Security works for drinking water production station Peuplier Seul (Nevers) (Q193457): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
(‎Changed label, description and/or aliases in de: translated_label)
label / delabel / de
 
Sicherungsarbeiten Trinkwasseraufbereitungsanlage des Volkes Allein (Nevers)

Revision as of 13:30, 26 November 2021

Project Q193457 in France
Language Label Description Also known as
English
Security works for drinking water production station Peuplier Seul (Nevers)
Project Q193457 in France

    Statements

    0 references
    0 references
    309,000.0 Euro
    0 references
    1,610,189.94 Euro
    0 references
    19.19 percent
    0 references
    1 June 2018
    0 references
    31 December 2020
    0 references
    Communauté d'agglomération de Nevers
    0 references

    46°59'22.56"N, 3°9'32.40"E
    0 references
    58027
    0 references
    Cette opération déposée par la Communauté d'agglomération de Nevers consiste à réaliser des travaux d'extension et de réhabilitation de l'usine de traitement de l'eau potable du Peuplier seul de Nevers. Ces travaux consistent à rendre cet équipement moins vulnérable aux inondations de Loire. L'objectif est de poursuivre le traitement de la potabilisation de l'eau, et donc sa distribution, en période de crue et en période post-crue. Cette opération contribue à réduire la vulnérabilité des populations et des activités des territoires particulièrement exposés au risque inondation (en l’occurrence le territoire à risque important d'inondation de Nevers). Cette opération est déposée au titre de l'action 2 du POI FEDER bassin de la Loire 2014-2020. (French)
    0 references
    This operation filed by the Community of agglomeration of Nevers consists of carrying out work to extend and rehabilitate the drinking water treatment plant of Peuplier alone in Nevers. This work involves making this equipment less vulnerable to flooding in the Loire. The objective is to continue the treatment of water potabilisation, and hence its distribution, in flood and post-crue periods. This operation contributes to reducing the vulnerability of populations and activities in territories particularly exposed to flood risk (in this case the territory with a high risk of flooding of Nevers). This operation is deposited under Action 2 of the ERDF POI ERDF Basin of the Loire 2014-2020. (English)
    13 October 2020
    0 references
    Vue aérienne de l’usine d’eau potable de Nevers. (English)
    Cabinet AB Warnant/Nevers Agglomération (2018)
    0 references

    Identifiers

    12286
    0 references
    5376
    0 references