Creation of an alternative transit route for the TEN-T network in Ventspils (Q3057589): Difference between revisions
Jump to navigation
Jump to search
(Created claim: summary (P836): Das Projekt „Errichtung einer alternativen Transitroute zum TEN-V-Netz in Ventspils“ (Projekt) zielt darauf ab, die Unterbrechung der hochwertigen Verkehrsinfrastruktur in der Stadt Ventspils zu verhindern und eine alternative Route für den Transit- und Frachttransport zu schaffen, die sie zumindest teilweise von den öffentlichen Verkehrsmitteln trennt und sie von dicht besiedelten Teilen der Stadt Ventspils verlagert. Das Projekt umfasst 0,3873...) |
(Changed label, description and/or aliases in nl: translated_label) |
||
label / nl | label / nl | ||
Ontwikkeling van een alternatieve doorvoerroute voor het TEN-T-netwerk in Ventspils |
Revision as of 18:12, 28 November 2021
Project Q3057589 in Latvia
Language | Label | Description | Also known as |
---|---|---|---|
English | Creation of an alternative transit route for the TEN-T network in Ventspils |
Project Q3057589 in Latvia |
Statements
5,199,336.34 Euro
0 references
6,116,866.28 Euro
0 references
85.0 percent
0 references
14 July 2017
0 references
31 December 2020
0 references
Ventspils pilsētas pašvaldības iestāde "Komunālā pārvalde"
0 references
Projekta “Alternatīva tranzītmaršruta izveide TEN-T tīklam Ventspilī” (Projekts) mērķis ir novērstkvalitatīvas transporta infrastruktūras pārrāvumu Ventspils pilsētā un radīt alternatīvu maršrutu tranzīta unkravas transportam, vismaz daļēji atdalot to no sabiedriskā transporta plūsmām un novirzot no blīvākapdzīvotām Ventspils pilsētas daļām.Projektā iekļauta 0,3873 km Mazās Kurzemes ielas, 2,3363 km Robežu ielas pārbūve posmā no I.Mičurina ielai līdz Packules upes tiltam, 0,802 km Robežu ielas pārbūve posmā no Packules upes tilta līdz Packules ielai, veicot arī ietvju un veloceliņa (Robežu), apgaismojuma, inteliģentās transporta vadības sistēmas elementu un lietus ūdenskanalizācijas izbūvi. Paredzēta rotācijas apļa izbūve Mazās Kurzemes un Kurzemes ielu krustojumā.Kopējās un attiecināmās Projekta izmaksas 6 323 774,78 EUR. Plānots, ka 85% no attiecināmajāmizmaksām, jeb 5 375 208,56 EUR segs Kohēzijas fonds (KF), 758 852,97 EUR jeb 12% nodrošinās Ventspils pilsētas pašvaldība, bet valsts budžeta dotācija veido 3% no attiecināmajām izmaksām jeb 189 713,25 EUR.Projektu plānots ieviest no 2017. gada 14. jūlija līdz 2020. gada 31.decembrim.Projekta ieviešanu nodrošinās Ventspils pilsētas pašvaldības iestāde „Komunālā pārvalde” (PI “Komunālāpārvalde”).Projekta sociāli-ekonomiskā ienesīguma norma (ERR/C) ir 14,93%, kas apliecina Projekta kopējoizdevīgumu sabiedrībai kopumā.Visi ielu posmi, kuros plānoti ieguldījumi Projekta ietvaros, ir kravu transporta maršruti un atrodasVentspils pilsētas administratīvajā teritorijā. (Latvian)
0 references
The aim of the project “Development of alternative transit route for TEN-T network in Ventspils” (Project) is to prevent a breakdown of high-quality transport infrastructure in Ventspils city and create an alternative route for transit and cargo transport by at least partially separating it from public transport streams and diverting from densely populated sections of Ventspils city.The project includes 0.3873 km Small Kurzemes street, 2.3363 km Border street rebuilding from I.Mičurina street to a water control section of the riverside section. Total and attributable Project costs EUR 6323774,78. 