Thermal modernisation of the school group building in the University of Iława (Q132233): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Created claim: summary (P836): The project will be carried out on a building located in a building located on a plot of land with registration number 227 of the Filing system 2, the city of Górowo Iława city. The planned investment involves carrying out a thermal refurbishment of the public building — the school group in the Iława Mountain. The following work is being carried out as part of the thermal modernisation: 1. replacement of windows on the staircase together with a...)
Property / summary
 
The project will be carried out on a building located in a building located on a plot of land with registration number 227 of the Filing system 2, the city of Górowo Iława city. The planned investment involves carrying out a thermal refurbishment of the public building — the school group in the Iława Mountain. The following work is being carried out as part of the thermal modernisation: 1. replacement of windows on the staircase together with a reduction in the surface of the glazing; 2. insulation of external walls; 3. gymnastics gymnastics; 4. replacement of the main entrances to the building; 5. flat roof insulation, new roof construction; The 6th warming of the external wall of the heated cellar. the project will be carried out in one step by the company selected in accordance with the PHP by the Applicant. The project is part of the establishment of the ROP WiM, by meeting the limits and limitations in the implementation of projects, in particular: — The selection of activities and their scope and eligibility of expenditure have been made on the basis of an energy audit — the level of energy efficiency of the project, as measured by the drop in energy demand based on the calculations included in the energy audit, has decreased from 1802 GJ/year to 974 GJ/year. An annual reduction of energy demand of 56.2 %, the reduction in CO2 emissions due to energy renovation is 54.04 %. (English)
Property / summary: The project will be carried out on a building located in a building located on a plot of land with registration number 227 of the Filing system 2, the city of Górowo Iława city. The planned investment involves carrying out a thermal refurbishment of the public building — the school group in the Iława Mountain. The following work is being carried out as part of the thermal modernisation: 1. replacement of windows on the staircase together with a reduction in the surface of the glazing; 2. insulation of external walls; 3. gymnastics gymnastics; 4. replacement of the main entrances to the building; 5. flat roof insulation, new roof construction; The 6th warming of the external wall of the heated cellar. the project will be carried out in one step by the company selected in accordance with the PHP by the Applicant. The project is part of the establishment of the ROP WiM, by meeting the limits and limitations in the implementation of projects, in particular: — The selection of activities and their scope and eligibility of expenditure have been made on the basis of an energy audit — the level of energy efficiency of the project, as measured by the drop in energy demand based on the calculations included in the energy audit, has decreased from 1802 GJ/year to 974 GJ/year. An annual reduction of energy demand of 56.2 %, the reduction in CO2 emissions due to energy renovation is 54.04 %. (English) / rank
 
Normal rank

Revision as of 20:20, 10 March 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Thermal modernisation of the school group building in the University of Iława
Project in Poland financed by DG Regio

    Statements

    0 references
    947,999.33 zloty
    0 references
    227,519.8392 Euro
    13 January 2020
    0 references
    1,284,051.66 zloty
    0 references
    308,172.39839999995 Euro
    13 January 2020
    0 references
    76.5 percent
    0 references
    20 October 2016
    0 references
    9 September 2019
    0 references
    POWIAT BARTOSZYCKI
    0 references

    54°17'19.0"N, 20°29'25.8"E
    0 references
    Przedsięwzięcie realizowane będzie na budynku zlokalizowanym na działce o numerze ewidencyjnym 227 obręb ewidencyjny 2, jednostka ewidencyjna miasto Górowo Iławeckie. Planowana inwestycja polega na przeprowadzeniu termomodernizacji budynku użyteczności publicznej - Zespołu Szkół w Górowie Iławeckim. W ramach termomodernizacji planowanej jest wykonanie następujących prac: 1. wymiana okien na klatce schodowej wraz ze zmniejszeniem powierzchni przeszklenia; 2. ocieplenie ścian zewnętrznych; 3. ocieplenie stropu sali gimnastycznej; 4. wymiana drzwi wejściowych głównych do budynku; 5. docieplenie stropodachu, wykonanie nowej konstrukcji dachu; 6. ocieplenie ściany zewnętrznej ogrzewanej piwnicy. projekt realizowany będzie w jednym etapie przez firmę wyłonioną zgodnie z PZP przez Wnioskodawcę. Projekt wpisuje się w założenia SzOOP RPO WiM poprzez spełnienie limitów i ograniczeń w realizacji projektów, w szczególności: - dobór działań i ich zakres oraz kwalifikowalność wydatków przeprowadzono na podstawie audytu energetycznego - poziom efektywności energetycznej projektu mierzony spadkiem zapotrzebowania na energię na podstawie obliczeń ujętych w audycie energetycznym spadł z 1802 GJ/rok do 974 GJ/rok. Roczne zmniejszenie zapotrzebowania na energię wyniesie 56,2%, - redukcja emisji CO2 na skutek termomodernizacji wynosi 54,04% (Polish)
    0 references
    The project will be carried out on a building located in a building located on a plot of land with registration number 227 of the Filing system 2, the city of Górowo Iława city. The planned investment involves carrying out a thermal refurbishment of the public building — the school group in the Iława Mountain. The following work is being carried out as part of the thermal modernisation: 1. replacement of windows on the staircase together with a reduction in the surface of the glazing; 2. insulation of external walls; 3. gymnastics gymnastics; 4. replacement of the main entrances to the building; 5. flat roof insulation, new roof construction; The 6th warming of the external wall of the heated cellar. the project will be carried out in one step by the company selected in accordance with the PHP by the Applicant. The project is part of the establishment of the ROP WiM, by meeting the limits and limitations in the implementation of projects, in particular: — The selection of activities and their scope and eligibility of expenditure have been made on the basis of an energy audit — the level of energy efficiency of the project, as measured by the drop in energy demand based on the calculations included in the energy audit, has decreased from 1802 GJ/year to 974 GJ/year. An annual reduction of energy demand of 56.2 %, the reduction in CO2 emissions due to energy renovation is 54.04 %. (English)
    0 references

    Identifiers

    RPWM.04.03.01-28-0003/18
    0 references