Modernisation of professional education infrastructure in Sulechów (Q100984): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
(‎Changed label, description and/or aliases in fr: translated_label)
label / frlabel / fr
 
Modernisation des infrastructures d’enseignement professionnel à Sulechów

Revision as of 08:36, 1 December 2021

Project Q100984 in Poland
Language Label Description Also known as
English
Modernisation of professional education infrastructure in Sulechów
Project Q100984 in Poland

    Statements

    0 references
    551,169.26 zloty
    0 references
    132,280.62 Euro
    13 January 2020
    0 references
    648,434.45 zloty
    0 references
    155,624.27 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 February 2017
    0 references
    31 December 2019
    0 references
    POWIAT ZIELONOGÓRSKI
    0 references

    52°5'7.8"N, 15°37'33.2"E
    0 references
    Proj. realizowany będzie w Sulechowie, na obiektach Centrum Kształcenia Zawodowego i Ustawicznego i obejmować będzie przebudowę parteru budynku dydaktycznego (ul. Armii Krajowej 75). Celem głównym proj. jest poprawa infrastruktury edukacyjnej mieszczącej się w CKZiU, które kształci w tym obiekcie uczniów w branżach turystyczne oraz gastronomicznej. W wyniku realizacji proj. osiągnięte zostaną m.in. następujące wskaźniki kluczowe: - Liczba wspartych obiektów infrastruktury jednostek organizacyjnych systemu oświaty - 1(zespół pracowni gastronomiczno-hotelarskich w CKZiU w Sulechowie) - wskaźnik produktu; - Liczba użytkowników wspartych obiektów infrastruktury kształcenia zawodowego - 200 ucz. - wskaźnik rezultatu. - Potencjał objętej wsparciem infrastruktury w zakresie opieki nad dziećmi lub infrastruktury edukacyjnej - 200 uczniów. Planowana inwestycja poprawi infrastrukturę kształcenia zawod. w CKZiU we wskazanych branżach, wpłynie na podniesienie jakości kształcenia, dostosuje pracownia do standardów wyposażenia zalecanych przez MEN, umożliwi prowadzenie egzaminów potwierdzających kwalifik. w zawodach zgodnie z obowiązującymi przepisami. Stan techniczny obecnie wykorzystywanych pracowni uniemożliwia prowadzenie egzaminów w pełnym zakresie, wymaga dostosowania do obecnych przepisów bhp, p-poż oraz prawa budowlanego. Zakres rzeczowy proj. obejmować będzie następujące zadania: I.Wydatki na przygotowanie dokumentacji technicznej proj. - proj. budowlany oraz Studium Wykonalności proj. - wartość zadania: 52767zł-okres realizacji: I-IV kwartał 2017; II. Prace budowlane - przebudowa parteru budynku dydaktycznego w CKZiU w Sulechowie - wartość zad: 803010zł (wydatki kwalifikowane: 585 931,98 zł) - okres realizacji: III i IV kw. 2019. III. Nadzór inwestorski oraz inżynieryjny inwestycji - wartość zadania: 20000zł - okres realizacji: III i IV kw. 2019; IV. Promocja projektu - wartość zadania: 6000zł - okres realizacji: III i IV kw. 2019 (Polish)
    0 references
    The project will be implemented in Sulechów, on the premises of the Centre for Vocational and Continuous Training and will include the reconstruction of the ground floor of the teaching building (ul. 75 – National Army. The main aim of the project is to improve the educational infrastructure located in the CKZiU, which trains pupils in the tourism and catering industries. As a result of the project, the following key indicators will be achieved: — Number of infrastructure facilities supported by organizational units of the education system – 1(a team of catering and hotel studios in the CKZiU in Sulechów) – product indicator; — Number of users supported by vocational training facilities – 200 learner. — result indicator. — Potential of supported childcare infrastructure or educational infrastructure – 200 pupils. The planned investment will improve the infrastructure of vocational training.In the CKZiU in the designated industries, it will improve the quality of education, adapt the workshop to the standards of equipment recommended by the Ministry of Science, will enable you to conduct tests confirming qualifications in the professions in accordance with the applicable regulations. The technical condition of the currently used laboratories makes it impossible to conduct examinations to the full extent, it is necessary to comply with the current regulations of health, fire and construction law. The material scope of the project will include the following tasks: I.Expenditure on the preparation of technical documentation project. — construction project and feasibility study project. — the value of the task: 52767PLN-period of implementation: I-IV quarter 2017; II. Construction works – reconstruction of the ground floor of the teaching building in the CKZiU in Sulechów – the value of the rear: 803010PLN (qualified expenditure: PLN 585 931.98) – implementation period: III and IV quarter 2019. III. Investor supervision and investment engineering – the value of the task: PLN 20000 – implementation period: III and IV quarter 2019. IV. Project promotion – the value of the task: PLN 6000 – implementation period: III and IV quarter 2019 (English)
    17 October 2020
    0 references

    Identifiers

    RPLB.09.03.01-08-0007/18
    0 references