Arāja polder protective dam D-1, pik.00/00-46/84 and D-2, pik. 00/00-42/29 renewal in Otaņķu municipality, Nīcas novads (Q3057338): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): L’objectif du projet est de réduire les risques d’inondation dans la paroisse d’Otan’u, d’accroître la sécurité des habitants de la paroisse, contribuant ainsi au développement des affaires sur le territoire et à l’amélioration de la qualité de vie des habitants du territoire polder. Y compris la conception, les travaux de construction, la supervision de la construction, la supervision de l’auteur et la gestion de projet. Grâce à ce projet, les...)
(‎Changed label, description and/or aliases in de: translated_label)
label / delabel / de
 
Arya Polder Schutzdämme D-1, pic.00/00-46/84 und D-2, Bild. 00/00-42/29 Renovierung in der Pfarrei Otaņū, Region Nīca

Revision as of 09:37, 28 November 2021

Project Q3057338 in Latvia
Language Label Description Also known as
English
Arāja polder protective dam D-1, pik.00/00-46/84 and D-2, pik. 00/00-42/29 renewal in Otaņķu municipality, Nīcas novads
Project Q3057338 in Latvia

    Statements

    0 references
    0 references
    596,009.68 Euro
    0 references
    701,187.86 Euro
    0 references
    85.0 percent
    0 references
    17 May 2017
    0 references
    16 October 2018
    0 references
    Valsts sabiedrība ar ierobežotu atbildību "Zemkopības ministrijas nekustamie īpašumi"
    0 references
    0 references

    56°30'2.74"N, 21°1'18.77"E
    0 references
    Projekta mērķis ir samazināt plūdu apdraudējumu Otaņķu pagastā, palielināt pagasta iedzīvotāju drošību, tādējādi veicinot uzņēmējdarbības attīstību teritorijā un uzlabojot iedzīvotāju dzīves kvalitāti poldera teritorijā.Projekta galvenās darbības ir Arāja poldera aizsargdambju D-1 un D-2 Otaņķu pagastā, Nīcas novadā atjaunošana. Tai skaitā projektēšana, būvdarbu veikšana, būvuzraudzība, autoruzraudzība un projekta vadība. Projekta izpildes rezultātā tiks atjaunoti Arāja poldera aizsargdambji D-1 un D-2, samazinot plūdu draudus plūdu draudu skartajā 190,69 ha Otaņķu pagasta teritorijā. Pēc projekta īstenošanas tiks palielināta dabas teritoriju vērtība, pievilcīgums un nodrošināta produktīva teritorijas izmantošana. Projekta īstenošanas kopējās izmaksas ir 955750,05 EUR, no kuriem ERAF atbalsta apjoms ir 85% jeb 812387,54 EUR. Projekta īstenošanu plānots uzsākt 2017. gada maijā un pabeigt 2018. gada oktobrī. Projekta atbalstāmās darbības - būvdarbu projektēšana ir uzsākta 2016. gada augustā pirms līguma par projekta īstenošanu parakstīšanu. (Latvian)
    0 references
    The aim of the project is to reduce flood risk in Otaņķu parish, to increase security of inhabitants of the parish, thus promoting business development in the territory and improving the quality of life of inhabitants in polder territory.The main activities of the project are Arāja poldera protective dabju D-1 and D-2 in Otaņķu municipality, Nica municipality. This includes designing, execution of construction works, construction supervision, author supervision and project management. As a result of the project Arāja polder’s protective dam D-1 and D-2 will be restored, reducing the risk of flooding in the affected area of 190,69 ha of Ottanki parish. After the implementation of the project, the value, attractiveness and productive use of the territory will be increased. The total cost of project implementation is EUR 955750,05, of which ERDF support amount is 85 % or EUR 812387,54. Project implementation is planned to start in May 2017 and finish in October 2018. The project’s supported activities – construction works were started in August 2016 before the signing of the contract for the implementation of the project. (English)
    15 July 2021
    0 references
    L’objectif du projet est de réduire les risques d’inondation dans la paroisse d’Otan’u, d’accroître la sécurité des habitants de la paroisse, contribuant ainsi au développement des affaires sur le territoire et à l’amélioration de la qualité de vie des habitants du territoire polder. Y compris la conception, les travaux de construction, la supervision de la construction, la supervision de l’auteur et la gestion de projet. Grâce à ce projet, les barrages de protection D-1 et D-2 d’Arja polder seront restaurés, ce qui réduira le risque d’inondation sur le territoire de la paroisse de 190,69 ha d’Ota Après la mise en œuvre du projet, la valeur, l’attractivité et l’utilisation productive du site seront accrues. Le coût total de la mise en œuvre du projet s’élève à 955 750,05 EUR, dont le montant du soutien du FEDER s’élève à 85 %, soit 812 387,54 EUR. La mise en œuvre du projet devrait débuter en mai 2017 et s’achever en octobre 2018. Activités soutenues par le projet — la conception des travaux de construction a débuté en août 2016 avant la signature du contrat de mise en œuvre du projet. (French)
    25 November 2021
    0 references
    Otaņķu pag., Dienvidkurzemes nov.
    0 references
    Otaņķu pag., Dienvidkurzemes nov.
    0 references
    Otaņķu pag., Dienvidkurzemes nov.
    0 references
    Otaņķu pag., Dienvidkurzemes nov.
    0 references
    Otaņķu pag., Dienvidkurzemes nov.
    0 references
    Otaņķu pag., Dienvidkurzemes nov.
    0 references
    Otaņķu pag., Dienvidkurzemes nov.
    0 references
    Otaņķu pag., Dienvidkurzemes nov.
    0 references
    Otaņķu pag., Dienvidkurzemes nov.
    0 references
    Otaņķu pag., Dienvidkurzemes nov.
    0 references
    Otaņķu pag., Dienvidkurzemes nov.
    0 references
    Otaņķu pag., Dienvidkurzemes nov.
    0 references
    Otaņķu pag., Dienvidkurzemes nov.
    0 references

    Identifiers

    5.1.2.0/17/I/003
    0 references