Health Network of the BEMPOSTA-OLIVEIRA PINESS OF AZEMIES — Good Pine Subsystem (Q3389385): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in en: translated_label) |
(Created claim: summary (P836): This operation aims at the installation of the drainage network of residual waters in locations not yet served, namely in the parish of Pinheiro da Bemposta, including the construction of a WWTP that will treat the collected effluent. The realisation of the operation allows the arrival of an additional 2 093 inhabitants, which translates into an increase in the coverage rate in the order of 3.1 % in the municipality as a whole., translated_summary) |
||||||||||||||
Property / summary | |||||||||||||||
This operation aims at the installation of the drainage network of residual waters in locations not yet served, namely in the parish of Pinheiro da Bemposta, including the construction of a WWTP that will treat the collected effluent. The realisation of the operation allows the arrival of an additional 2 093 inhabitants, which translates into an increase in the coverage rate in the order of 3.1 % in the municipality as a whole. (English) | |||||||||||||||
Property / summary: This operation aims at the installation of the drainage network of residual waters in locations not yet served, namely in the parish of Pinheiro da Bemposta, including the construction of a WWTP that will treat the collected effluent. The realisation of the operation allows the arrival of an additional 2 093 inhabitants, which translates into an increase in the coverage rate in the order of 3.1 % in the municipality as a whole. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: This operation aims at the installation of the drainage network of residual waters in locations not yet served, namely in the parish of Pinheiro da Bemposta, including the construction of a WWTP that will treat the collected effluent. The realisation of the operation allows the arrival of an additional 2 093 inhabitants, which translates into an increase in the coverage rate in the order of 3.1 % in the municipality as a whole. (English) / qualifier | |||||||||||||||
point in time: 29 November 2021
|
Revision as of 19:42, 29 November 2021
Project Q3389385 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | Health Network of the BEMPOSTA-OLIVEIRA PINESS OF AZEMIES — Good Pine Subsystem |
Project Q3389385 in Portugal |
Statements
1,600,000.0 Euro
0 references
2,147,843.0 Euro
0 references
74.49 percent
0 references
30 June 2021
0 references
29 June 2023
0 references
MUNICÃPIO DE OLIVEIRA DE AZEMÃIS
0 references
Esta operação visa a instalação da rede de drenagem de águas residuais em localidades ainda não servidas, nomeadamente na Freguesia de Pinheiro da Bemposta, incluindo a construção de uma ETAR que tratará o efluente recolhido.A concretização da operação permitirá chegar a mais 2 093 habitantes, o que se traduz num aumento de taxa de cobertura na ordem dos 3,1% no conjunto do concelho. (Portuguese)
0 references
This operation aims at the installation of the drainage network of residual waters in locations not yet served, namely in the parish of Pinheiro da Bemposta, including the construction of a WWTP that will treat the collected effluent. The realisation of the operation allows the arrival of an additional 2 093 inhabitants, which translates into an increase in the coverage rate in the order of 3.1 % in the municipality as a whole. (English)
29 November 2021
0 references
Oliveira de Azeméis, Ãrea Metropolitana do Porto, Norte
0 references
Identifiers
POSEUR-03-2012-FC-001454
0 references