Energy efficiency works at Orastie Municipal Hospital (Q2744892): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the materialized bot - inferring region from the coordinates)
(‎Changed label, description and/or aliases in fr: translated_label)
label / frlabel / fr
 
L’efficacité énergétique fonctionne à l’hôpital municipal d’Orastie

Revision as of 09:36, 26 November 2021

Project Q2744892 in Romania
Language Label Description Also known as
English
Energy efficiency works at Orastie Municipal Hospital
Project Q2744892 in Romania

    Statements

    0 references
    10,909,962.17 Romanian Leu
    0 references
    2,181,992.434 Euro
    13 September 2021
    0 references
    12,835,249.61 Romanian Leu
    0 references
    2,567,049.9220000003 Euro
    13 September 2021
    0 references
    85.0 percent
    0 references
    13 June 2018
    0 references
    28 February 2022
    0 references
    SPITALUL MUNICIPAL ORASTIE
    0 references
    0 references

    45°50'12.34"N, 23°11'45.06"E
    0 references
    Imbunatatirea eficientei energetice, a gestionarii inteligente a energiei, a reducerii emisiilor de carbon si a utilizarii energiei din surse regenerabile a Spitalului Municipal Orastie prin lucrari specifice. Prin masurile preconizate, la finalul implementarii proiectului, consumul anual de energie primara la nivelul Spitalului Municipal Orastie se va reduce de la 3008847,17 kwh/an la 808189,70 kwh/an (reducere de 73,14%) iar nivelul anual al gazelor cu efect de seră (echivalent tone de CO2) se va reduce de la 519,1 t/an la 136,90 t/an. Prin implementarea proiectului Spitalul Municipal Orastie isi propune atingerea urmatoarelor Obiective specifice: (Romanian)
    0 references
    Improving energy efficiency, smart energy management, reducing carbon emissions and using renewable energy at City City Hospital through specific works. By the measures envisaged, at the end of the project implementation, the annual primary energy consumption at the Municipal Hospital of Orastie will be reduced from 3008847.17 kwh/year to 808189.70 kwh/year (reduction of 73.14 %) and the annual level of greenhouse gases (equivalent to tonnes of CO2) will be reduced from 519.1 t/year to 136.90 t/year. By implementing the project Municipal Hospital Orastie aims to achieve the following specific objectives: (English)
    14 September 2021
    0 references
    Municipiul Orăştie, Romania
    0 references

    Identifiers

    115658
    0 references