Preparation of documentation for the reconstruction of the House of Labour in fighting settlement and conversion into Vukovar Area of “Lavoslav Ružka” (Q2734914): Difference between revisions
Jump to navigation
Jump to search
(Created claim: summary (P836): Le résultat du projet est une documentation technique (étude de la capacité de roulement actuelle de la structure, conception conceptuelle, conception principale avec relevé des coûts, conception détaillée, projet d’ameublement intérieur et obtention de tous les permis de construction) et étude de faisabilité avec analyse coûts-avantages (FS/CBA). La préparation de la documentation du projet pour le projet de reconstruction du bâtiment «atelier»...) |
(Changed label, description and/or aliases in de: translated_label) |
||
label / de | label / de | ||
Vorbereitung der Dokumentation für die Rekonstruktion des „Workshop“-Gebäudes im Resort Borovo und Umwandlung in die Räumlichkeiten der Polytechnischen „Lavoslav Ružićka“ in Vukovar |
Revision as of 20:26, 29 November 2021
Project Q2734914 in Croatia
Language | Label | Description | Also known as |
---|---|---|---|
English | Preparation of documentation for the reconstruction of the House of Labour in fighting settlement and conversion into Vukovar Area of “Lavoslav Ružka” |
Project Q2734914 in Croatia |
Statements
1,870,000.0 Croatian kuna
0 references
2,200,000.0 Croatian kuna
0 references
85.0 percent
0 references
20 July 2018
0 references
19 November 2019
0 references
Grad Vukovar
0 references
32000
0 references
Rezultat projekta je izrađena projektna dokumentacija koja se sastoji od tehničke dokumentacije (elaborat trenutne nosivosti konstrukcije, idejno rješenje, glavni projekt s troškovnikom, izvedbeni projekt, projekt unutarnjeg opremanja te ishođenje svih dozvola za gradnju) i studije izvedivosti s cost-benefit analizom (FS/CBA). Izrada projektne dokumentacije za projekt Rekonstrukcija zgrade "Radnički dom" u Borovu naselju i prenamjena u prostor Veleučilišta "Lavoslav Ružička" u Vukovar imati će značajan utjecaj na fizičku, društvenu, ali i gospodarsku regeneraciju grada Vukovara. Obnovom zgrade "Radničkog doma" koja se nalazi unutar registrirane kulturno-povijesne cjeline "Bata Ville", u funkciju će se staviti zgrada kulturne baštine. Proširenjem kapaciteta stvaraju se uvjeti za osnivanje novih odjela Veleučilišta kojima će se proširiti obrazovna ponuda te osigurati prostor za odjel gradske i veleučilišne knjižnice. Po isporučenom setu projektne dokumentacije stvaraju se uvjeti za provedbu projekta Rekonstrukcija zgrade "Radnički dom" u Borovu naselju i prenamjena u prostor Veleučilišta "Lavoslav Ružička" u Vukovaru unutar ograničenog poziva na dostavu projektnih prijedloga trajnog modaliteta: Provedba Intervencijskog plana Grada Vukovara. (Croatian)
0 references
The result of the project is a project dossier consisting of technical documentation (study of the current load of construction, design concept, main design with cost statements, construction projects, internal fitting-out works and obtaining all construction permits) and test feasibility studies with cost-benefit analysis (FS/CBA). The design of the project documentation for the Reconstruction of the Labour House in Strasbourg and the redevelopment into the area of Vukovar Higher Education in Vukovar will have a significant impact on the physical, social as well as the economic regeneration of Vukovar. The renovation of the ‘Labour House’ building, which is located within the registered cultural-historical unit ‘Bata Ville’, will serve as a cultural heritage building. The capacity extension creates the conditions for the establishment of the new departments of the University College, which will expand the educational offer and provide scope for the city and metropolitan division of the College. An delivered set of project documentation sets out the conditions for the project to implement the ‘Labour House’ reconstruction into the village and convert into the space of the VHEI “Lavoslav Risčka” in Vukovar, within a restricted call for proposals on a permanent way: Implementation of the Vukovar City Emergency Plan. (English)
3 June 2021
0 references
Le résultat du projet est une documentation technique (étude de la capacité de roulement actuelle de la structure, conception conceptuelle, conception principale avec relevé des coûts, conception détaillée, projet d’ameublement intérieur et obtention de tous les permis de construction) et étude de faisabilité avec analyse coûts-avantages (FS/CBA). La préparation de la documentation du projet pour le projet de reconstruction du bâtiment «atelier» dans la station de Borovo et la transformation en locaux du polytechnique «Lavoslav Ružička» à Vukovar auront un impact significatif sur la régénération physique, sociale et économique de la ville de Vukovar. Avec la rénovation du bâtiment «Maison de l’atelier» situé dans l’unité culturelle et historique enregistrée «Bata Villa», le bâtiment du patrimoine culturel sera mis en service. L’expansion des capacités crée les conditions pour la création de nouveaux départements de l’Université des Sciences Appliquées, qui élargiront l’offre éducative et fourniront de l’espace pour le département de la ville et la bibliothèque polytechnique. Selon l’ensemble soumis de la documentation du projet, les conditions sont créées pour la mise en œuvre du projet de reconstruction du bâtiment «Maison de travail» dans la station de Borovo et la conversion dans les locaux de l’Université des sciences appliquées «Lavoslav Ružička» à Vukovar dans le cadre de l’appel à propositions limité de modalités permanentes: Mise en œuvre du plan d’intervention de la ville de Vukovar. (French)
29 November 2021
0 references
Identifiers
KK.08.2.1.03.0023
0 references