Reconstruction of the primary school building – reconstruction of heating distributions and boiler replacement (Q61732): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Change because item Q199089 was merged with Q4864)
(‎Changed label, description and/or aliases in fr: translated_label)
label / frlabel / fr
 
Reconstruction du bâtiment de l’école primaire — reconstruction de la distribution de chaleur et du remplacement des chaudières

Revision as of 23:05, 28 November 2021

Project Q61732 in Czech Republic
Language Label Description Also known as
English
Reconstruction of the primary school building – reconstruction of heating distributions and boiler replacement
Project Q61732 in Czech Republic

    Statements

    0 references
    494,449.2 Czech koruna
    0 references
    19,777.97 Euro
    10 January 2020
    0 references
    824,082.0 Czech koruna
    0 references
    32,963.28 Euro
    10 January 2020
    0 references
    60 percent
    0 references
    15 June 2017
    0 references
    13 August 2018
    0 references
    30 April 2018
    0 references
    Obec Bulovka
    0 references
    0 references
    0 references

    50°55'29.35"N, 15°5'36.96"E
    0 references
    46401
    0 references
    Výměna stávajícího kotle na tuhá paliva za moderní automatický kotel na pevná paliva splňující požadavky na ekodesign. Instalace regulace PID pro modulaci výkonu v daném rozsahu na zdroji tepla. Instalace prostorových termostatů do jednotlivých zón topných úseků. Rekonstrukce stávajících rozvodů topné vody . Instalace termostatických ventilů s hlavicemi a regulačním šroubením na jednotlivá otopná tělesa a hydraulické vyvážení otopné soustavy.č.p.156, p.č. 133 (Czech)
    0 references
    Replacing the existing solid fuel boiler with a modern automatic solid fuel boiler meeting ecodesign requirements. Installation of PID regulation for modulating power in a given range on the heat source. Installation of spatial thermostats into individual zones of heating sections. Reconstruction of existing heating water distribution systems. Installation of thermostatic valves with heads and control fittings on individual heating elements and hydraulic balance of the heating system.no.p.156, p. no. 133 (English)
    23 October 2020
    0 references

    Identifiers

    CZ.05.2.32/0.0/0.0/15_008/0001014
    0 references