Ecological Corridor — Boulevard Nature Phase 2014-2016 (Q3699249): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string)
(‎Changed label, description and/or aliases in de: translated_label)
label / delabel / de
 
Ökologischer Korridor – Boulevard Nature Phase 2014-2016

Revision as of 16:23, 26 November 2021

Project Q3699249 in France
Language Label Description Also known as
English
Ecological Corridor — Boulevard Nature Phase 2014-2016
Project Q3699249 in France

    Statements

    0 references
    289,745.59 Euro
    0 references
    1,158,982.34 Euro
    0 references
    25.0 percent
    0 references
    1 January 2014
    0 references
    31 December 2016
    0 references
    LE MANS METROPOLE
    0 references
    0 references
    Le projet de création d’un corridor écologique dit « Boulevard Nature » porté par Le Mans métropole concerne des travaux de création et d’amélioration d’une voie cyclable aménagée en voie verte favorable au développement d’une biodiversité et permettant la reconnexion des espaces naturels entre eux. Il vise ainsi la restauration des continuités écologiques à l’échelle du territoire de l’agglomération pour répondre aux objectifs de la trame verte inscrits dans le schéma régional de cohérence écologique. (French)
    0 references
    The project to create an ecological corridor called “Boulevard Nature” carried out by Le Mans metropolis concerns the creation and improvement of a cycle path developed as a green lane favourable to the development of biodiversity and allowing the reconnection of natural spaces between them. It thus aims to restore ecological continuity at the level of the agglomeration territory in order to meet the objectives of the green frame set out in the regional ecological coherence scheme. (English)
    22 November 2021
    0 references

    Identifiers

    PL0004328
    0 references