Reconstruction of track No.1 and 2 Ostrov nad Oslavou – Žďár nad Sázavou (Q72118): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
(‎Changed label, description and/or aliases in fr: translated_label)
label / frlabel / fr
 
Reconstruction des voies nos 1 et 2 Ostrov nad Oslavou — Ž″ár nad Sázavou

Revision as of 00:58, 29 November 2021

Project Q72118 in Czech Republic
Language Label Description Also known as
English
Reconstruction of track No.1 and 2 Ostrov nad Oslavou – Žďár nad Sázavou
Project Q72118 in Czech Republic

    Statements

    0 references
    0 references
    0 references
    762,807,511.07 Czech koruna
    0 references
    30,512,300.44 Euro
    10 January 2020
    0 references
    986,718,638.0 Czech koruna
    0 references
    39,468,745.52 Euro
    10 January 2020
    0 references
    77.31 percent
    0 references
    21 March 2016
    0 references
    20 April 2017
    0 references
    20 April 2017
    0 references
    Správa železniční dopravní cesty, státní organizace
    0 references
    0 references

    50°5'20.22"N, 14°25'13.04"E
    0 references

    50°5'7.01"N, 14°25'23.81"E
    0 references
    11000
    0 references
    Stavba se nachází v km cca 77,526-86,486 trati Brno-Židenice - Havlíčkův Brod. Jedná se o celostátní trať zahrnutou do systému tratí TEN-T. Stavbou bude provedena rekonstrukce a modernizace úseku ve stávající stopě. Území dotčené stavbou má charakter pozemků dráhy se stávající dvoukolejnou trati. Trať prochází územím s polními, lučními i lesními pozemky. Střídavě se těleso dráhy nachází v zářezu a náspu. (Czech)
    0 references
    The construction is located on km 77.526-86.486 of the line Brno-Židenice – Havlíčkův Brod. It is a national line included in the TEN-T line system. Reconstruction and modernisation of the section in the current track will be carried out by the construction. The area concerned by the construction has the character of railway land with an existing double-track line. The line passes through the area with field, meadow and forest land. Alternately, the body of the track is located in the notch and embankment. (English)
    23 October 2020
    0 references

    Identifiers

    CZ.04.1.41/0.0/0.0/15_001/0000019
    0 references