D3 Svrčinovec – Skalité (2nd phase) (Q3108819): Difference between revisions
Jump to navigation
Jump to search
(Created claim: summary (P836): 1. L’objectif du projet est d’achever le corridor autoroutier de base D3, améliorant ainsi les conditions de circulation internationale et nationale et augmentant la fluidité, la vitesse et la sécurité routière. Après l’achèvement de la construction du tronçon de 12,3 km de D3 en question, des conditions seront créées pour soulager sensiblement le trafic sur les routes I/12 (diversion du trafic en dehors des communes intravilanes) et I/11 (trans...) |
(Changed label, description and/or aliases in de: translated_label) |
||
label / de | label / de | ||
D3 Svrčinovec – Skalité (2. Phase) |
Revision as of 23:13, 29 November 2021
Project Q3108819 in Slovakia
Language | Label | Description | Also known as |
---|---|---|---|
English | D3 Svrčinovec – Skalité (2nd phase) |
Project Q3108819 in Slovakia |
Statements
112,115,000.0 Euro
0 references
131,900,000.0 Euro
0 references
85.0 percent
0 references
9 January 2015
0 references
6 January 2019
0 references
Národná diaľničná spoločnosť, a.s.
0 references
1. Cieľom projektu je dobudovanie základného diaľničného koridoru D3, čím sa skvalitnia podmienky pre medzinárodnú a vnútroštátnu dopravu a zvýši sa plynulosť, rýchlosť a zároveň bezpečnosť cestnej premávky. Po ukončení výstavby predmetného úseku D3 v dĺžke 12,3 km sa vytvoria podmienky k podstatnému odľahčeniu dopravy na ceste I/12 (odklon dopravy mimo intravilán obcí) a I/11 (odklon tranzitej nákladnej aj osobnej dopravy).2. Aktivity projektu sú zamerané na výstavbu diaľníc a rýchlostných ciest vrátane privádzačov (TEN-T CORE) s cieľom odstránenia kľúčových úzkych miest na cestnej infraštruktúre TEN-T prostredníctovm výstavby nových úsekov diaľníc a rýchlostných ciest. 3. Miestom realizácie projektu je Žilinský kraj, okres Čadca. Diaľnica D3 je súčasťou TEN-T CORE siete, pričom plní význámnú vnútroštátnu ako aj medzinárodnú dopravnú funkciu predovšetkým v smere sever - juh.4. Merateľnými ukazovateľmi predmetného projektu sú:Celková dĺžka novovybudovaných ciest v sieti TEN-T (CORE) - 12,282 km.Úspora času v cestnej doprave na diaľniciach a rýchlostných cestách - 15 568 570 eur.Úspora produkcie emisií NO2 (vplyvom výstavby diaľníc) - 15 ton.Úspora produkcie emisií PM10 (vplyvom výstavby diaľníc) - 0,58 tony. (Slovak)
0 references
1. The aim of the project is to complete the basic motorway corridor D3, thus improving conditions for international and national traffic and increasing fluidity, speed and road safety. After the completion of the construction of the 12,3 km section of D3 in question, conditions will be created to significantly relieve traffic on roads I/12 (diversion of traffic outside the intravilan municipalities) and I/11 (transit from both freight and passenger traffic).2. The activities of the project focus on the construction of motorways and expressways, including feeders (TEN-T CORE), with the aim of removing key bottlenecks on the TEN-T road infrastructure through the construction of new sections of motorways and expressways. 3. The place of implementation of the project is Žilinský kraj, okres Čadca. The D3 motorway is part of the TEN-T CORE network, performing a well-known national and international transport function, particularly in the north-south direction.4. Measurable indicators of the project in question sú:Celková length of newly built roads on the TEN-T network (CORE) – 12.282 km.Saving time in road transport on motorways and expressways – EUR 15 568 570.Saving of NO2 emissions (impact of motorway construction) – 15 tonnes.Saving emissions of PM10 (impact of motorway construction) – 0.58 tonnes. (English)
28 September 2021
0 references
1. L’objectif du projet est d’achever le corridor autoroutier de base D3, améliorant ainsi les conditions de circulation internationale et nationale et augmentant la fluidité, la vitesse et la sécurité routière. Après l’achèvement de la construction du tronçon de 12,3 km de D3 en question, des conditions seront créées pour soulager sensiblement le trafic sur les routes I/12 (diversion du trafic en dehors des communes intravilanes) et I/11 (transit à la fois de fret et de passagers).2. Les activités du projet se concentrent sur la construction d’autoroutes et d’autoroutes, y compris des bornes d’alimentation (RTE-T CORE), dans le but de supprimer les principaux goulets d’étranglement sur les infrastructures routières du RTE-T grâce à la construction de nouveaux tronçons d’autoroutes et d’autoroutes. 3. Le lieu de mise en œuvre du projet est Žilinský kraj, okres Čadca. L’autoroute D3 fait partie du réseau TEN-T CORE, assurant une fonction de transport nationale et internationale bien connue, en particulier dans la direction nord-sud.4. Indicateurs mesurables du projet en question sú:Celková longueur des routes nouvellement construites sur le réseau RTE-T (CORE) — 12,282 km.Gagner du temps dans le transport routier sur les autoroutes et les voies rapides — 15 568 570 EUR.Économie d’émissions de NO2 (impact de la construction d’autoroutes) — 15 tonnes.Éduction d’émissions de PM10 (impact de la construction d’autoroutes) — 0,58 tonnes. (French)
27 November 2021
0 references
Identifiers
311021G032
0 references