85 % of eligible costs or EUR 5375208,56 will be covered by the Cohesion Fund (CF), EUR 758852,97 or 12 % will be provided by Ventspils City Municipality, but the state budget grant is 3 % of the eligible costs or EUR 189713,25.The project is planned to be implemented from 14 July 2017 to 31 December 2020.The project will be implemented from 14 July 2017 to 31 December 2020.The project implementation will be provided by the Municipality of Ventspils City Council (in which the project is to be implemented in the territory of the Municipality), and the project is to be implemented from 14 July 2017 until 31 December 2020.The overall project implementation will be provided by Ventspils City Municipality.The project is to be implemented in the territory of the Project “The project is to be carried out by the Municipality of Ventspils City Council” (in which the project is to be carried out by the Municipality of Ventspils). (English)
15 July 2021
0 references
Le projet «Établissement d’une voie de transit alternative au réseau RTE-T à Ventspils» (projet) vise à prévenir la perturbation des infrastructures de transport de haute qualité dans la ville de Ventspils et à créer un itinéraire alternatif pour le transport de marchandises et de transit, en les séparant au moins partiellement des flux de transport public et en les déplaçant des zones densément peuplées de Ventspils. La construction d’un cercle de rotation à la jonction des rues Mazās Kurzemes et Kurzemes est envisagée. Les coûts totaux et éligibles du projet 6 323 774,78 EUR. Il est prévu que 85 % des coûts éligibles, soit 5 375 208,56 EUR, seront couverts par le Fonds de cohésion (FC), 758 852,97 EUR ou 12 % seront fournis par la municipalité de Ventspils, tandis que la subvention du budget de l’État s’élèvera à 3 % des coûts éligibles ou 189713, le projet devrait être mis en œuvre du 14 juillet 2017 au 31 décembre 2020. La mise en œuvre du projet sera assurée par l’autorité municipale Ventspils. (French)
25 November 2021
0 references
Das Projekt „Errichtung einer alternativen Transitroute zum TEN-V-Netz in Ventspils“ (Projekt) zielt darauf ab, die Unterbrechung der hochwertigen Verkehrsinfrastruktur in der Stadt Ventspils zu verhindern und eine alternative Route für den Transit- und Frachttransport zu schaffen, die sie zumindest teilweise von den öffentlichen Verkehrsmitteln trennt und sie von dicht besiedelten Teilen der Stadt Ventspils verlagert. Das Projekt umfasst 0,3873 km von der Mazās Kurzemes Straße, 2,3363 km der Grenzstraße im Abschnitt I.Mičurina Straße zur Packule River Bridge, 0,82 km von der Grenzstraße im Abschnitt von Packules Kurzemes, 2,3363 km der Grenzstraße, von der I.Mičurina Straße zur Packule River Bridge, 0,82 km von der Grenzstraße im Abschnitt von Packule und von der Straßensteuerung. Der Bau eines Rotationskreises an der Kreuzung von Mazās Kurzemes und Kurzemes Streets ist geplant. Insgesamt und zuschussfähig sind 6 323 774,78 EUR. Es ist geplant, dass 85 % der förderfähigen Kosten, d. h. 5 375 208,56 EUR aus dem Kohäsionsfonds (KF), 758 852,97 EUR oder 12 % von Ventspils City Municipality bereitgestellt werden, während der Staatshaushalt 3 % der förderfähigen Kosten oder 189713 beträgt. (German)
28 November 2021
0 references
Mazā Kurzemes iela, Ventspils
0 references
Mazā Kurzemes iela, Ventspils
0 references
Robežu iela, Ventspils
0 references
Robežu iela, Ventspils
0 references
Robežu iela, Ventspils
0 references
Robežu iela, Ventspils
0 references
Robežu iela, Ventspils
0 references
Identifiers
6.1.4.2/17/I/003
0 references