Turčiansky Peter, Košťany nad Turcom – sewerage (Q3107944): Difference between revisions
Jump to navigation
Jump to search
(Created claim: summary (P836): L’objectif du projet est l’achèvement du réseau d’assainissement et l’enlèvement de l’OP des parties auparavant insalubres du village ainsi que de l’IBV nouvellement proposé dans le village Turčiansky Peter et Koštany nad Turcom. Le projet résout également la construction du réseau d’approvisionnement en eau pour l’IBV nouvellement conçu dans le village Turčiansky Peter et Koštany nad Turcom dans une ligne commune avec les eaux usées. L’achèveme...) |
(Changed label, description and/or aliases in de: translated_label) |
||
label / de | label / de | ||
Turčiansky Peter, Košþany nad Turcom – Kanalisation |
Revision as of 23:06, 29 November 2021
Project Q3107944 in Slovakia
Language | Label | Description | Also known as |
---|---|---|---|
English | Turčiansky Peter, Košťany nad Turcom – sewerage |
Project Q3107944 in Slovakia |
Statements
3,479,557.13 Euro
0 references
4,093,596.62 Euro
0 references
85.0 percent
0 references
4 January 2016
0 references
3 January 2018
0 references
Turčianska vodárenská spoločnosť, a.s.
0 references
Účelom projektu je dobudovanie kanalizácie a odvedenie OV z doposiaľ neodkanalizovaných častí obce ako aj z novo navrhovanej IBV v obci Turčiansky Peter a Košťany nad Turcom. Tak isto projekt rieši aj výstavbu vodovodnej siete pre novo navrhovanú IBV v obci Turčiansky Peter a Košťany nad Turcom v spoločnej ryhe s kanalizáciou. Dobudovanie odkanalizovania obci je navrhnuté gravitačnou splaškovou kanalizáciou s miestnym prečerpávaním splaškových odpadových vôd cez čerpacie stanice a čistením odpadových vôd na ČOV Vrútky. Dobudovaním kanalizácie a tým i odvedením odpadových vôd z neodkanalizovaných častí spomínaných obcí sa jednoznačne zlepší životné prostredie v regióne. Zlikvidujú sa žumpy, ktoré môžu byť netesné a zamedzí sa nekontrolovateľnému vypúšťaniu splaškových vôd. V rámci projektu sa vybuduje 6,6035 km splaškovej kanalizácie, vyhotoví sa 270 kanalizačných zaústení ďalej sa vybuduje 2,516 km vodovodného potrubia s toho je 2,099 km vedené spoločnej v jednej ryhe so splaškovou kanalizáciou. V rámci projektu sa zvýši počet obyvateľov so zlepšeným čistením OV o 756 obyvateľov a zasobovaním pitnou vodou o 140 obyvateľov. V súčasnosti je pripojených na splaškovú kanalizáciu s čistením odpadových vôd na ČOV Vrútky 2 326 obyvateľov. Po vybudovaní projektu bude napojených na splaškovú kanalizáciu s čistením OV na ČOV Vrútky v predmetnej aglomerácii 3 082 obyvateľov. (Slovak)
0 references
The purpose of the project is the completion of the sewerage system and the removal of the PO from the previously unscanned parts of the village as well as from the newly proposed IBV in the village Turčiansky Peter and Koštany nad Turcom. The project also solves the construction of the water supply network for the newly designed IBV in the village Turčiansky Peter and Koštany nad Turcom in a common line with sewerage. The completion of the sewerage of the village is designed by gravitational sewage sewerage with local sewage pumping through pumping stations and wastewater treatment at the Vrútky WWTP. The completion of the sewerage system and, therefore, the removal of waste water from the unsewn parts of the mentioned municipalities will clearly improve the environment in the region. Cesspools that can be leaked and avoid uncontrollable discharges of sewage are discarded. The project will build 6,6035 km of sewage sewerage, 270 sewerage pipes will be built further, 2.516 km of water pipes are built with 2,099 km of common sewerage. The project will increase the population with improved treatment of POs by 756 inhabitants and drinking water supply by 140 inhabitants. Currently, there are 2 326 inhabitants connected to sewage treatment at the Vrútky wastewater treatment plant. After the construction of the project will be connected to the sewage system with the cleaning of the PO to the WWTP Vrútky in the agglomeration in question 3 082 inhabitants. (English)
28 September 2021
0 references
L’objectif du projet est l’achèvement du réseau d’assainissement et l’enlèvement de l’OP des parties auparavant insalubres du village ainsi que de l’IBV nouvellement proposé dans le village Turčiansky Peter et Koštany nad Turcom. Le projet résout également la construction du réseau d’approvisionnement en eau pour l’IBV nouvellement conçu dans le village Turčiansky Peter et Koštany nad Turcom dans une ligne commune avec les eaux usées. L’achèvement de l’assainissement du village est conçu par un système d’assainissement gravitationnel avec pompage local des eaux usées par des stations de pompage et traitement des eaux usées à la station d’épuration de Vrútky. L’achèvement du réseau d’assainissement et, par conséquent, l’évacuation des eaux usées des parties non cousues des communes mentionnées amélioreront clairement l’environnement dans la région. Cesspools qui peuvent être fuis et éviter des rejets incontrôlables d’eaux usées sont rejetés. Le projet permettra de construire 6,6035 km d’égouts, 270 conduites d’égouts supplémentaires, 2,516 km de conduites d’eau avec 2,099 km d’égouts communs. Le projet permettra d’accroître la population grâce à l’amélioration du traitement des OP de 756 habitants et de l’approvisionnement en eau potable de 140 habitants. Actuellement, 2 326 habitants sont raccordés au traitement des eaux usées de la station d’épuration de Vrútky. Après la construction du projet sera raccordé au réseau d’égouts avec le nettoyage de l’OP à la station d’épuration Vrútky dans l’agglomération en question 3 082 habitants. (French)
27 November 2021
0 references
Identifiers
310011A011
0 references