Reduction of energy intensity BD Counts 22 (Q75348): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Change because item Q214247 was merged with Q4870) |
(Changed label, description and/or aliases in fr: translated_label) |
||
label / fr | label / fr | ||
Réduction de l’intensité énergétique de BD Hrabyně 22 |
Revision as of 01:36, 29 November 2021
Project Q75348 in Czech Republic
Language | Label | Description | Also known as |
---|---|---|---|
English | Reduction of energy intensity BD Counts 22 |
Project Q75348 in Czech Republic |
Statements
169,500.0 Czech koruna
0 references
565,000.0 Czech koruna
0 references
30 percent
0 references
1 September 2016
0 references
30 November 2016
0 references
30 November 2016
0 references
xxx
0 references
74763
0 references
Předmětný objekt vykazuje ve stávajícím stavu vysokou energetickou náročnost, která se odráží ve vysokých provozních nákladech. Cílem projektu je snížení nákladů na vytápění v objektu. Snížení energetické náročnosti bude dosaženo zateplením vnějších obvodových stěn kontaktním zateplovacím systémem (ETICS) s polystyrénem s příměsí grafitu tl. 130 mm. Pokles nákladů bude mít příznivý ekonomický dopad jak na vlastníka objektu tak na nájemce. (Czech)
0 references
The object in question shows a high energy intensity in the current state, which is reflected in high operating costs. The aim of the project is to reduce heating costs in the building. The reduction of energy intensity will be achieved by insulated external circuit walls with a contact heating system (ETICS) with polystyrene with graphite tl added. It’s 130 mm. The decrease in costs will have a positive economic impact on both the owner of the building and the tenants. (English)
23 October 2020
0 references
Identifiers
CZ.06.2.11/0.0/0.0/16_098/0001909
0 references