Slovak Republic, completion of ilina Teplička marshalling station and downstream railway infrastructure in node ilina – design documentation of DSP, DRS and DVZ (Q3100654): Difference between revisions
Jump to navigation
Jump to search
(Created claim: summary (P836): L’objet du projet est le traitement de la documentation du projet «ŽSR, achèvement de la gare de triage Žilina Teplička et de l’infrastructure ferroviaire en aval du nœud Žilina» ventilée:• la documentation relative au permis de construire, y compris les activités d’ingénierie;• la documentation pour la mise en œuvre de la construction, y compris l’évaluation des STI;• la documentation relative à la sélection du contractant. La documentation pré...) |
(Changed label, description and/or aliases in de: translated_label) |
||
label / de | label / de | ||
ŽSR, Fertigstellung des Rangierbahnhofs Žilina Teplička und der nachgelagerten Eisenbahninfrastruktur im Knoten Žilina – Entwurfsdokumentation von DSP, DRS und DVZ |
Revision as of 20:43, 29 November 2021
Project Q3100654 in Slovakia
Language | Label | Description | Also known as |
---|---|---|---|
English | Slovak Republic, completion of ilina Teplička marshalling station and downstream railway infrastructure in node ilina – design documentation of DSP, DRS and DVZ |
Project Q3100654 in Slovakia |
Statements
3,334,660.19 Euro
0 references
3,923,129.63 Euro
0 references
85.0 percent
0 references
1 December 2015
0 references
1 February 2022
0 references
Železnice Slovenskej republiky
0 references
Predmetom projektu je spracovanie projektovej dokumentácie k projektu „ŽSR, dostavba zriaďovacej stanice Žilina Teplička a nadväzujúcej železničnej infraštruktúry v uzle Žilina" v členení:• dokumentácia pre stavebné povolenie vrátane inžinierskej činnosti;• dokumentácia pre realizáciu stavby vrátane posúdenia TSI;• dokumentácia pre výber zhotoviteľa. Vypracovaná dokumentácia a následná stavba vytvorí globálny projekt "ŽSR, dostavba zriaďovacej stanice Žilina Teplička a nadväzujúcej železničnej infraštruktúry v uzle Žilina", ktorý je hlavne zameraný na modernizáciu železničného uzla Žilina. Modernizácia je nevyhnutným predpokladom pre plnohodnotné vytvorenie tranzitného železničného koridoru v smere sever - juh spĺňajúceho požiadavky Technických špecifikácií pre interoperabilitu konvenčných železničných systémov Európy. Táto modernizácia je taktiež nevyhnutným medzníkom pri prechode prevádzky na ekonomicky výhodnejšiu striedavú elektrickú trakciu s jednofázovým systémov 25 kV, 50 Hz a pre plnohodnotný prechod na dispečerské riadenie zmodernizovaných traťových úsekov. Pre možnosť budúcej modernizácie infraštruktúry je momentálne potrebné vypracovať projektovú dokumentáciu. Projekt plynulo nadväzuje na spracovanie projektovej prípravy predmetnej stavby s podporou Operačného programu Doprava 2007 - 2013. (Slovak)
0 references
The subject of the project is the processing of project documentation for the project “ŽSR, completion of the marshalling station Žilina Teplička and the downstream railway infrastructure in the node Žilina” broken down:• documentation for the building permit, including engineering activities;• documentation for the implementation of the construction, including assessment of TSIs;• documentation for the selection of the contractor. The prepared documentation and subsequent construction will create a global project “ŽSR, completion of the marshalling station Žilina Teplička and the downstream railway infrastructure in the node Žilina”, which is mainly focused on the modernisation of the railway node Žilina. Modernisation is a prerequisite for the full establishment of a north-south transit corridor meeting the requirements of the Technical Specifications for the interoperability of Europe’s conventional rail systems. This modernisation is also a necessary milestone in the transition of operation to more economically efficient alternating electric traction with single-phase 25 kV, 50 Hz systems and for a full transition to the dispatcher control of upgraded track sections. For future infrastructure upgrades, it is now necessary to draw up project documentation. The project seamlessly follows the processing of the project preparation of the building in question with the support of the Operational Programme Transport 2007-2013. (English)
28 September 2021
0 references
L’objet du projet est le traitement de la documentation du projet «ŽSR, achèvement de la gare de triage Žilina Teplička et de l’infrastructure ferroviaire en aval du nœud Žilina» ventilée:• la documentation relative au permis de construire, y compris les activités d’ingénierie;• la documentation pour la mise en œuvre de la construction, y compris l’évaluation des STI;• la documentation relative à la sélection du contractant. La documentation préparée et la construction ultérieure créeront un projet global «ŽSR, achèvement de la gare de triage Žilina Teplička et de l’infrastructure ferroviaire en aval du nœud Žilina», qui est principalement axé sur la modernisation du nœud ferroviaire Žilina. La modernisation est une condition préalable à la mise en place complète d’un corridor de transit nord-sud répondant aux exigences des spécifications techniques d’interopérabilité des systèmes ferroviaires conventionnels européens. Cette modernisation constitue également une étape nécessaire dans la transition de l’exploitation vers une traction électrique en alternance plus efficace sur le plan économique avec des systèmes monophasés de 25 kV, 50 Hz et pour une transition complète vers le régulateur de commande des tronçons de voie améliorés. Pour les futures mises à niveau des infrastructures, il est désormais nécessaire d’établir la documentation du projet. Le projet suit parfaitement le traitement de la préparation du projet du bâtiment en question avec le soutien du programme opérationnel «Transports 2007-2013». (French)
27 November 2021
0 references
Identifiers
311011C277
0 references