DRR CONSTRUCTION OF CYCLING LINKS IN THE MUNICIPALITY OF IVANČNA GORICA (Q3277426): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): L’objectif de l’investissement est la construction de 9,2 km de connexions cyclables dans la municipalité d’Ivančna Gorica (dont 4,2 km ou environ 45 % de la connexion cyclable aura lieu sur la surface cyclable, qui est séparée des zones pour les autres modes de transport, 5,0 km ou environ 55 % sur les routes publiques, où le trafic sera réglementé conformément aux lignes directrices DRR)., translated_summary)
(‎Changed label, description and/or aliases in de: translated_label)
label / delabel / de
 
DRR BAU VON RADVERBINDUNGEN IN DER GEMEINDE IVANČNA GORICA

Revision as of 16:26, 29 November 2021

Project Q3277426 in Slovakia
Language Label Description Also known as
English
DRR CONSTRUCTION OF CYCLING LINKS IN THE MUNICIPALITY OF IVANČNA GORICA
Project Q3277426 in Slovakia

    Statements

    0 references
    1,056,000.0 Euro
    0 references
    1,320,000.0 Euro
    0 references
    80.0 percent
    0 references
    1 December 2017
    0 references
    31 March 2022
    0 references
    OBČINA IVANČNA GORICA
    0 references
    0 references

    45°56'7.08"N, 14°48'24.88"E
    0 references
    1295
    0 references
    Cilj investicije je izgradnja 9,2 km kolesarskih povezav v občini Ivančna Gorica (od tega bo 4,2 km oz. cca 45 % kolesarske povezave potekalo po kolesarski površini, ki je ločena od površin za ostale prometne načine, 5,0 km oz. cca 55 % pa po javnih cestah, kjer bo promet urejen skladno s smernicami DRR). (Slovenian)
    0 references
    The goal of the investment is the construction of 9.2 km of cycling connections in the municipality of Ivančna Gorica (of which 4.2 km or about 45 % of the cycling connection will take place on the cycling surface, which is separated from the areas for other transport modes, 5.0 km or approx. 55 % on public roads, where traffic will be regulated in accordance with the DRR guidelines). (English)
    19 October 2021
    0 references
    L’objectif de l’investissement est la construction de 9,2 km de connexions cyclables dans la municipalité d’Ivančna Gorica (dont 4,2 km ou environ 45 % de la connexion cyclable aura lieu sur la surface cyclable, qui est séparée des zones pour les autres modes de transport, 5,0 km ou environ 55 % sur les routes publiques, où le trafic sera réglementé conformément aux lignes directrices DRR). (French)
    27 November 2021
    0 references

    Identifiers

    OP20.07321
    0 references