Implementation of Energy Efficiency Improvement Measures for Daugava Stadium Stadium Building Augssels 1, Riga (Q3057045): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): Objectif du projet: Amélioration de l’efficacité énergétique du bâtiment dans la rue supérieure 1, Riga en assurant l’isolation des murs extérieurs et des divisions du bâtiment, le remplacement des fenêtres existantes, l’installation d’un nouveau système de contrôle du climat et la création d’un système de chauffage, améliorant ainsi l’amélioration des performances techniques thermiques, réduisant la perte de chaleur du bâtiment. Remplacer l’écl...)
(‎Changed label, description and/or aliases in de: translated_label)
label / delabel / de
 
Umsetzung von Maßnahmen zur Verbesserung der Energieeffizienz im Stadiongebäude Daugava in Augšiel 1, Riga

Revision as of 09:33, 28 November 2021

Project Q3057045 in Latvia
Language Label Description Also known as
English
Implementation of Energy Efficiency Improvement Measures for Daugava Stadium Stadium Building Augssels 1, Riga
Project Q3057045 in Latvia

    Statements

    0 references
    0 references
    890,120.0 Euro
    0 references
    1,047,200.0 Euro
    0 references
    85.0 percent
    0 references
    5 February 2021
    0 references
    4 May 2021
    0 references
    Valsts sabiedrība ar ierobežotu atbildību "Kultūras un sporta centrs "Daugavas stadions""
    0 references
    0 references

