Energy saving measures (Q3060598): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in fr: translated_label) |
(Created claim: summary (P836): Optimisation du chauffage — Wiener Neustadt, Neunkirchner Straße 90, Actions d’économie d’énergie, Wiener Neustadt, translated_summary) |
||||||||||||||
Property / summary | |||||||||||||||
Optimisation du chauffage — Wiener Neustadt, Neunkirchner Straße 90, Actions d’économie d’énergie, Wiener Neustadt (French) | |||||||||||||||
Property / summary: Optimisation du chauffage — Wiener Neustadt, Neunkirchner Straße 90, Actions d’économie d’énergie, Wiener Neustadt (French) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: Optimisation du chauffage — Wiener Neustadt, Neunkirchner Straße 90, Actions d’économie d’énergie, Wiener Neustadt (French) / qualifier | |||||||||||||||
point in time: 27 November 2021
|
Revision as of 09:41, 27 November 2021
Project Q3060598 in Austria
Language | Label | Description | Also known as |
---|---|---|---|
English | Energy saving measures |
Project Q3060598 in Austria |
Statements
111,069.0 Euro
0 references
11 June 2018
0 references
31 December 2019
0 references
Porsche Konstruktionen GmbH & Co KG
0 references
30401
0 references
Heating optimisation – Wiener Neustadt, Neunkirchner Straße 90, Betr. Energiesparmaßnahmen, Wiener Neustadt (English)
20 July 2021
0 references
Heizungsoptimierung - Wiener Neustadt, Neunkirchner Straße 90, Betr. Energiesparmaßnahmen, Wiener Neustadt (Austrian German)
0 references
Optimisation du chauffage — Wiener Neustadt, Neunkirchner Straße 90, Actions d’économie d’énergie, Wiener Neustadt (French)
27 November 2021
0 references
Wiener Neustadt
0 references
Identifiers
AUST-314
0 references