 m² – insulation of the walls with styrofoam joint?=0.032 and thickness of 15 cm. Approx. 100.92 m² to be made. — insulation of walls with Styrofoam EPS 70 40 thickness 10 cm Styrofoam with joint.?=0,032 and thickness of 5 cm. Approx. 95.93 m² to be made. — warming of the ceiling with a layer plate with a PUR core or PIR co.?=0.025 and a thickness of 16 cm. Approx. 417.82 m² to be made. — modernisation of the central heating system – incorporation of a new storage tank with a capacity of 100 litres into the biomass boiler. The tray will be equipped with an electric heater powered from a photovoltaic installation after the heating season. Installation of a heat counter on the exit of the reservoir and water meter on the release of cold water – replacement of gates for segment gates, raised by compassion. At least 1,3 W/m2K. It’s okay to do it. 45 m². — Mounting of bacon with power up to 4 kW. The implementation of the project through the installation of a biomass boiler, installation of photovolts. and energy-saving lighting will contribute to reducing C02 emissions into the atmosphere. As a result, the following indicators will be achieved: — The amount of thermal energy saved – 158,97GJ (41.26 %), – The amount of electricity saved – 108.97 GJ (30.27 MWh; 104.3 %), – Reduction of final energy consumption – 267.94 GJ (54.7 %), – Reduction of CO2-69542 kg/year (100 %) – Reduction of PM-10-283.85 kg/year (97.36 %) (English)
    17 October 2020
    0 references

    Identifiers

    RPLU.05.01.00-06-0072/18
    0 references