Replacement for asbestos cement coverage of the EB 2+ 3 School of Arch of Baolhe (Q3368620): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in en: translated_label) |
(Created claim: summary (P836): This operation consists of replacing the existing asbestos-cement covering the school building of the EB 2+ 3 School of Baolhe Arch, eliminating potentially harmful factors for human health and the environment associated with the existence of asbestos-containing materials in their composition, with the aim of creating better conditions of safety and health for the entire school community., translated_summary) |
||||||||||||||
Property / summary | |||||||||||||||
This operation consists of replacing the existing asbestos-cement covering the school building of the EB 2+ 3 School of Baolhe Arch, eliminating potentially harmful factors for human health and the environment associated with the existence of asbestos-containing materials in their composition, with the aim of creating better conditions of safety and health for the entire school community. (English) | |||||||||||||||
Property / summary: This operation consists of replacing the existing asbestos-cement covering the school building of the EB 2+ 3 School of Baolhe Arch, eliminating potentially harmful factors for human health and the environment associated with the existence of asbestos-containing materials in their composition, with the aim of creating better conditions of safety and health for the entire school community. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: This operation consists of replacing the existing asbestos-cement covering the school building of the EB 2+ 3 School of Baolhe Arch, eliminating potentially harmful factors for human health and the environment associated with the existence of asbestos-containing materials in their composition, with the aim of creating better conditions of safety and health for the entire school community. (English) / qualifier | |||||||||||||||
point in time: 29 November 2021
|
Revision as of 16:39, 29 November 2021
Project Q3368620 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | Replacement for asbestos cement coverage of the EB 2+ 3 School of Arch of Baolhe |
Project Q3368620 in Portugal |
Statements
128,881.0 Euro
0 references
128,881.0 Euro
0 references
100.0 percent
0 references
1 January 2021
0 references
30 September 2021
0 references
MUNICIPIO DE CABECEIRAS DE BASTO
0 references
A presente operação consiste na substituição do fibrocimento existente na cobertura do edifÃcio escolar da Escola EB 2+3 de Arco de Baúlhe, eliminando fatores potencialmente prejudiciais para a saúde humana e o ambiente associados à existência de materiais com amianto na sua composição, com o objetivo de criar melhores condições de segurança e de saúde a toda a comunidade escolar. (Portuguese)
0 references
This operation consists of replacing the existing asbestos-cement covering the school building of the EB 2+ 3 School of Baolhe Arch, eliminating potentially harmful factors for human health and the environment associated with the existence of asbestos-containing materials in their composition, with the aim of creating better conditions of safety and health for the entire school community. (English)
29 November 2021
0 references
Cabeceiras de Basto, Ave, Norte
0 references
Identifiers
NORTE-08-5673-FEDER-000256
0 references