    56°57'16.96"N, 24°9'21.82"E
    0 references
    Projekta mērķis: VSIA "Kultūras un sporta centrs "Daugavas stadions"" ēkai Augšielā 1, Rīgā energoefektivitātes paaugstināšana, nodrošinot ēkas ārsienu un pārsegumu siltināšanu, esošo logu nomaiņa, jaunas klimata kontroles sistēmas ierīkošana un apkures sistēmas izveide, tādējādi uzlabojot siltumtehnisko rādītāju uzlabošanos, samazinot ēkas siltumu zudumus. Esošā apgaismojuma nomaiņa telpās pret energoefektīvu apgaismojumu, tādējādi samazinot enerģijas patēriņu. Lai nodrošinātu 2018.gada 4.janvāra Ministru kabineta noteikumos Nr.13 "Darbības programmas "Izaugsme un nodarbinātība" 4.2.1. specifiskā atbalsta mērķa "Veicināt energoefektivitātes paaugstināšanu valsts un dzīvojamās ēkās" 4.2.1.2. pasākuma "Veicināt energoefektivitātes paaugstināšanu valsts ēkās" otrās projektu iesniegumu atlases kārtas īstenošanas noteikumi" noteiktā specifiskā mērķa sasniegšanu, VISA "Kultūras un sporta centrs "Daugavas stadions"" plāno veikt šādus būvdarbus:- ēkas ārsienu siltināšana;- pārsegumu siltināšana;- esošo logu nomaiņa;- veco ieejas mezglu nomaiņa;- jaunas klimata kontroles sistēmas ierīkošana;- esošā apgaismojuma nomaiņa;- grīdas siltināšana;- jaunas apkures sistēmas izveide ēkā.Projekta ietvaros plānotās darbības ir tieši vērstas uz mērķa sasniegšanu, tādējādi palielinot ēkas ilgmūžību un ēkas ekspluatācijas laiku.Projekta īstenošanas vieta: Augšielā 1, Rīgā.Projekta ilgums: trīs mēneši no projekta līguma noslēgšanas. Ar projekta iesnieguma sagatavošanu saistītās darbības uzsāktas 2017.gada 2.ceturksni, kad tika veikts ēkas tehniskās apsekošanas atzinums un energoaudits.Projekta kopējās attiecināmās izmaksas ir 1 047 200,00 EUR, t.sk.- Eiropas Reģionālās attīstības fonda finansējums - 890 120,00 EUR;- attiecināmais valsts budžeta finansējums - 157 080,00 EUR.Plānotie rezultāti: - siltumenerģijas ietaupījums pēc projekta īstenošanas būs ne mazāks kā 44,24% gadā no ēkas energosertifikātā aprēķinātā siltumenerģijas patēriņa pirms projekta īstenošanas;- siltumenerģijas patēriņš apkurei pēc projekta īstenošanas, pamatojoties uz ēkas energosertifikātā veiktajiem aprēķiniem un projekta tehniskajā dokumentācijā paredzētajiem būvdarbiem nepārsniegs 49,58 kWh/m2 gadā; - primārās enerģijas gada patēriņa samazinājums - 428,14 MWh/gadā;- aprēķinātais siltumnīcefekta gāzu samazinājums - 90,75 CO2 ekvivalenta tonnas gadā. (Latvian)
    0 references
    The aim of the project shall be: Improvement of energy efficiency of the building "Culture and sports centre "Daugavas Stadium" in Augshiel 1, Riga, ensuring insulation of exterior walls and divisions of the building, replacement of existing windows, installation of a new climate control system and creation of a heating system, thus improving the improvement of thermal performance and reducing heat losses of the building. Replacing existing indoor lighting with energy-efficient lighting, thereby reducing energy consumption. In order to ensure the achievement of specific objective of 4.2.1 of the specific support objective “To promote energy efficiency in public and residential buildings” of the Regulations of the Cabinet of Ministers of 4 January 2018 No.13 “To promote energy efficiency in public buildings” 4.2.1.2 “Promotion of energy efficiency improvement in public buildings” implementing rules of the second project application set out in the second project programme “To promote energy efficiency in public buildings” to achieve the specific objective of VISA “Cultural and Sports Centre”Daugava Stadium“” is planned to perform the following construction works:- building external wall insulation and implementation of the building-design-provision-existence-existence; changing of the existing heating system in the framework of the new building. Upchilles 1, Riga. Duration of the project: Three months from the conclusion of the project contract. The project’s total eligible costs are EUR 1047200,00, incl. – European Regional Development Fund funding – EUR 890120,00; – eligible state budget funding – EUR 157080,00.Project’s total eligible costs are EUR 1047200,00, incl. – European Regional Development Fund funding – EUR 890120,00; – eligible state budget funding – EUR 157080,00. — the heat savings after project implementation will not be less than 44.24 % of the annual heat consumption calculated in the energy certificate of the building before the project implementation;- heat consumption for heating after project implementation, based on the calculations in the energy certificate of the building and construction works foreseen in the technical design documentation, will not exceed 49,58 kWh/m² per year; A reduction in annual primary energy consumption of 428,14 MWh/year;- the estimated greenhouse gas reduction of 90.75 CO2 equivalent tons per year. (English)
    15 July 2021
    0 references
    Objectif du projet: Amélioration de l’efficacité énergétique du bâtiment dans la rue supérieure 1, Riga en assurant l’isolation des murs extérieurs et des divisions du bâtiment, le remplacement des fenêtres existantes, l’installation d’un nouveau système de contrôle du climat et la création d’un système de chauffage, améliorant ainsi l’amélioration des performances techniques thermiques, réduisant la perte de chaleur du bâtiment. Remplacer l’éclairage existant dans les locaux par un éclairage économe en énergie, réduisant ainsi la consommation d’énergie. Afin d’assurer la réalisation de l’objectif spécifique énoncé dans le règlement no 13 du Conseil des ministres du 4 janvier 2018 «Promouvoir la mise en œuvre de la deuxième série d’applications de projets du programme opérationnel»Croissance et emploi«objectif d’appui spécifique 4.2.1»Promouvoir l’amélioration de l’efficacité énergétique dans les bâtiments d’État et les bâtiments résidentiels«, VISA»Centre Culture et Sport «Daugavas Stadium» prévoit d’effectuer les travaux de construction suivants:- isolation des murs extérieurs du bâtiment;- isolation des divisions;- remplacement des fenêtres existantes;- remplacement des anciens nœuds d’entrée;- installation d’un nouveau système de climatisation;- remplacement de l’éclairage existant;- isolation des planchers;- création d’un nouveau système de chauffage dans le bâtiment.Les activités prévues dans le projet visent directement à atteindre l’objectif, augmentant ainsi la longévité du bâtiment et la durée de vie du bâtiment.Le site de mise en œuvre du projet: Upper Street 1, Riga.Durée du projet: trois mois à compter de la conclusion du contrat de projet. Les activités liées à la préparation de la demande de projet ont été lancées au deuxième trimestre 2017, lorsque l’avis de l’inspection technique du bâtiment et de l’audit énergétique a été réalisé.Le total des coûts éligibles du projet s’élève à 1 047 200,00 EUR, y compris le financement du Fonds européen de développement régional — 890 120,00 EUR;- le financement éligible du budget de l’État — 157 080,00 EUR.Résultats prévus: — les économies d’énergie thermique après la mise en œuvre du projet ne seront pas inférieures à 44,24 % par an de la consommation de chaleur calculée dans le certificat énergétique du bâtiment avant la réalisation du projet;- la consommation d’énergie thermique pour le chauffage après la mise en œuvre du projet, sur la base des calculs effectués dans le certificat énergétique du bâtiment et des travaux de construction prévus dans la documentation technique du projet, ne dépassera pas 49,58 kWh/m² par an; — réduction de la consommation annuelle d’énergie primaire — 428,14 MWh/an;- réduction calculée des gaz à effet de serre de 90,75 tonnes d’équivalent CO2 par an. (French)
    25 November 2021
    0 references
    Augšiela 1, Rīga, LV-1009
    0 references

    Identifiers

    4.2.1.2/19/I/030
    0 references