Modernisation of the Northern heat generator in the area of Dąbrowskiego Street in Oświęcim, consisting of demolition of existing sections of the overhead grid and construction of the 2xDn350 mm network in pre-insulated pipe technology (Q84864): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in fr: translated_label)
(‎Created claim: summary (P836): Construction d’un réseau souterrain de 269 m au lieu de 241 m de réseau souterrain., translated_summary)
Property / summary
 
Construction d’un réseau souterrain de 269 m au lieu de 241 m de réseau souterrain. (French)
Property / summary: Construction d’un réseau souterrain de 269 m au lieu de 241 m de réseau souterrain. (French) / rank
 
Normal rank
Property / summary: Construction d’un réseau souterrain de 269 m au lieu de 241 m de réseau souterrain. (French) / qualifier
 
point in time: 30 November 2021
Timestamp+2021-11-30T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 16:25, 30 November 2021

Project Q84864 in Poland
Language Label Description Also known as
English
Modernisation of the Northern heat generator in the area of Dąbrowskiego Street in Oświęcim, consisting of demolition of existing sections of the overhead grid and construction of the 2xDn350 mm network in pre-insulated pipe technology
Project Q84864 in Poland

    Statements

    0 references
    419,000.0 zloty
    0 references
    100,560.0 Euro
    13 January 2020
    0 references
    1,047,500.0 zloty
    0 references
    251,400.0 Euro
    13 January 2020
    0 references
    40.0 percent
    0 references
    3 October 2016
    0 references
    31 December 2018
    0 references
    PRZEDSIĘBIORSTWO ENERGETYKI CIEPLNEJ SP. Z O. O.
    0 references
    0 references
    0 references
    Budowa 269 m sieci podziemnej w miejsce 241 m sieci naziemnej. (Polish)
    0 references
    Construction of 269 m underground network in place of 241 m terrestrial network. (English)
    14 October 2020
    0 references
    Construction d’un réseau souterrain de 269 m au lieu de 241 m de réseau souterrain. (French)
    30 November 2021
    0 references

    Identifiers

    POIS.01.05.00-00-0045/16
    0 references