Construction of the premises of the UFR SANTE on the site of Saint-Pierre phase 1 — component "Studies (phase 1 and 2) and works/1st equipment (phase 1) (part OT 1) (Q3713356): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string)
(‎Changed label, description and/or aliases in de: translated_label)
label / delabel / de
 
Bau der Räumlichkeiten des UFR SANTE am Standort Saint-Pierre Phase 1 – Teil "Studien (Phase 1 und 2) und Arbeiten/1. Ausrüstung (Phase 1) (Teil OT 1)

Revision as of 02:29, 27 November 2021

Project Q3713356 in France
Language Label Description Also known as
English
Construction of the premises of the UFR SANTE on the site of Saint-Pierre phase 1 — component "Studies (phase 1 and 2) and works/1st equipment (phase 1) (part OT 1)
Project Q3713356 in France

    Statements

    0 references
    8,000,000.0 Euro
    0 references
    10,502,110.0 Euro
    0 references
    76.18 percent
    0 references
    1 November 2016
    0 references
    31 December 2020
    0 references
    UNIVERSITÉ DE LA RÉUNION
    0 references
    0 references
    L’Université de la Réunion réalisera la construction de locaux de recherche et d’enseignement pour l’UFR santé sur un site unique pour regrouper toutes les formations en santé et favoriser notamment les échanges et interactions entre ces entités formations et recherche. (French)
    0 references
    The University of Réunion will carry out the construction of research and teaching facilities for the health UFR on a single site to bring together all health training courses and in particular to promote exchanges and interactions between these entities training and research. (English)
    22 November 2021
    0 references

    Identifiers

    RE0014523
    0 references