Reconstruction of the crossing of the Adriatic region and of Dubrovnik — Remomenec (Q2734683): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string)
(‎Changed label, description and/or aliases in fr: translated_label)
label / frlabel / fr
 
Reconstruction de l’intersection de l’avenue Adriatique et de l’avenue Dubrovnik — Rotor Remetinec

Revision as of 12:27, 26 November 2021

Project Q2734683 in Croatia
Language Label Description Also known as
English
Reconstruction of the crossing of the Adriatic region and of Dubrovnik — Remomenec
Project Q2734683 in Croatia

    Statements

    0 references
    272,813,628.38 Croatian kuna
    0 references
    35,465,771.69 Euro
    2 June 2021
    0 references
    320,957,209.87 Croatian kuna
    0 references
    41,724,437.28 Euro
    2 June 2021
    0 references
    85.0 percent
    0 references
    27 March 2019
    0 references
    30 November 2020
    0 references
    Grad Zagreb
    0 references
    Q2761416 (Deleted Item)
    0 references

    45°50'5.46"N, 15°58'14.74"E
    0 references
    10000
    0 references
    Rotor Remetinec predstavlja izuzetno važan pristup cestovnoj mreži TEN-T, no sadašnja verzija je projektirana za gotovo dvostruko manji kapacitet prometa od trenutnog te je najnesigurnije raskrižje u Zagrebu. Cilj rekonstrukcije rotora Remetinec je povećanje njegove protočnosti i sigurnosti, koji će se ostvariti rasterećenjem dijela prometa kružnog toka, odnosno prometa u smjeru istok-zapad te isključenjem mogućnosti preplitanja automobila između prometnih traka u samom kružnom toku. Krajnji korisnik projekta je opća populacija. (Croatian)
    0 references
    The Remetinec rotor presents an extremely important approach to the TEN-T road network, but the current version is designed for almost double lower traffic capacity than the current one and is the least safer from Zagreb. The aim of rebuilding a Remenetic rotor is to increase its fluidity and safety, which will be achieved by relieving a part of the flow of the flow of circular and East-West traffic and by excluding the possibility of circulation of cars between lanes within the circular process itself. The final beneficiary of a project is the general population. (English)
    3 June 2021
    0 references

    Identifiers

    KK.07.1.1.08.0001
    0 references