Sand – hot water East (Q19003): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Change because item Q214250 was merged with Q4860) |
(Changed label, description and/or aliases in fr: translated_label) |
||
label / fr | label / fr | ||
Sable — eau chaude Est |
Revision as of 19:11, 28 November 2021
Project Q19003 in Czech Republic
Language | Label | Description | Also known as |
---|---|---|---|
English | Sand – hot water East |
Project Q19003 in Czech Republic |
Statements
19,608,830.5 Czech koruna
0 references
65,362,768.11 Czech koruna
0 references
30.0 percent
0 references
12 December 2016
0 references
27 November 2018
0 references
30 November 2018
0 references
Teplárna Písek, a.s.
0 references
39701
0 references
Účelem výše uvedené stavby je přechod z parního zásobování teplem na horkovodní v oblasti sídliště Jih, Dr. Horákové, Čapkova, Za Kapličkou a Amerika II. Oblast bude zásobována teplem z nového horkovodního rozvodu , v systému dvoutrubkového předizolovaného potrubí uloženém volně v zemní rýze v trase stávajícího parovodního nebo sekundárního tepelného kanálu. Nový horkovod nahradí současný parovod, budou potřeby úpravy technologie ve stávajících stanicích a montáž nových stanic . a. (Czech)
0 references
The purpose of the above construction is the transition from steam supply to hot water in the area of housing estates South, Dr. Horáková, Čapkova, Za Kaplička and America II. The area will be supplied with heat from the new hot water distribution system, in a two-tube pre-insulated pipeline system stored freely in the ground rice route of the existing steam or secondary heat channel. The new hot water pipeline will replace the current steam pipeline, the need to modify the technology in existing stations and the installation of new stations. a. (English)
22 October 2020
0 references
Identifiers
CZ.01.3.15/0.0/0.0/15_025/0006057
0 references