Removal from Fibrocement in School Buildings — School School No. 2 of Silvestre (Q3357339): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in en: translated_label)
(‎Created claim: summary (P836): In the intervention, it is intended to replace all the elements in asbestos-cement with panels of profiled sheet covering, with thermal insulation. Drop tubes will be cleared and pine cones will be placed in order to avoid future obstruction of the drop tubes., translated_summary)
Property / summary
 
In the intervention, it is intended to replace all the elements in asbestos-cement with panels of profiled sheet covering, with thermal insulation. Drop tubes will be cleared and pine cones will be placed in order to avoid future obstruction of the drop tubes. (English)
Property / summary: In the intervention, it is intended to replace all the elements in asbestos-cement with panels of profiled sheet covering, with thermal insulation. Drop tubes will be cleared and pine cones will be placed in order to avoid future obstruction of the drop tubes. (English) / rank
 
Normal rank
Property / summary: In the intervention, it is intended to replace all the elements in asbestos-cement with panels of profiled sheet covering, with thermal insulation. Drop tubes will be cleared and pine cones will be placed in order to avoid future obstruction of the drop tubes. (English) / qualifier
 
point in time: 29 November 2021
Timestamp+2021-11-29T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 15:07, 29 November 2021

Project Q3357339 in Portugal
Language Label Description Also known as
English
Removal from Fibrocement in School Buildings — School School No. 2 of Silvestre
Project Q3357339 in Portugal

    Statements

    0 references
    13,244.0 Euro
    0 references
    13,244.0 Euro
    0 references
    100.0 percent
    0 references
    17 December 2020
    0 references
    31 May 2021
    0 references
    MUNICÍPIO DE COIMBRA
    0 references
    Na intervenção pretende-se substituir todos os elementos em fibrocimento por painéis de cobertura de chapa perfilada, com isolamento térmico. Serão desobstruídos os tubos de queda e será colocada pinha para evitar a futura obstrução dos tubos de queda. (Portuguese)
    0 references
    In the intervention, it is intended to replace all the elements in asbestos-cement with panels of profiled sheet covering, with thermal insulation. Drop tubes will be cleared and pine cones will be placed in order to avoid future obstruction of the drop tubes. (English)
    29 November 2021
    0 references
    Coimbra, Região de Coimbra, Centro
    0 references

    Identifiers

    CENTRO-03-5673-FEDER-000246
    0 references