Modernisation and reconstruction of the transfer node on Masarykova Street in Pre ova (Presidency Space) (Q3100796): Difference between revisions
Jump to navigation
Jump to search
(Created claim: summary (P836): The subject of the project is the modernisation of the transfer node on Masaryk Street in Prešov. From the point of view of public transport, this is the key and most frequent transfer point in the city and in the region. Three modes of transport meet here, namely public transport, bus transport and rail transport. Urban public transport has two stops, which are essential on the carrier track of public transport. There are 4 trolleybus lines and...) |
(Changed label, description and/or aliases in fr: translated_label) |
||
label / fr | label / fr | ||
Modernisation et reconstruction du nœud de transfert sur la rue Masaryk à Prešov (Espace de la présidence) |
Revision as of 12:58, 27 November 2021
Project Q3100796 in Slovakia
Language | Label | Description | Also known as |
---|---|---|---|
English | Modernisation and reconstruction of the transfer node on Masarykova Street in Pre ova (Presidency Space) |
Project Q3100796 in Slovakia |
Statements
1,623,188.09 Euro
0 references
1,909,633.05 Euro
0 references
85.0 percent
0 references
1 February 2017
0 references
1 December 2020
0 references
Mesto Prešov
0 references
Q3120112 (Deleted Item)
0 references
Predmetom realizácie projektu je modernizácia prestupného uzla na Masarykovej ulici v Prešove. Z hľadiska verejnej dopravy sa jedná o kľúčový a najfrekventovanejší prestupný bod v meste a v kraji. Stretávajú sa tu tri dopravné módy a to mestská hromadná doprava, autobusová doprava a železničná doprava. Mestská hromadná doprava má tu dve zástavky, ktoré sú zásadné na nosnej trati MHD. Prechádzajú ňou 4 trolejbusové linky a 14 autobusových liniek. Prímestská autobusová doprava a železničná doprava tu majú svoje hlavné stanice v meste. Mestská hromadná doprava prepravila cez prestupný uzol v roku 2016 3 520 tisíc cestujúcich, čo je pri ročnom počte všetkých prepravených cestujúcich DPMP 32 082 tisíc, 10,97 % všetkých cestujúcich MHD. Autobusová doprava prepravila cez prestupný uzol 1 874 tisíc osôb a železničná doprava 1 917 tisíc svojich klientov. V roku 2016 tak cestovalo cez prestupný uzol spolu 7 311 tisíc cestujúcich. Hlavným cieľom projektu je zvýšiť atraktivitu a konkurencieschopnosť verejnej osobnej dopravy prostredníctvom zlepšenie infraštruktúry prestupného uzla vrátane zlepšenia informovanosti cestujúcich. Modernizácia uzla bude pozostávať z rekonštrukcie podchodu a zastávky MHD pri ŽSR, zastávky MHD pri SAD, spevnených plôch, rekonštrukcie vozovky, vybudovania stojanov na bicykle pri ŽSR, rekonštrukcie NN rozvodov a prekládky VN rozvodov. Súčasťou projektu je aj eskalátor vedúci z podchodu na zástavku ŽSR a výťahy vedúce z podchodu na obidve zastávky a bezpečnostné cestné zábradlie, ktoré bude umiestnené v strede vozovky. Projekt bude realizovaný v rámci jednej etapy s názvom „Modernizácia prestupného uzla". Začiatok realizácie hlavnej aktivity je stanovený na 11/2017 po plánovanom podpise zmluvy s externým dodávateľom. Predpokladaný koniec realizácie hlavnej aktivity projektu je stanovený na termín 12/2018. Predpokladaná dĺžka trvania hlavnej aktivity projektu je 14 mesiacov. Realizáciou projektu mesto naplní 3 merateľné ukazovatele:P0354 Počet prestupných uzlov - 1P0473 Počet vybudovaných a modernizovaných integrovaných zastávok - 2 P0565 Počet zavedených parkovacích systémov - 1 (Slovak)
0 references
The subject of the project is the modernisation of the transfer node on Masaryk Street in Prešov. From the point of view of public transport, this is the key and most frequent transfer point in the city and in the region. Three modes of transport meet here, namely public transport, bus transport and rail transport. Urban public transport has two stops, which are essential on the carrier track of public transport. There are 4 trolleybus lines and 14 bus lines. Suburban bus and rail transport here have their main stations in the city. Urban public transport carried 3 520 thousand passengers through a connecting node in 2016, which, with the annual number of all DPMP passengers, is 32 082 thousand, 10.97 % of all public transport passengers. Bus transport transported 1 874 thousand people through the connecting node and 1 917 thousand of its clients by rail. In 2016, a total of 7 311 thousand passengers traveled through the transfer node. The main objective of the project is to increase the attractiveness and competitiveness of public passenger transport by improving the node infrastructure, including by improving passenger information. Modernisation of the node will consist of reconstruction of the underpass and stop of public transport at ŽSR, public transport stop at SAD, paved areas, road reconstruction, construction of bicycle stands near ŽSR, reconstruction of LV distributions and transfer of HV distributions. Part of the project is also an escalator leading from the underpass to the stop of ŽSR and elevators leading from the underpass to both stops and safety railings, which will be located in the middle of the road. The project will be implemented in a single phase called “Modernisation of the transfer node”. The start of implementation of the main activity is set at 11/2017 after the planned signature of the contract with an external contractor. The expected end of the implementation of the main activity of the project is set for the deadline of 12/2018. The expected duration of the main activity of the project is 14 months. By implementing the project, the city will fill 3 measurable ukazovatele:P0354 Number of transfer nodes – 1P0473 Number of built and upgraded integrated stops – 2 P0565 Number of installed parking systems – 1 (English)
28 September 2021
0 references
Identifiers
302011F457
0 references