RESERV 2019 — Petrič 1 and 2 (Q3277438): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in fr: translated_label)
(‎Created claim: summary (P836): L’objectif de l’investissement est de deux centrales solaires d’une taille de 200,265 kW et 80,85 kW, d’une puissance nominale totale de 280,845 kW, qui seront installées à Goriška cesta 57 et Goriška cesta 68, Ajdovščina., translated_summary)
Property / summary
 
L’objectif de l’investissement est de deux centrales solaires d’une taille de 200,265 kW et 80,85 kW, d’une puissance nominale totale de 280,845 kW, qui seront installées à Goriška cesta 57 et Goriška cesta 68, Ajdovščina. (French)
Property / summary: L’objectif de l’investissement est de deux centrales solaires d’une taille de 200,265 kW et 80,85 kW, d’une puissance nominale totale de 280,845 kW, qui seront installées à Goriška cesta 57 et Goriška cesta 68, Ajdovščina. (French) / rank
 
Normal rank
Property / summary: L’objectif de l’investissement est de deux centrales solaires d’une taille de 200,265 kW et 80,85 kW, d’une puissance nominale totale de 280,845 kW, qui seront installées à Goriška cesta 57 et Goriška cesta 68, Ajdovščina. (French) / qualifier
 
point in time: 27 November 2021
Timestamp+2021-11-27T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 13:38, 27 November 2021

Project Q3277438 in Slovakia
Language Label Description Also known as
English
RESERV 2019 — Petrič 1 and 2
Project Q3277438 in Slovakia

    Statements

    0 references
    42,770.7 Euro
    0 references
    42,770.7 Euro
    0 references
    100.0 percent
    0 references
    24 September 2020
    0 references
    31 December 2021
    0 references
    PETRIČ D.O.O.
    0 references
    0 references
    0 references

    45°53'28.61"N, 13°53'57.23"E
    0 references
    5270
    0 references
    Predmet investicije sta dve sončni elektrarni velikosti 200,265 kW in 80,85 kW, skupaj nazivne moči 280,845 kW, ki bosta nameščeni na lokacijah Goriška cesta 57 in Goriška cesta 68, Ajdovščina. (Slovenian)
    0 references
    The object of the investment is two solar power plants with a size of 200.265 kW and 80.85 kW, with a total rated power of 280.845 kW, which will be installed at Goriška cesta 57 and Goriška cesta 68, Ajdovščina. (English)
    19 October 2021
    0 references
    L’objectif de l’investissement est de deux centrales solaires d’une taille de 200,265 kW et 80,85 kW, d’une puissance nominale totale de 280,845 kW, qui seront installées à Goriška cesta 57 et Goriška cesta 68, Ajdovščina. (French)
    27 November 2021
    0 references