Insulation of the facade and roof of the SŠGS school building in Nové Pace (Q72557): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Change because item Q214254 was merged with Q4865)
(‎Changed label, description and/or aliases in fr: translated_label)
label / frlabel / fr
 
Isolation de la façade et du toit du bâtiment scolaire SŠGS à Nové Pace

Revision as of 01:02, 29 November 2021

Project Q72557 in Czech Republic
Language Label Description Also known as
English
Insulation of the facade and roof of the SŠGS school building in Nové Pace
Project Q72557 in Czech Republic

    Statements

    0 references
    2,843,173.6 Czech koruna
    0 references
    113,726.94 Euro
    10 January 2020
    0 references
    7,107,934.0 Czech koruna
    0 references
    284,317.36 Euro
    10 January 2020
    0 references
    40 percent
    0 references
    26 May 2017
    0 references
    31 March 2019
    0 references
    Střední škola gastronomie a služeb, Nová Paka, Masarykovo nám. 2
    0 references
    0 references
    0 references

    50°29'21.70"N, 15°30'52.67"E
    0 references
    50901
    0 references
    Předmětem projektu je snížení energetické náročnosti budovy SŠGS Nová Paka na adrese Masarykovo nám. 2, 509 01 Nová Paka. Uživatelem objektu a také žadatelem o podporu je příspěvková organizace Královéhradeckého kraje Střední škola gastronomie a služeb, Nová Paka. V rámci technického řešení rekonstrukce je navrženo kompletní zateplení obálky budovy (fasáda, sokl, střecha), instalace rekuperační jednotky, instalace soustavy LED svítidel a výměna zbývajících původních výplní. (Czech)
    0 references
    The object of the project is to reduce the energy performance of the SŠGS Nová Paka building at Masarykovo nám. 2, 509 01 New Paka. The user of the building and also the applicant for support is the allowance organisation of the Hradec Králové Region High School of Gastronomy and Services, Nová Paka. Within the technical solution of the reconstruction is designed complete insulation of the envelope of the building (fasade, plinth, roof), installation of recovery unit, installation of LED lighting system and replacement of remaining original fillings. (English)
    23 October 2020
    0 references

    Identifiers

    CZ.05.5.18/0.0/0.0/15_019/0001910
    0 references