D1 For ov, west For ov, south (Q3102572): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): 1. The aim of the project is to complete the basic motorway D1, improve conditions for international and national traffic and increase fluidity, capacity, speed and road safety. After the completion of the construction of the section D1 in the length of 7.87 km, conditions will be created for a substantial reduction of traffic on road I/68 and road I/18 (deviation of transit freight and passenger traffic from the city of Prešov).2. The activitie...)
(‎Changed label, description and/or aliases in fr: translated_label)
label / frlabel / fr
 
D1 Presov, Ouest — Prešov, Sud

Revision as of 13:40, 27 November 2021

Project Q3102572 in Slovakia
Language Label Description Also known as
English
D1 For ov, west For ov, south
Project Q3102572 in Slovakia

    Statements

    0 references
    278,317,478.82 Euro
    0 references
    327,432,328.02 Euro
    0 references
    85.0 percent
    0 references
    1 June 2017
    0 references
    1 December 2022
    0 references
    Národná diaľničná spoločnosť, a.s.
    0 references
    0 references
    0 references

    48°9'32.98"N, 17°3'6.62"E
    0 references
    1. Cieľom projektu je dobudovanie základného diaľničného ťahu D1, skvalitniť podmienky pre medzinárodnú a vnútroštátnu dopravu a zvýšiť plynulosť, kapacitu, rýchlosť a zároveň bezpečnosť cestnej premávky. Po ukončení výstavby predmetného úseku D1 v dĺžke 7,87 km sa vytvoria podmienky k podstatnému odľahčeniu dopravy na ceste I/68 a ceste I/18 (odklon tranzitnej nákladnej aj osobnej dopravy z intravilánu mesta Prešov).2. Aktivity projektu sú zamerané na výstavbu diaľnic a rýchlostných ciest vrátane privádzačov (TEN-T CORE) s cieľom odstránenia kľúčových úzkych miest na cestnej infraštruktúre TEN-T prostredníctvom výstavby nových úsekov diaľnic a rýchlostných ciest.3. Miesto realizácie projektu je v Prešovskom kraji, v okrese Prešov. Diaľnica D1 je súčasťou TEN-T Core siete, pričom plní významnú vnútroštátnu ako aj medzinárodnú dopravnú funkciu.4. Merateľnými ukazovateľmi predmetného projektu sú:Celková dĺžka novovybudovaných ciest v sieti TEN-T (CORE) – 7 870 m.Úspora času v cestnej doprave na diaľniciach a rýchlostných cestách – 34 515 715  eur.Úspora produkcie emisií NO2 (vplyvom výstavby diaľnic) – 10 ton.Úspora produkcie emisií PM10 (vplyvom výstavby diaľnic) – 2,4 ton.5. Základné údaje o stavbe:Dĺžka komunikácie:                          7 870 mKategória komunikácie:                   D 26,5/100Návrhová rýchlosť:                           100 km/hodDĺžka tunela:                                      2 244 mKategória tunela:                              2 x T 7,5Počet križovatiek:                             2 – mimoúrovňová križovatka Prešov západ, mimoúrovňová križovatka Prešov JuhPočet mostných objektov:              18Celkový počet vetiev križovatiek:    17Súčasťou stavby je stredisko správy a údržby diaľnice – SSÚD Prešov (Slovak)
    0 references
    1. The aim of the project is to complete the basic motorway D1, improve conditions for international and national traffic and increase fluidity, capacity, speed and road safety. After the completion of the construction of the section D1 in the length of 7.87 km, conditions will be created for a substantial reduction of traffic on road I/68 and road I/18 (deviation of transit freight and passenger traffic from the city of Prešov).2. The activities of the project focus on the construction of motorways and expressways, including feeders (TEN-T CORE), with the aim of removing key bottlenecks on the TEN-T road infrastructure through the construction of new sections of motorways and expressways.3. The place of implementation of the project is in Prešov region, district Prešov. The D1 motorway is part of the TEN-T Core network with an important national as well as international transport function.4. Measurable indicators of the project in question sú:Celková length of newly built roads on the TEN-T network (CORE) – 7870 m.Saving time in road transport on motorways and expressways – EUR 34 515 715.Saving of NO2 emissions (impact of construction of motorways) – 10 tonnes.Saving emissions of PM10 (impact of construction of motorways) – 2.4 tonnes.5. Basic data on stavbe:Dĺžka communication:                          7 870 mCategory of communication:                   D 26,5/100Design speed:                           100 km/hourTunnel length:                                      2 244 mTunnel category:                              2 x T 7,5Number of crossings:                             2 – non-level crossing Prešov west, non-level crossing Prešov JuhNumber of bridge objects:              18Total number of intersection branches:    17The building is a highway management and maintenance centre – SSÚD Prešov (English)
    28 September 2021
    0 references

    Identifiers

    311021Q625
    0 references