Reducing the energy intensity of the production of KOPOS KOLIN (Q15780): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Change because item Q214255 was merged with Q4859) |
(Changed label, description and/or aliases in fr: translated_label) |
||
label / fr | label / fr | ||
Réduction de l’intensité énergétique de la production KOPOS KOLÍN |
Revision as of 18:28, 28 November 2021
Project Q15780 in Czech Republic
Language | Label | Description | Also known as |
---|---|---|---|
English | Reducing the energy intensity of the production of KOPOS KOLIN |
Project Q15780 in Czech Republic |
Statements
16,546,089.3 Czech koruna
0 references
55,153,631.0 Czech koruna
0 references
30 percent
0 references
31 January 2017
0 references
31 December 2018
0 references
31 March 2019
0 references
KOPOS KOLÍN a.s.
0 references
28002
0 references
Předmětem projektu je zajištění jednak účinného, ekologického a energeticky úsporného výrobního procesu společnosti KOPOS KOLÍN (dotčené části výrobních technologií) se současným omezením tepelných ztrát výrobního objektu jeho zateplením, jednak zajištění úspor spotřeby elektrické energie instalací úsporných světelných zdrojů a zavedení ohřevu vody prostřednictvím využití obnovitelných zdrojů energie. Projekt bude realizován od 1. 8. 2017 do 30. 12. 2019 kompetentním projektovým týmem. a. (Czech)
0 references
The object of the project is to ensure both an efficient, ecological and energy-saving production process of KOPOS KOLÍN (the parts of production technologies concerned) with the current reduction of the thermal losses of the production building by its insulation, and ensuring savings in electricity consumption by installing energy-saving lamps and introducing water heating through the use of renewable energy sources. The project will be implemented from 1. 8. 2017 to 30. 12. 2019 competent project team. a. (English)
22 October 2020
0 references
Identifiers
CZ.01.3.10/0.0/0.0/16_061/0009028
0 references