Modernisation of Hospital with policlinic Sv. Luká and Galanta, a.s. to increase the productivity and efficiency of the provision of acute health care (Q3101147): Difference between revisions
Jump to navigation
Jump to search
(Created claim: summary (P836): Grâce à la mise en œuvre du projet "Modernisation de l’Hôpital avec Policlinic Sv. Lukáša Galanta, a.s. pour accroître la productivité et l’efficacité de la prestation de soins de santé aigus" améliorera immédiatement et augmentera le niveau de la prestation de soins de santé. Il est prévu d’y parvenir principalement en construisant des soins de santé d’urgence qualifiés sous la forme d’un accueil d’urgence en lien étroit avec le lieu de travail...) |
(Changed label, description and/or aliases in de: translated_label) |
||
label / de | label / de | ||
Modernisierung des Krankenhauses mit polizeilichem Sv. Lukáša Galanta, a.s. zur Steigerung der Produktivität und Effizienz der Versorgung mit akuter Gesundheitsversorgung |
Revision as of 20:52, 29 November 2021
Project Q3101147 in Slovakia
Language | Label | Description | Also known as |
---|---|---|---|
English | Modernisation of Hospital with policlinic Sv. Luká and Galanta, a.s. to increase the productivity and efficiency of the provision of acute health care |
Project Q3101147 in Slovakia |
Statements
3,103,289.31 Euro
0 references
3,650,928.6 Euro
0 references
85.0 percent
0 references
1 July 2019
0 references
1 June 2022
0 references
Nemocnica s poliklinikou Sv. Lukáša Galanta, a.s.
0 references
Prostredníctvom realizácie projektu „Modernizácia Nemocnice s poliklinikou Sv. Lukáša Galanta, a.s. pre zvýšenie produktivity a efektívnosti poskytovania akútnej zdravotnej starostlivosti“ bezprostredne dôjde ku skvalitneniu a zvýšeniu úrovne poskytovania zdravotnej starostlivosti. Predmetné sa plánuje docieliť primárne vybudovaním kvalifikovanej urgentnej zdravotnej starostlivosti v podobe Urgentného príjmu s úzkym prepojením so zjednoteným pracoviskom OAMIS – Oddelenie anestéziológie a multiodborovej intenzívnej starostlivosti a Oddelením rádiológie, kde plánované investície nadväzujú na už zrealizovanú rekonštrukciu a budú realizované v tesnej blízkosti tak, aby tvorili s Rádiologickým oddelením jeden celok bez zbytočných časových strát pri presune pacientov. Realizáciou projektu budú dosiahnuté nasledovné merateľné ukazovatele: Odhadované ročné zníženie emisií skleníkových plynov – 7,914 ekviv. CO2; Počet renovovaných verejných budov – 1; Počet zmodernizovaných akútnych všeobecných nemocníc – 1; Podlahová plocha renovovaných verejných budov – 1 851m2; Zníženie ročnej spotreby primárnej energie vo verených budovách – 854 918,99 kWh/rok. (Slovak)
0 references
Through the implementation of the project "Modernisation of Hospital with Policlinic Sv. Lukáša Galanta, a.s. to increase the productivity and efficiency of the provision of acute health care" will immediately improve and increase the level of healthcare provision. This is planned to be achieved primarily by building qualified emergency health care in the form of emergency reception with close connection with the unified OAMIS workplace – Department of Anesthesiology and Multidisciplinary Intensive Care and the Radiology Department, where planned investments follow up on already completed reconstruction and will be carried out in close proximity to form a single whole with the radiological department without unnecessary time losses when transferring patients. The following measurable indicators will be achieved through the implementation of the project: Estimated annual greenhouse gas emission reductions – 7.914 equilibrium. CO2; Number of refurbished public buildings – 1; Number of acute general hospitals upgraded – 1; Floor area of renovated public buildings – 1851 m²; Reduction of annual primary energy consumption in public buildings – 854918.99 kWh/year. (English)
28 September 2021
0 references
Grâce à la mise en œuvre du projet "Modernisation de l’Hôpital avec Policlinic Sv. Lukáša Galanta, a.s. pour accroître la productivité et l’efficacité de la prestation de soins de santé aigus" améliorera immédiatement et augmentera le niveau de la prestation de soins de santé. Il est prévu d’y parvenir principalement en construisant des soins de santé d’urgence qualifiés sous la forme d’un accueil d’urgence en lien étroit avec le lieu de travail unifié OAMIS — Département d’anesthésie et de soins intensifs multidisciplinaires et le département de radiologie, où les investissements prévus font suite à la reconstruction déjà achevée et seront réalisés à proximité immédiate pour former un seul ensemble avec le département radiologique sans perte de temps inutile lors du transfert de patients. Les indicateurs mesurables suivants seront atteints grâce à la mise en œuvre du projet: Réductions annuelles estimées des émissions de gaz à effet de serre — équilibre 7,914. CO2; Nombre de bâtiments publics rénovés — 1; Nombre d’hôpitaux généraux d’urgence modernisés — 1; Surface au sol des bâtiments publics rénovés — 1 851 m²; Réduction de la consommation annuelle d’énergie primaire dans les bâtiments publics — 854 918,99 kWh/an. (French)
27 November 2021
0 references
Identifiers
302021M098
0 references